Abstract
The Dogancay T1 tunnel, projected within the scope of the Ankara-Istanbul high-speed train project, is being excavated entirely through clay and cohesionless units and is located in the North Anatolian Fault Zone (NAFZ). To determine the support system in the tunnel, innovative approaches require investigation through analytical and numerical methods to evaluate their suitability. The present study investigates rigid support systems, including the intermediate lining and pre-support excavation techniques in the new Austrian tunneling method (NATM), with 3D numerical analyses. The tunnel is in a seismically active zone, and the study also addresses the seismic sustainability of the proposed support system. The results of analyses showed that the proposed excavation and support system can be successfully implemented in the Dogancay T1 tunnel. The case study provides guidelines for investigating tunnel excavation and support systems in poor ground conditions in tectonically active zones.
Similar content being viewed by others
Explore related subjects
Discover the latest articles, news and stories from top researchers in related subjects.Avoid common mistakes on your manuscript.
1 Introduction
The Dogancay T1 tunnel in the north-western part of Türkiye lies between km: 124 + 660–127 + 548 of the Ankara-Istanbul high-speed train project, with a total length of 2888 m. Tunnel excavation was occurring from both tunnel entrances as of 2021. The longitudinal slope of the tunnel is 2.1%, the entrance altitude is 60 m, and it rises to 120 m at the exit. A significant part of the tunnel route passes through extremely poor lithological units and is within the North Anatolian Fault Zone, one of the most active fault zones in the World. According to the NATM (new Austrian tunneling method) support classes, the tunnel is excavated completely in squeezing and flowing rock classes. In these types of rock classes, the bench pilot tunnel system is used to stabilize the tunnel, but using this method, the tunnel excavation system is a very complex and difficult construction process.
For a long period, tunnels in weak grounds have been the subject of many studies (Dalgic, 2002; Lee and Schubert, 2008; Cao et al., 2018, 2020; Luo et al., 2018; Aksoy et al., 2016; Sakcali and Yavuz, 2019; Aygar and Gokceoglu, 2020 and Aygar and Gokceoglu 2021a). In recent years, depending on technological developments, tunneling with tunnel boring machines (TBMs) has been successfully applied in long tunnels excavated in weak rock and/or under adverse geological conditions (Farrokh and Rostami, 2009; Yagiz et al., 2009; Armaghani et al., 2016; Swannell et al., 2016; Adoko et al., 2017; Maleki and Dehnavi, 2018; Hasanpour et al. 2018; Eftekhari and Aalianvari, 2019; Alp and Apaydin, 2019; Komu et al., 2020). However, the NATM is still preferred in extremely heterogeneous geological environments with high uncertainty and relatively short tunnels. NATM is not a tunneling method but an approach covering all general principles of tunneling (Aygar, 2020). The NATM introduced in the 1960s by (Rabcewicz 1964a, Rabcewicz 1964b and Rabcewicz 1965) aims to maximize the self-carrying capacity of overburden. Considering this principle, several tunnels have been successfully completed (Barton, 2017; Taromi et al., 2017; Song and Yoo, 2018; Zhang et al., 2018a, b; Niedbalski et al., 2018; Li et al., 2019; Agbay and Topal, 2020; Satici and Topal, 2021; Aygar and Gokceoglu, 2021b and c; Kong et al., 2021). Aygar (2020) emphasized a wide range of opinions that each tunnel brings with a site-specific method, and the results obtained in a tunnel tend to serve as a guide for other tunnels. This statement is valuable for the development of geotechnical engineering and engineering geology theories and practices. In addition, Bieniawski (1989) defined the objectives of rock mass classification systems as “relate the experience of rock conditions at one site to the conditions and experience encountered at others.” These considerations clearly reveal the importance of new case studies for the development of rock engineering, geotechnical engineering, and engineering geology. Tunneling is of common interest in rock engineering, geotechnical engineering, and engineering geology.
