Abstract
The Bohai Sea is the immense inland sea in China and the Bohai Strait is a sea graben from East China to Northeast China which lies between the Jiaodong Peninsula and the Liaodong Peninsula. Considering the forthcoming Bohai Strait subsea tunnel, the authors selected nine indicators including seabed topography, stratigraphic lithology, geological structure, earthquake, environmental impact, engineering scale, ventilation conditions, residents’ satisfaction, and landing position. These indicators are considered as evaluation indexes to evaluate three alternative routes of the Bohai Strait subsea tunnel: line A, line B, and line C. In this paper, the evaluation model of the Bohai Strait subsea tunnel based on analytic hierarchy process (AHP) and extension theory is established. In this regard, the grade of route selection is divided into four categories: excellent, good, average, and bad. Finally, through the model calculations, it is concluded that line B of the Bohai Strait subsea tunnel is the best, and line A is the worst. This method provides a new idea for the evaluation of subsea tunnel site selection and also represents some references for other types of engineering site selection.
Article PDF
Similar content being viewed by others
Avoid common mistakes on your manuscript.
Reference
Anguera R (2006) The channel tunnel — An ex post economic evaluation. Transportation Research, Part A (Policy and Practice) 40(4):291–315, DOI: https://doi.org/10.1016/j.tra.2005.08.009
Cai W (1999) Extension theory and its application. Chinese Science Bulletin 44(17):1538–1548, DOI: https://doi.org/10.1007/BF02886090
Cheng XS, Zhang XY, Chen WJ, Xu WW (2017) Stability analysis of a cross-sea tunnel structure under seepage and a bidirectional earthquake. International Journal of Geomechanics 17(9):06017008, DOI: https://doi.org/10.1061/(ASCE)GM.1943-5622.0000937
Dahlø TS, Nilsen B (1994) Stability and rock cover of hard rock subsea tunnels. Tunnelling and underground Space Technology 9(2):151–158, DOI: https://doi.org/10.1016/0886-7798(94)90026-4
Dong YC, Zhang GQ, Hong WC, Xu YF (2010) Consensus models for AHP group decision making under row geometric mean prioritization method. Decision Support Systems 49:281–289, DOI: https://doi.org/10.1016/j.dss.2010.03.003
Eisenstein ZD (1994) Large undersea tunnels and the progress of tunnelling technology. Tunnelling and Underground Space Technology 9(3):283–292, DOI: https://doi.org/10.1016/0886-7798(94)90054-X
He Q, Li HX, Chen CL, Lee ES (2000) Extension principles and fuzzy set categories. Computers & Mathematics with Applications 39(1–2):45–53, DOI: https://doi.org/10.1016/S0898-1221(99)00312-0
Huang RQ, Li YR, Qu K, Wang K (2013) Engineering geological assessment for route selection of railway line in geologically active area: A case study in China. Journal of Mountain Science 10(4): 495–508, DOI: https://doi.org/10.1007/s11629-013-2660-2
Huang HW, Li QT, Zhang DM (2018) Deep learning based image recognition for crack and leakage defects of metro shield tunnel. Tunnelling and Underground Space Technology 77:166–176, DOI: https://doi.org/10.1016/j.tust.2018.04.002
Ishizaka A, Labib A (2011) Review of the main developments in the analytic hierarchy process. Expert Systems With Applications 38(11): 14336–14345, DOI: https://doi.org/10.1016/j.eswa.2011.04.143
Jung JH, Chung H, Kwon YS, Lee IM (2019) An ANN to predict ground condition ahead of tunnel face using TBM operational data. KSCE Journal of Civil Engineering 23(7):3200–3206, DOI: https://doi.org/10.1007/s12205-019-1460-9
Kim HS, Kim DK, Kho SY, Lee YG (2016) Integrated decision model of mode, line, and frequency for a new transit line to improve the performance of the transportation network. KSCE Journal of Civil Engineering 20(1):393–400, DOI: https://doi.org/10.1007/s12205-015-0575-x
Kitamura A (1986) Technical development for the Seikan tunnel. Tunnelling and Underground Space Technology 1(3–4):341–349, DOI: https://doi.org/10.1016/0886-7798(86)90017-9
Li Z, Xue Y, Qiu D, Xu ZH, Zhang XL, Zhou BH, Wang XT (2017) AHP-ideal point model for large underground petroleum storage site selection: An engineering Application. Sustainability 9(12):2343, DOI: https://doi.org/10.3390/su9122343
Nilsen B (1994) Analysis of potential cave-in from fault zones in hard rock subsea tunnels. Rock Mechanics & Rock Engineering 27(2):63–75, DOI: https://doi.org/10.1007/BF01020205
Nilsen B (2014) Characteristics of water ingress in Norwegian subsea tunnels. Rock Mechanics and Rock Engineering 47(3):933–945, DOI: https://doi.org/10.1007/s00603-012-0300-8
Qi JX, Ji HG, Peng H, Li HJ (2013) Earthquake risk analysis in the engineering area of Bohai Strait cross-sea channel. Journal of Geomechanics 19(1):93–103 (in Chinese)
