Introduction

Researchers presume in the standard EOQ models, that the value of inventory commodities is unaltered by the length of time. In practice, however many items depreciate during the usual storage stage. Volatile liquids, green vegetables, blood accumulated in blood banks, chemicals and electronic gears decline considerably. Deterioration means decompose, damage, spoilage, fading, or aeration out of foodstuffs. Therefore, the ideal case visualizes by the conventional model remains a perfect one.

At present scenario, researchers are facing a major problem to analyze the practical and actual work problem in the correct environment. In this environment supplier has to offer a number of discounts for their clients for concession in the permissible delay period. Delayed payment might be considered to enhance sales. Large number of elements disturbed the smooth transaction and business process as like, lock off, labour problem, earth quake etc.

Most of the commodities lose their originality at the time passes as like, bread, seasonal vegetable, fruits, food stuffs etc. having more deterioration is comparison to other items. Some commodities like medicine, electronic products, machine with fixed life span.

Classical inventory model was established in the year 1915 in which demand was constant, while in actual practice, it is in a dynamic state. Some internal factor such as selling price and availability for a particular product made by manufacturer affect the smooth business transaction. In this study, demand rate is considered stock-sensitive. Goh [1] designed the unbroken, unlimited horizon inventory scheme where the demand in stock-dependent. Tripathi [2] established an EOQ model for price-linked demand and different carrying cost function. Affares [3] designed an EOQ inventory model for stock-associated demand and shortage with time—linked carrying cost. Taleizadeh and Noori-daryan [4] designed pricing, industrialized and inventory strategies for unprocessed objects in a three-stage supply chain. Tripathi [5] studied a model for spoilage commodities with linearly time-linked demand rate under permitted delay. Goyal and Change [6] pointed out an ordinary-transfer an EOQ model for determining the vendor’s optimal order quantity and a number of transfers from the warehouse to the exhibit area. Soni and Shah [7] considered an optimal ordering policy for retailer when customers’ demand is stock-sensitive and supplier suggest progressive credit period. Khanra et al. [8] designed an EOQ model for deteriorating item and quadratic time-linked demand under trade credits. Other related studies based on variable demand are: Kumar and Sana [9], Chowdhury [10], Tripathi and Mishra [11].Tripathi [12], Guchhait et al. [13], Ghiami and Williams [14], Hsieh and Dye [15], Ouyang et al. [16] etc.

The delay in payment is an actual part is business transaction to enhance demand for a short run span, it dominates the cost of the business system like: holding cost, ordering cost and total cost. Tripathi and Chaudhary [17] developed an EOQ model for Weibull distribution decline with inflation and permitted delay in payments. Teng et al. [18] established an EOQ model under trade credit financing by means of growing demand. A number of related studies have been presented by; Chakrabarty et al. [19], Taleizadeh et al. [20], Mishra [21], Dave [22], Liao et al. [23], Tripathi et al. [24], Jiangtao et al. [25], Soni [26], Wu et al. [27] in this direction.

The problem of deteriorating inventory has taken strong concentration in the present scenario. Several researchers have considered constant deterioration rate is their inventory models. However, in real life it is not always steady. One simple example of variable deterioration is Weibull distribution which differs with time. Geetha and Udayakumar [28] presented an EPQ model for deteriorating items with price and advertisement dependent demand under partial backlogging. Yang [29] designed an EOQ model for deteriorating item with inflation and two level of storage. Min [30] presented a model for spoilage commodities under inventory-sensitive demand and two-level trade credits. Tsao and Sheen [31] established dynamic pricing promotion problem for deteriorating items. Some articles related to deterioration like: Chen et al. [32], Taleizadeh et al. [33], Chang et al. [34], Taleizadeh and Noori- daryan [35], Taleizadeh et al. [36].

In this paper, EOQ models are presented for items with stock-linked demand under deterioration. The specific threshold is compared with order quantity. We also compare threshold with permissible delay. The main idea of the model is to settle on least total cost.

The rest part of the study is arranged as follows: in the next portion 2, the assumption and notations used are given. In Sect. 3, mathematical model is obtained to decide minimum total cost/unit time. Numerical examples and sensitivity examination are provided in Sects. 4 and 5 respectively. We establish future research direction in Sect. 6.

Assumptions and Notations

Assumptions

The succeeding assumptions are made to buildup the model:

  1. (i)

    Deterioration rate is invariable.