The necessity of a rigid support system in large diameter tunnels excavated in weak grounds is important. The rigid or non-deformable support system of tunnels to be excavated in squeezing and swelling ground conditions is preferred (Aksoy and Onargan, 2010; Aksoy et al., 2010, 2012 and Aksoy et al. 2014). The Bolu tunnel was initially designed according to NATM principles and a flexible outer arch principle (Aygar 2020, 2007 and Aygar and Gokceoglu 2020). However, deformations up to 1.2 m occurred in the tunnel (Aygar 2020, Aygar and Gokceoglu 2020), and this section of the tunnel completely collapsed with the occurrence of the November 12, 1999 Düzce earthquake. In the re-design stage, it was seen that tunnel stability could not be ensured with a flexible outer arch principle, and the project was started with a rigid outer arch principle (Aygar 2020). An intermediate (Bernold) lining was applied in short fault zones and flysch series, and the bench pilot tunnel method, which is a more rigid support system, was used in long fault zones (Aygar, 2020).
Intermediate linings have been used worldwide since the 1970s. They are preferred when a rigid support system is required immediately after excavation. Thus, the loosening and plastic behavior that may occur in the tunnel are prevented, and the support systems can be completed (EWI and WIRKIR, 1972). The aim is to minimize plastic zones that may form in the tunnels with the rigid support system applied as an intermediate lining in the logic of the intermediate lining in the Doğançay T1 tunnel.
The seismic behavior of the tunnels is very important for the tunnels constructed in the high seismic zone. Some damages in tunnels during the 1995 Kobe, Japan earthquake, the 1999 Chi-Chi, Taiwan earthquake, and the 1999 Kocaeli, Türkiye earthquake (Hashash et al. 2001) were encountered. Suitable seismic design of shallow tunnels constructed in weak grounds, especially in earthquake zones, has emerged as an inevitable requirement.
Increasing population and demand for human transport have resulted in the need for new high-speed railways and highways. However, due to the geometrical constraints of high-speed railways and highways, it is not always possible to avoid problematic areas when determining routes. In Turkey, which is located in the Alpine-Himalayan earthquake belt, the construction of many high-speed railway and highway projects has started in recent years. Due to the extremely complex geological structure, it is not possible to avoid active faults, landslide areas and/or extremely weak lithological units when determining a railway or highway route in Turkey. Bilgin (2016) emphasized these difficulties as follows: “The geology of Türkiye is very complex and major Northern and Eastern Faults including minor faults associated with these faults create tremendous problems.” Therefore, in recent years, many railway and highway tunnels in Turkey have been constructed under difficult geological conditions (Dalgic, 2002 and Dalgic 2003; Aydin et al., 2004; Aksoy et al., 2010, 2012 and Aksoy et al. 2014; Bilgin and Algan, 2012; Ozcelik, 2016; Bilgin and Ates, 2016; Kaya and Bulut, 2019; Komu et al., 2020; Aygar and Gokceoglu, 2020, 2021a, b, and Aygar and Gokceoglu 2021c; Apaydin, 2021; Satici and Topal, 2021; Bilgin and Acun, 2021).
The purposes of this study are to present an excavation-support design so that tunnel construction in complex geological conditions can be completed safely and to investigate the proposed excavation-support system with 3D numerical analysis. In accordance with the purpose of the study, the geological-geotechnical properties of the tunnel route are revealed, the excavation-support system is described, and 3D numerical analyses are performed. Subsequently, the results obtained are discussed in terms of tunneling practice.
2 Location and Specification of the Tunnel
The location map of the Dogancay T1 tunnel is given in Fig. 1, and the typical section of the tunnel is given in Fig. 2. As the finished dimensions of the tunnel, the tunnel height is 8.0 m, and the width is 12.5 m. In tunnel excavation, the width is 15.5 m, and the excavation height is 13.8 m. The tunnel overburden height varies from 30 to 140 m.
As shown in Fig. 3, the T1 tunnel is located in the eastern Marmara region. The region exhibits highly active tectonism. The landforms observed in the region developed under the influence of the Neotectonic period. These landforms are observed as high mountain belts, tectonic depression basins, and valleys located along fault segments. The North Anatolian Fault Zone (NAFZ), which forms the plate boundary, plays an important role in the formation of the morphology of the region. The NAFZ, which passes through the study area in the east–west direction, has been effective in the development of the structural and palaeographic evolution of the region during the Neotectonic period (Emre et al., 1998; Fugro Sial, 2019a). Due to these characteristics of the region, active faults and landslides are common in the region (Fig. 3). In addition to these adverse conditions, the lithological units forming the tunnel route are extremely weak.