Rahmat ZG, Niri MV, Alavi N, Goudarzi G, Babaei AA, Baboli Z, Hosseinzadeh M (2017) Landfill site selection using GIS and AHP: A case study: Behbahan, Iran. KSCE Journal of Civil Engineering 21(1):111–118, DOI: https://doi.org/10.1007/s12205-016-0296-9
Russell OR, Stanczuk DT, Everett JR (1980) Remote sensing for tunnel siting studies. Journal of Transportation Engineering 106(5):523–537
Saaty TL (1990) An exposition of the AHP in reply to the paper “Remarks on the analytic hierarchy process”. Management Science 36:259–268, DOI: https://doi.org/10.1287/mnsc.36.3.259
Sharifzadeh M, Karegar S, Ghorbani M (2013) Influence of rock mass properties on tunnel inflow using hydromechanical numerical study. Arabian Journal of Geosciences 6(1):169–175, DOI: https://doi.org/10.1007/s12517-011-0320-9
Sherman RG, Gay M, Ast WV, Chin KS (1994) Boston harbor outfall tunnel: An environmental imperative. Tunnelling & Underground Space Technology 9(3):309–322, DOI: https://doi.org/10.1016/0886-7798(94)90056-6
Song CY, Zhou SM (2011) The overall design of qingdao jiaozhou bay subsea tunnel. Advanced Materials Research 368–373:2971–2976, DOI: https://doi.org/10.4028/www.scientific.net/AMR.368-373.2971url
Vaidya OS, Kumar S (2006) Analytic hierarchy process: An overview of applications. European Journal of Operational Research 169(1): 1–29, DOI: https://doi.org/10.1016/j.ejor.2004.04.028
Wang IT (2013) Application of GIS on rapid evaluation for potential portal areas of tunnels. Applied Mechanics and Materials 479–480: 1056–1060, DOI: https://doi.org/10.4028/www.scientific.net/AMM.479-480.1056url
Wang YM, Ding JX, Song HY, Gao HL (2016) Study on the environmental impact of trans-bohai strait passageway engineering based on deep buried full tunnel scheme. Environmental Science and Management 41(7):170–175 (in Chinese)
Wang X, Li X, Chen P, Wu HB (2017) Preliminary considerations of the planning for bohai strait subsea tunnel. Atlantis Press 156:663–670, DOI: https://doi.org/10.2991/meici-17.2017.131
Wang MS, Song KZ (2013) Urgency and current construction conditions and preliminary scheme of Bohai Strait cross-sea channel. Journal of Beijing Jiaotong University 037(001):1–10 (in Chinese)
Xu BS, Li SC, Liu RC, Zhao CL (2016) Study on the reasonable cover thickness of a subsea tunnel with the numerical calculation criterion method. Fourth Geo-China international conference, July 25–27, Shandong, China, DOI: https://doi.org/10.1061/9780784480038.011
Xue YG, Kong FM, Li SC, Zhang LW, Zhou BH, Li GK, Gong HM (2020) Using Indirect testing methods to quickly acquire the rock strength and rock mass classification in tunnel engineering. International Journal of Geomechanics 20(5):05020001, DOI: https://doi.org/10.1061/(ASCE)GM.1943-5622.0001633
Xue Y, Zhang X, Li S, Qiu DH, Su MX, Li LP, Li ZQ, Tao YF (2018) Analysis of factors influencing tunnel deformation in loess deposits by data mining: A deformation prediction model. Engineering Geology 232:94–103, DOI: https://doi.org/10.1016/j.enggeo.2017.11.014
Xue YG, Zhou BH, Qiu DH, Su MX, Qu CQ, Zhang XL, Li ZQ (2019) A prediction model for overlying rock thickness of subsea tunnel: A hybrid intelligent system. Marine Georesources & Geotechnology 37(1):1–10, DOI: https://doi.org/10.1080/1064119X.2018.1550544
Yildirim V, Bediroglu S (2019) A geographic information system-based model for economical and eco-friendly high-speed railway route determination using analytic hierarchy process and least-cost-path analysis. Expert Systems 36(3):e12376, DOI: https://doi.org/10.1111/exsy.12376
Zhang N, Tan Z, Jin M (2015) Research on the technology of disaster prevention and rescue in high-altitude super-long railway tunnel. KSCE Journal of Civil Engineering 19(3):756–764, DOI: https://doi.org/10.1007/s12205-013-1248-2
Zhao D, Jia L, Wang M, Wang F (2016) Displacement prediction of tunnels based on a generalised Kelvin constitutive model and its application in a subsea tunnel. Tunnelling and Underground Space Technology 54:29–36, DOI: https://doi.org/10.1016/j.tust.2016.01.030
Acknowledgments
Much of the work presented in this paper was supported by the National Natural Science Foundations of China (Grant numbers 51379112, 51422904 and 40902084), and Shandong Provincial Natural Science Foundation (Grant number JQ201513). The authors would like to express appreciation to the reviewers for their valuable comments and suggestions that helped improve the quality of our paper.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Xue, Y., Qu, C., Su, M. et al. Comprehensive and Quantitative Evaluation of Subsea Tunnel Route Selection: A Case Study on Bohai Strait. KSCE J Civ Eng 25, 3540–3555 (2021). https://doi.org/10.1007/s12205-021-1564-x
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-021-1564-x