  2. (ii)

    In case of order size exceeds as pre-determined quantity complete permissible delay period is offered.

  3. (iii)

    Demand is considered stock—sensitive (i.e. D(t) = α + β I(t), α > 0,0 < β < 1}.

  4. (iv)

    Shortages are not acceptable.

  5. (v)

    Time horizon is never-ending.

Notations

The following notations are used in the whole manuscript:

A:

Ordering cost

D(t):

Stock-dependent demand/year

W:

Specific threshold

\(\theta\):

Deterioration rate, (0 < θ < 1)

P:

Selling price

T:

Cycle time

C:

Purchasing cost

h:

Holding cost/unit/year

I(t):

Inventory level at any time ‘t

Ie and Ic:

Interest earned and charges/ year

M:

Permissible delay period

μ:

Permitted fraction of delay in payment

Q:

Order quantity

Tw:

Threshold time-period

T:

Cycle time

T0:

Time during \(\left( {1 - \mu } \right)Q\) units are depleted

\(IC\):

Total cost on interest

\(TE\):

Total interest earned

\(NTC_{i} \left( T \right)\):

Annual non-identical part of cost function, \(i = 1 - 3\)

ATCi(T):

Annual total cost, \(i = 1 - 3\)

Mathematical Formulation

The following differential equation represents the change of I(t)

$$ \frac{dI\left( t \right)}{{dt}} + \gamma I\left( t \right) = - \left\{ {\alpha + \beta I\left( t \right)} \right\};\quad 0 \le t \le T{ ,}\quad {\text{I}}\left( T \right) = 0 $$
(1)

The, order quantity:

$$ Q = I\left( 0 \right) = \alpha T\left\{ {1 + \frac{\beta T}{2} + \frac{{T^{2} }}{6}\left( {\beta^{2} + \gamma } \right)} \right\} $$
(2)

From  (2), the time throughout which W units are exhausted is attained as follows:

$$ T_{w} = \frac{{\sqrt {1 + \frac{\beta W}{\alpha }} - 1}}{\beta } $$
(3)

If \(Q > W\left( {T > T_{w} } \right)\), completely permissible delay is allowed. Consumer must pay \(\left( {1 - \mu } \right)CQ\) and pay off \(\mu CQ\) at the closing stages of delay phase.

\(T_{0}\) is defined as the time in which \(\left( {1 - \mu } \right)Q\) units are exhausted, from (2), we get

$$ T_{0} = \frac{{\beta \left( {1 - \mu } \right)}}{{2\alpha^{2} }}\quad \left( {{\text{approx}}.} \right) $$
(4)

It should be noted that parameters M, Tw, T0 and T are constraints that have affects the capital cost. We can consider only cases.

Identical Costs

Identical related costs are: ordering cost (OC), carrying cost (HC) and purchasing cost (PC);

$$ OC = \frac{A}{T} $$
(5)
$$ HC = \frac{h}{T}\int_{0}^{T} {I\left( t \right)} dt = \frac{h\alpha T}{6}\left\{ {3 + \beta T + \left( {\beta^{2} - \gamma } \right)T^{2} } \right\},\quad \left( {{\text{approx}}.} \right) $$
(6)
$$ PC = \frac{CQ}{T} = C\alpha \left\{ {1 + \frac{\beta T}{2} + \frac{{T^{2} }}{6}\left( {\beta^{2} + \gamma } \right)} \right\},\quad \left( {{\text{approx}}.} \right) $$
(7)

The identical cost of the system is:

$$ ITC\left( T \right) = OC{\text{ + HC + PC}}\quad \left( {\text{see in Appendix I}} \right) $$
(8)

Non-Identical Terms

As stated, because of unlike values of \(T_{w}\) and \(M\), two group of \(M \ge T_{w}\) and \(M < T_{w}\) may take place. Now for every case of the opening set, where \(M \ge T_{w}\), IC and IE will be derived.

Case 1

Tw ≤ M ≤ T.