The tunnel passes through Plio-Quaternary sediments on the southern boundary of the tectonically controlled basin. These sedimentary units form a soft topography reaching approximately 300 m above sea level on the north side of the steep morphology formed by the Armutlu-Almacık tectonic block. Yildirim and Tuysuz (2017) stated that the Almacık Block is one of the most pronounced push-up structures located between the major segments of the northern strand of the NAFZ, where it bifurcates in the eastern Marmara region.
The inlet portal of the tunnel, which has a total length of 2888 m, starts from a ridge at the west and reaches Akçay Valley at the east (Fig. 4). Along the tunnel, the thickness of the overburden reaches 70, 120, and 140 m at the ridges and decreases to 30–40 m at the valley crossings (Fig. 4). The entire T1 tunnel located within the NAFZ (Fig. 3) is excavated in the Örencik Formation that consists of sand, silty sand, pebbly sand, and sandy gravel sediment units (Fig. 4).
Due to the geological and geotechnical conditions of the tunnel route, the stability of the support systems in the short term and the long term, and during an earthquake is critical. During a seismic event, the outer lining cannot carry extra loads; hence, an intermediate lining is selected to increase the bearing capacity of the lining.
In the analyses, a section with an overburden thickness of 30 m was chosen because it is the most critical section in terms of tunnel stability. In this section, the lithological units were investigated with the data obtained from the drillings performed by Fugro Sial (2019b) (Figs. 5, 6, and 7). In these drillings, at depths of 60 m and 50 m, in addition to the mud and sand levels, there are partly loose, pebble lenses up to meters in thickness. For the 60 m and 90 m overburden thickness sections, the analyses were carried out to compare different overburden effects on the tunnel stability. For 60 m of overburden thickness, the clay is selected completely as the lithological unit.
The tunnel route contains clay, sand, silty-clayey sand, gravel, and sandy gravel sediments, all of which belong to the Örencik Formation (Fig. 4). The geotechnical design parameters of the units are given in Table 1 (Fugro Sial, 2019a) according to the results of the tests performed on the samples obtained from the YTSK-1, YTSK-2, and YTSK-3 (Figs. 5, 6, and 7). The unconsolidated-undrained (UU) and consolidated-drained (CU) triaxial tests and Atterberg limits were implemented in accordance with the procedures suggested by ASTM in Istanbul Kultur University.
3 Evaluation of Tunnel Support Systems
The methods used in determining tunnel support systems are divided into 3 main groups: empirical methods (Terzaghi 1946, Bieniawski, 1973, 1976 and Bieniawski, 1989; Barton et al. 1974 and Barton et al. 1980; Grimstad and Barton, 1993), analytical methods (Kirsch, 1898; Kastner, 1971; Hoek and Brown, 1980; Hoek, 2007 and Hoek 2012), and numerical methods (Moussaei et al., 2019; Panthi and Basnet, 2019; Aygar and Gokceoglu, 2021a).
Empirical approaches for the preliminary support design have been developed since the 1950s under the experience gained from mines and underground structures. These approaches, which started with Terzaghi (1946), continued with Bieniawski (1973, 1976, and Bieniawski, 1989), Rabcewicz (1964a), Barton et al. (1974), and Palmström 2000, Palmström 2009). These approaches contain extremely important and guiding data in terms of tunneling. All of these methods have certain limitations. For example, Terzaghi (1946) made classifications only according to steel ribs, while Bieniawski (1989) made classifications according to works in tunnels with a span of 5-–12 m. Barton et al. (1974), on the other hand, developed his classification based on discontinuities, generally under high-quality rock masses. All of these classifications actually have a guiding basic principle in tunnel design. In all classifications, support systems are recommended by always giving a certain range in support systems. Therefore, these methods should be considered as the first step in tunnel design. The final support systems should be decided by analytical and numerical analyses.
Several researchers (Kirsch, 1898; Kastner, 1971; Sulem et al., 1987; Zhang et al., 2012a, 2012b, 2017; Zhang, 2018b; Wang et al., 2019; Hoek and Brown, 1980; Hoek, 2007 and Hoek 2012) have studied analytical solutions. According to this method, the environment is considered homogeneous and isotropic, and the tunnel is circular. In other words, all studies are carried out in an idealized environment. However, the unit through which the tunnel passes is not isotropic and homogeneous. Tunnels excavated conventionally are generally not circular. Although some researchers (i.e., Kargar et al., 2014; Wang et al., 2018) studied the analytical stress and displacement around non-circular tunnels, recently, analytical solutions have still some limitations.
Numerical analysis methods, on the other hand, have increased their application range in recent years and have been developed continuously. With numerical analysis, the current environment can be defined exactly, and the support systems to be applied in the tunnel can be described to the model exactly. Depending on the development of computer technology, tunnel methods, which are very complex, can also be modeled. Complex structures, such as multiple tunnels in mine galleries, junction structures in transportation tunnels, and metro stations, are modeled exactly, and the numerical analyses give much more accurate results. For this reason, numerical analysis is used as a crucial part of all tunnel projects today (Koçkar and Akgün, 2003; Akgün et al., 2014; Zou et al., 2019; Moussaei et al., 2019; Panthi and Basnet, 2019; Aygar and Gokceoglu, 2021a and Aygar and Gokceoglu 2021b). In numerical analysis methods, the most commonly applied methods involve finite elements, finite differences, discrete elements, and hybrid methods. Among these methods, finite elements are used relatively more widely (Das et al. 2017).
In this study, analytical solutions and numerical analyses were employed to assess the deformations and support system. In the first stage, analytical solutions were obtained, and then 3D numerical analyses were performed to assess the excavation and support systems. The lining system is suggested to be constructed in the following three phases:
-
a)
Outer lining (steel rib, shotcrete, wire mesh, etc.)
-
b)
Intermediate lining
-
c)
Inner lining
The FLAC3D (Fast Lagrangian Analysis of Continua in 3 Dimensions) (Itasca, 2002) program was used in the numerical analysis. FLAC3D is a program that works with the finite difference method, and it gives the opportunity to model the tunnel in 3D and to use all supports in the model.
3.1 Tunnel Support Details
Figures 8 and 9 show a typical section and details of the support system applied in the tunnel, and Fig. 10 shows the longitudinal section of the tunnel support system. In addition, the details of the tunnel support elements are shown in Table 2. The tunnel excavation sequence is as follows: top heading, bench, and invert.
Before the excavation, the injection bolts were installed and grouted. After this application, 3 layers of 88.9 mm umbrellas were installed in the roof. After the top heading excavation started at 0.75 m, in stage, an I300-type steel rib, 50 cm shotcrete, and 2 layers of wire mesh were installed.
This sequence involved 4 rounds in the top heading after the intermediate invert was installed. At the same time, bench excavation continued with the same supports as the top heading. This sequence continued at a distance of 20–25 m from the top heading and bench. After completing the 3-m bench excavation, the invert excavation was completed very close to the bench site. The ring closure was completed 30–40 m between the top heading and invert (Fig. 10). After this section, the intermediate lining was installed maximum 40 m behind the face. Therefore, this rigid support system allows minimum deformation along the tunnel.
3.2 Support System Construction
The support system construction stages are given in Fig. 11. In the first stage, umbrella and face bolts are installed; in the second stage, top heading excavation; in the third stage, bench excavation is performed; and in the fourth stage, invert excavation and supports are completed. In the fifth stage, the excavation process is completed by invert construction. After this stage, the intermediate lining is constructed, and in the next stage, drainage holes are drilled. After all these processes are completed, the tunnel support is completed by the inner lining concrete. All these stages must be performed as soon as possible.
3.3 Preliminary Tunnel Support System Evaluation
In the first stage, analytical solutions are performed for the preliminary assessment of the support system. Equations (Hoek and Brown, 1980; Hoek, 2007 and 2012) for the analytical solutions (closed-form solution) were summarized by Aygar and Gokceoglu (2021a). In this section, preliminary assessments are carried out on the behavior of the ground and tunnel support systems for cohesionless units and clay.