In this consideration, the credit period is shorter than cycle time. The pictorial representation is as follows:

From the Fig. 1, we get

$$ \begin{aligned} IC & = \frac{{I_{k} C}}{T}\int\limits_{M}^{T}{I\left( t \right)} dt \\ & = \frac{{I_{k} C\alpha }}{T}\left[{\frac{{T^{2} }}{2}} \right. + \frac{{\beta T^{3} }}{6}\left\{ {3 +\left( {\beta^{2} + \gamma } \right)} \right\} - \frac{MT}{3}\left\{{6 + T^{2} \left( {5\gamma - 4\beta^{2} } \right)} \right\} \\& \quad - \frac{{M^{2} }}{2}\left\{ {2 - \beta } T + T^{2} \left({3\gamma - 2\beta^{2} } \right)\right. +\frac{{\beta T^{3} }}{6} \left. \left( {2\left( {\beta^{2} + \gamma }\right) + 9\beta \left( {\gamma - \beta^{2} } \right)} \right) \right\} \\& \quad + \frac{{M^{3} }}{12}\left\{ - 6\beta + 6T\left({\gamma - \beta^{2} } \right) \right. \left. \left. + 3\beta T^{2} \left( {\gamma -\beta^{2} } \right) + T^{3} \right\} \right] \\ \end{aligned} $$
(9)

and

$$ \begin{aligned} IE & = \frac{{I_{e} P}}{T}\int_{0}^{M} {\left\{ {\alpha + \beta I\left( t \right)} \right\}dt} \\ &= \frac{{I_{e} P\alpha }}{6T}\left[ {6 + \frac{{BM^{2} }}{2}} \right.\left\{ 6T + 3\beta T^{2} + T^{3} \left( {\beta^{2} + \gamma } \right) \right\} \\ &\quad- \left. \frac{{\beta M^{3} }}{3}\left\{ {6 + 6\beta T + 3\beta^{2} T^{2} + \beta T^{3} \left( {\beta^{2} + \gamma } \right)} \right\} \right] \end{aligned} $$
(10)

now,

$$ NTC_{1} \left( T \right) = \frac{{I_{k} C}}{T}\int_{M}^{T} {I\left( t \right)} dt - \frac{{I_{e} P}}{T}\int_{0}^{M} {\left\{ {\alpha + \beta I\left( t \right)} \right\}dt} $$
(11)

Therefore, the annual total cost is:

$$ ATC_{1} \left( T \right) = ITC + NTC_{1} \left( T \right)\quad \left( {\text{see Appendix I}} \right) $$
(12)
Fig. 1
figure 1

Graph between time and I(t) (Tw ≤ M ≤ T)

Case 2

Tw ≤ T ≤ M.

In this case, the permissible delay period is longer than cycle time, then interest charged and interest earned both will considered in the calculation of total inventory cost.

From Fig. 2, we getand

$$ IC = \frac{{I_{e} P}}{T}\int_{0}^{T} {\left\{ {\alpha + \beta I\left( t \right)} \right\} \, } t \, dt = \frac{{I_{e} P\alpha T}}{12}\left[ {6 + 2\beta T - \beta^{2} T^{2} } \right] $$
$$\begin{aligned}IE &= \frac{{I_{e} P}}{T}\int_{M}^{T} {\left\{ {\alpha + \beta I\left( t \right)}\right\}dt}\\&= I_{e} P\alpha \left[ \left\{ 1 - \frac{M}{T} + \beta T + \beta^{2}T^{2} + \frac{{\beta T^{3} }}{6}\left( {\beta ^{2} + \gamma} \right) \right\} \right.\\&\quad - \left.\beta M\left\{ 1 + \frac{{\beta T}}{2} +\frac{{T^{2}}}{6}\left( {\beta ^{2} + \gamma } \right) \right\} -\frac{{\beta T}}{2}\left\{ 1 + \beta T + \frac{{\beta T^{2} }}{2}\right\}\right.\\&\quad - \left.\frac{{\beta M^{2} }}{2}\left\{\frac{1}{T} + \beta + \frac{{\beta ^{2} T}}{2} + \frac{{\beta T^{2}}}{6}\left( {\beta ^{2} + \gamma } \right) \right\} + \frac{{\beta T^{2} }}{6}\left\{\beta - \left( {\gamma - \beta ^{2} } \right)T \right\}\right.\\&\quad +\left. \frac{{\beta M^{3} }}{3}\left\{ - \frac{\beta }{{2T}} + \left( {\frac{1}{2} + \frac{{\beta T}}{4} + \frac{{T^{2}}}{{12}}\left( {\beta ^{2} + \gamma } \right)} \right)\left({\gamma - \beta ^{2} } \right) \right\} \right]\end{aligned} $$
(13)