The analyses were carried out for three sections:
-
(a)
30 m of overburden height (cohesionless unit)
-
(b)
60 m of overburden height (clay unit)
-
(c)
90 m of overburden height (cohesionless unit)
For these units, the field stress, strength σcm, ratio of the strength to the in situ stress, plastic zone radius, unit strain (Ɛ), and deformation in unsupported tunnel calculated equations are given in Table 3 (Hoek and Brown, 1980; Hoek, 2007 and Hoek 2012), and the results are given in Table 4. In Fig. 12, the closure is given for 3 phases, and it is not at an acceptable level; hence, before the excavation, the tunnel face and ceiling should be reinforced with umbrella and face soil nails.
3.4 Rock Support Interaction Analysis—Characteristic Curves
When determining tunnel support systems, it is necessary to determine the ground reaction curve (GRC) and the support system reaction curve (SRC). In addition, it is of particular importance to know the longitudinal deformation profile (LDP) before supporting the tunnel. Such approaches are a decisive criterion, especially in determining the loads on supports. The ground characteristic curve (GRC), support system characteristic curve (SRC), and longitudinal displacement profile (LDP) curve were drawn for these sections of the tunnel. For a 30-m, 60-m, and 90-m overburden, the ground reaction curves, longitudinal displacement profile, and support reaction curves are given in Figs. 13 and 14 using the Vlachopolos and Diederichs (2009) equations.
where R* = Rp/RT
Equations are given under the condition of hydrostatic field stresses for steel ribs, shotcrete lining, and bolts in a circular tunnel. The summary table of the support system selected in both parts of the tunnel is given in Table 5.
The support pressure, support stiffness, and maximum displacement are given in Table 6 for support types using equations by Hoek and Brown (1980) and Hoek et al. (2008)
The maximum displacements in the tunnel face reach 50 cm (Table 7). In this case, it has been shown that the tunnel does not have an unsupported stand-up time. Before starting the excavation, it is evident that face nails and umbrellas for the ceiling section are necessary. In addition, as shown in Fig. 13, the supports in the tunnel need to be installed immediately; otherwise, the deformation tends to increase rapidly. In addition, the plastic zone radius is up to 16 m for a 30-m overburden, 30 cm for a 60 -m overburden, and 35 m for a 90-m overburden. Consequently, the tunnel is in a completely plastic zone.
4 3D Numerical Analyses
3D numerical analyses are performed with the FLAC3D v2.10–22 (Itasca, 2002) program. FLAC3D is a numerical analysis program that works with the finite difference method and enables the monitoring of mechanisms such as plastic flow and collapse with the Lagrange computation scheme and mixed discretization technique (Khanbabazadeh and Iyisan 2014). Since matrix elements are not used in FLAC3D software, they do not occupy substantial computer memory, so large-scale models can be analyzed. It is possible to model the ground exactly with the FLAC3D program, and it is also possible to model the structural elements (bolt, shotcrete, steel ribs, anchor) (Itasca, 2002).
4.1 Model Settings
The models created for the analyses are given in Fig. 15. First, analyses are performed for cases where there were no umbrella or face nails. In the model, a vertical plane of symmetry conditions is used, so half of the tunnel is selected for analyses.
The model was determined to be 100 m in the Y-direction, 100 m in the Z-direction, and 70 m in the X-direction (Fig. 15). The gravity method is used in the analysis, and the Mohr–Coulomb criterion is chosen as the failure criterion. In the analysis, the excavation phases are planned in the top heading, bench and invert, and the boundary conditions are given in Fig. 16. The model is fixed at 0 and 100 points in the y-direction, − 70 points in the z-direction, and 0 and 70 points in the x-direction. In the model, 142,100 zones and 149,253 node points are used. In the model, the mesh spacing around the tunnel is taken as 1.0 m for detailed investigation. Larger mesh intervals are preferred from the tunnel periphery to the surface. Thus, the solution time is shortened. In the model, a cylindrical shell and radcylindrical mesh type are used.
For the numerical analyses, the bulk modulus and shear modulus are necessary, and the parameters used in the analyses are given in Table 8. These values are related to the Poisson ratio (υ) and modulus of deformation (E). These equations for the bulk modulus and shear modulus are described by Eqs. 17 and 18.
Bulk modulus
Shear modulus
In the analyses, the excavation stage is chosen as 1.0 m in the top heading, 2 m in the bench, and 4 m in the invert. To establish the initial excavation conditions in the model, it is assumed that the excavation and supports of the 60-m section in the top heading and the 36-m section in the bench and the invert are completed. Additionally, the outer lining is completed. Modeling stages are given in Table 9.