Therefore,

$$ NTC_{2} \left( T \right) = - \frac{{I_{e} P}}{T}\int_{0}^{T} {\left\{ {\alpha + \beta I\left( t \right)} \right\}} t\,dt - \frac{{I_{e} P}}{T}\int_{M}^{T} {\left\{ {\alpha + \beta I\left( t \right)} \right\}dt} $$
(14)

and,

$$ ATC_{2} \left( T \right) = ITC + NTC_{2} \left( T \right)\quad \left( {\text{see Appendix I}} \right) $$
(15)
Fig. 2
figure 2

Graph between time and I(t) (Tw ≤ T ≤ M)

Case 3

T ≤ Tw ≤ M.

In this case, the trade credit phase is shorter than specific threshold time.

From Fig. 3, we search out the total cost for this case is as follows:

$$ \begin{aligned} NTC_{3} \left( T \right) & = \frac{{I_{k} C}}{T}\int_{0}^{{T_{0} }} {I\left( t \right)} dt - \frac{{I_{k} C}}{T}\mu QT_{0} - \frac{{I_{e} P}}{T}\int_{0}^{M} {\left\{ {\alpha + \beta I\left( t \right)} \right\}{\text{ t }}dt} \\ & \quad - \frac{{I_{e} P}}{T}\int_{M}^{T} {\left\{ {\alpha + \beta I\left( t \right)} \right\}dt} \\ \end{aligned} $$
(16)

and,

$$ ATC_{3} \left( T \right) = ITC + NTC_{3} \left( T \right){\text{ (see Appendix I)}} $$
(17)

Optimal value of \(T_{i}\) is obtained on putting \(\frac{{dTAC_{i} }}{dT} = 0,i = 1 - 3\) (See Appendix I).

Fig. 3
figure 3

Graph between time and inventory level (T < Tw ≤ M)

It is difficult to find \(\frac{{d^{2} TAC_{i} }}{{dT^{2} }} > 0 \, ,{\text{ for i}} = 1 - 3\), we can show numerically in the numerical examples and sensitivity analysis.

Note

The remaining mathematical calculations are given in the Appendix.

Numerical Examples

In this part, the model is demonstrated by numerical explanations for three unlike cases with Mathematica 9.0 software.

Example 1. (Case 1)

\(T_{w} \le M \le T\).

Let us consider A = 50, h = 5, α = 1000, β = 0.1, γ = 0.5, \(M = 1\), \(I_{k} = 0.1\), \(I_{e} = 0.01\), \(C = 5\), \(P = 100\) in appropriate units. Putting these in (A8) and calculating for T, we get, \(T_{1}^{*} = 1.7355\), corresponding, \(Q^{*} = 2330.41\),\(ATC_{1}^{*} = 6269.93\) and \(\frac{{d^{2} ATC_{1} }}{dT} = 212165.0 > 0.\)

Example 2. (Case 2)

\(T_{w} \le T < M\).

On considering A = 50, h = 5, α = 1000, β = 0.1, γ = 0.5,\(M = 1\), \(I_{k} = 0.1\), \(I_{e} = 0.01\), \(C = 5\), \(P = 100\) in proper units. On substituting these in (A9) and calculating for T, we obtain \(T_{2}^{*} = 0.69123\), corresponding, \(Q^{*} = 743.193\), \(ATC_{2}^{*} = 7316.46\) and \(\frac{{d^{2} ATC_{2} }}{dT} = 6011.97 > 0.\)

Example 3. (Case 3)

\(T < T_{w} \le M\).

Let us take A = 40, h = 8, α = 800, β = 0.1, γ = 0.5, M = 1,\(I_{k} = 0.1\), \(I_{e} = 0.01\), \(C = 5\), \(P = 80\),\(\mu = 0.2\) in suitable units. Substituting these in (A10) and solving for T, we get T3* = 0.47872, corresponding Q* = 399.603, ATC3* = 6413.49, and \(\frac{{d^{2} ATC_{3} }}{{dT^{2} }} = 12386.9 > 0.\)

Sensitivity Analysis

Sensitivity analysis is a significant component of any kind of business transaction for both vendors and buyers; it affects the whole transaction system. We know that any type of business is a long taking process, depends on nature and future planning, while future planning’s are unsure and estimated by their elements like weather, lock off, strikes etc.