Shotcrete is defined as a shell element in the model, and intermediate lining (Fig. 17) is defined as a block (Table 10).
For rock bolt modeling in the tunnel, the ground parameters (cohesion and modulus of deformation) are increased, and the strength parameters of the material around the tunnel are defined as composite material (Table 11). Consequently, ground and rock bolts are defined as a single unit. Around the tunnel, 88.9-mm diameter self-drilling injection pipe-driving elements are used as bolts. The main reason for this preference is because the ground is not cohesive or has low cohesion. This is because bolt drills opened with low drilling diameters on such soils are closed immediately, and the injection cannot go around the tunnel. For this reason, the bolt diameter and drill diameter are chosen to be large.
4.2 Static Analysis Results for the 3 Cases
During the first stage, analyses are performed without umbrella and soil nails, and the stability of the tunnel face is investigated. The importance of face stability in cohesionless soils is emphasized. In addition, the effect of the tunnel stability on the deformations of the face soil nails, and the umbrella and the tunnel stability effect are also investigated. The results are evaluated for 3 different overburden sections. For the 30-m overburden, a 20-cm deformation (Fig. 17a) occurred in the Y-direction, that is, in the tunnel face, towards the inside of the tunnel in cohesionless units. A 65-cm (Fig. 17b) deformation (in total) occurs in the Z-direction (the vertical direction). In the analyses for clayey units (h = 60 m), a total vertical deformation of up to 5 cm and a displacement of up to 8 cm in the tunnel face are observed (Figs. 18a and b). For the 90-m overburden height, vertical deformation of up to 8 cm and deformation of up to 16 cm in the Y-direction (tunnel face) occurs (Fig. 19a and b). The results are presented in Table 12.
Deformations in the tunnel face continue upwards in sandy units due to the cohesionless character. In clayey units, deformations are concentrated only in the center of the tunnel face due to the cohesive nature of the ground.
To ensure the stability of the tunnel face, before starting the excavation on the tunnel face and tunnel ceiling, cable bolts and umbrellas should definitely be inserted. The parameters of the cable bolts and umbrellas used in the analyses are given in Tables 13 and 14. The umbrella system is defined as a pile element in the FLAC3D program. This definition is also referenced by Oke et al. (2012, 2013a and Oke et al., 2013b, Oke et al., 2014a and Oke et al. 2014b). The cable bolts and umbrella system used in the model are given in Fig. 20.
The cable bolts and umbrellas used in the model are selected as 12 m. Cable bolts are applied to the model at 1.0 × 1.0 m intervals and a 6-m overlap. Umbrellas are also defined in the model with an overlap of 6 m, and they are applied in 3 rows due to the variable height of the cover and the non-cohesion/low cohesion of the ground.
Analyses for 30-m, 60-m, and 90-m overburdens are given in Fig. 21, and the displacements in the Y- and Z-directions can be followed here. With these supports, the deformations in the Z-direction after excavation in cohesionless units (h = 30 m) of the tunnel ceiling decrease to 10 cm, and the deformations in the Y-direction decreased to 2.75 cm. In clay units (h = 60 m), the deformations in the Y-direction in the tunnel decrease to 5 cm after the application of umbrella and cable bolts. Under the 90-m overburden, the deformations decrease to 8 cm in the Y-direction and 7 cm in the Z-direction. The results are given in Table 15.
As can be seen from the analysis results, the face support has a significant effect on the tunnel stability. Vertical deformations exceeding 60 cm without face supports decrease to 10 cm with face supports, and deformation decreases from 20 to 2.5 cm in the tunnel face.
The deformations obtained from the analytical solutions in the tunnel face are given in 7). For the 30-m overburden, the deformation is 20 cm; for the 60-m overburden, the deformation is 20 cm; and for the 90 m overburden, the deformation is 40 cm. In the numerical analysis, the deformations in the tunnel face towards the inside of the tunnel are 20 cm at 30 m at overburden height, 8 cm at a 60-m overburden height, and 16 cm at under 90 m of overburden height (Table 12). In the numerical analysis, the deformations in the cohesionless unit are lower than the analytical solutions. The main reason here is that the upper half of the excavation height is low due to the partial excavation of the tunnel. However, analytical solutions are performed for full face excavation.