Case 1 Taking all numerical values discussed in Ex. 1, shifting one constraints at a time, preserving residual constraints identical.

From Table 1, the following deductions can be made:

  1. (i)

    Boost of \(c\), \(\beta\) and \(\alpha\) resulting, increase of \(T_{1}^{*}\), \(Q^{*}\) and \(ATC_{1}^{*}\).It mean that the optimal values move in the identical direction with \(c\), \(\beta\) and \(\alpha .\)

  2. (ii)

    Argument of \(A\), r and \(h\) leading, decrease of \(T_{1}^{*}\), \(Q^{*}\) and \(ATC_{1}^{*}\).It shows that T1*, Q* and ATC1* move in the toward the back direction with \(A\), r and \(h.\)

  3. (iii)

    Boost of \(I_{e}\) and \(p\) resulting, increase in \(T_{1}^{*}\), \(Q^{*}\) and decrease in \(ATC_{1}^{*}\).

Table 1 (a) Variation of T1*, Q1* and ATC1* with different parameters

Case 2 Taking all numerical values from example 2. On fluctuating one constraint at a time and keeping rest parameters unvarying.

From Table 2 the following deductions can be reviewed.

  1. (i)

    Increase of \(c\), \(\beta\) and \(h\) lead decrease of \(T_{2}^{*}\), \(Q^{*}\) and increase of \(ATC_{2}^{*}\). It means that T2* and Q*, move in opposite direction with \(c\), \(\beta\) and \(h\), while total cost parallel to \(c\), \(\beta\) and \(h\).

  2. (ii)

    Increase of M, r, A and P causes, augment in \(T_{2}^{*}\), \(Q^{*}\) and \(ATC_{2}^{*}\) It shows that all optimal values move in the similar direction.

Table 2 Variation of T2*, Q2* and ATC2* with different parameters

Case 3 Taking all numerical values discussed in Ex. 3, varying one parameter at a time and keeping rest parameters same.

Note

Some graphs on sensitivity investigations are provided in the Appendix II.

From the above Table 3 following inferences can be summarized.

  1. (i)

    Increase of \(c\), \(\beta\) and \(h\) lead, decrease in \(T_{3}^{*}\), \(Q^{*}\) and increase in \(ATC_{3}^{*}\).It shows that T3* and Q* move opposite to c, β and h, while ATC3* move alike to c, β and h.

  2. (ii)

    On increasing \(\alpha\), diminish in T3*, while increase in Q*and ATC3*.

  3. (iii)

    On increasing γ,\(A\),\(P\) and \(M\), increase in \(T_{3}^{*}\), \(Q^{*}\) and \(ATC_{3}^{*}\). It shows that parameters and optimal values move the similar way.

Table 3 Variation of T3*, Q* and ATC3* with various parameters

Conclusion and Future Research

In this study EOQ models are developed for deteriorating commodities with stock-linked demand considering three dissimilar situations. We assumed that spoilage rate is constant. Mathematical formulations are provided for three models to find optimal solution and corresponding examples are conversed to validate the EOQ models.

This paper also offered a realistic submission illustration, in which the projected EOQ model is employed to hold up trade assessment. Mainly, the model presented in the learning could be helpful in the area of supply string administration. Our consequence demonstrates that this model can be relatively functional in determining the best possible ordering strategy, in which the permitted delay period is being investigated. The planned model can be used in inventory control of convinced decomposing commodities such as pictorial film, electronic components, and radioactive equipments which display stock-sensitive utilization.

Sensitivity examination with the variation of several parameters is also conversed from managerial point of view. Following main point will be kept in mind for vendors and buyers.

  1. (i)

    Purchase cost, optimal cycle time, order quantity and total cost do not move in the same direction, it means that vendor and buyer has to take precaution during transaction process.

  2. (ii)

    Deterioration rate, optimal cycle time and total cost of all time cases are uniform.

A usual generalization of the model would be to study that the case of gaps in the trade credit periods. In addition, this research can be generalized for deteriorating items with a two-parameter Weibull distribution. The planned model can further integrate more sensible suppositions, such as stochastic demand and trapezoidal fuzzy demand. The study can be extended by taking into account discount, shortage and time value money. The consideration of price-sensitive demand is another fulltime research direction. We may also generalized by taking deterioration is variable etc.