5 Seismic Analysis of Tunnel Support Systems
The behavior of underground structures during earthquakes is different from that of surface structures. Because underground structures are surrounded by the ground, they are less affected by earthquakes than surface structures (Hashash et al., 2001). However, it was observed that the earthquakes such as Japan, Taiwan, and Turkey that occurred after the 1990s in the world caused severe damage to the underground structures (Hashash et al., 2001). For this reason, ground failure effects such as fault slip, liquefaction, and slope stability problems are important during the selection of tunnel routes and the locations of underground structures. However, due to the strict geometrical constraints of high-speed railways, it is not always possible to avoid adverse geological-geotechnical conditions.
Sakurai and Takahashi (1969), Owen and Scholl (1981), O’Rourke (1984), Wang (1993), O’Rourke et al. (2001), and Penzien (2000) studied the seismic design of underground structures. In these studies, the methods used in the design of the tunnel lining are explained in detail. The tunnel is located in the seismically active NAFZ, and hence, the support stability was checked under seismic conditions. According to the extremely weak units and within the North Anatolian Fault Zone, one of the most active fault zones in the world, tunnel stability is also very important. Hence, it is also possible to perform dynamic analysis with the FLAC3D program. A fully nonlinear analysis method is used in the FLAC3D program, and it can model the problem more accurately (Itasca 2002; Khanbabazadeh and Isiyan, 2014). There are 3 main parts to be considered when performing dynamic analyses via the FLAC3D program (Itasca, 2002).
-
a)
Application of dynamic loading and boundary conditions
-
b)
Ensuring that the wave is properly analysed
-
c)
Mechanical damping
The viscous boundary conditions (quiet boundary) were chosen as the boundary conditions to be used in the model. Quiet boundary conditions, proposed by Lysmer and Kuhlemeyer (1969), prevent the wave applied to the model from being reflected from the boundary. The frequency of the wave to be applied to the model, the characteristics of the wave, and the wavelength are critical for the accuracy of the analysis (Khanbabazadeh, and Iyisan, 2014; Itasca 2002). Here, the largest mesh spacing used in the numerical model should be one-tenth of the wave size or smaller (Itasca, 2002).
\(\Delta l\) mesh spacing
\(\Lambda\)wavelength
Fwave frequency
The frequency to be calculated based on the largest mesh range in the model is determined.
\(f\)frequency
Csshear wave velocity
Gshear modulus
\(\rho\)unit weight
The model is given in Fig. 22 and represents the dimensions. This model is only for the 30-m overburden, and analyses were performed for the 30-m, 60-m, and 90-m overburdens. The mesh is defined in the FLAC3D model with 280,600 zones, 287,122 grip points, and 2542 nodes. The model geometry includes x-, y-, and z-axes, in which the y-axis is along the tunnel excavation line, the x-axis is along the transverse direction and the z-axis is in the vertical direction. The x-dimensions are x = 140 m, y = 90 m, and z = 30 m (60 m and 90 m).
The largest mesh spacing used in the model is 5.5 m, and the frequency is calculated to be 1.0 Hz with the help of equations. In the model, the overburden is taken as 60 m and 90 m, and the model is determined to be 140 m in the X-direction, 100 m in the Y-direction, and 100 m in the Z-direction (Fig. 22). The tunnel width is 13 m, and the height is 8.4 m. In the model, the short-term undrained parameters are chosen by considering the soil parameters as short-term parameters at the time of the earthquake.
Seismic loading is applied to the model as a harmonic sine wave for 2.0 s. The applied horizontal acceleration value given by the Disaster and Emergency Management Presidency of Turkey was 0.342 g. The frequency of the wave to be used in the model is chosen as 1.0 Hz, and 5% is taken as Rayleigh damping. The wave base is applied to the model. Since the earthquake performance is evaluated in the long term, the shotcrete and bolts added to the model in the static state are removed, and only the inner lining is entered into the model with an intermediate lining. The intermediate lining is entered into the model as a “shell” element, and the inner lining concrete is defined as the “material.”
The results obtained from dynamic analyses are given in this section. In the results of the analysis, the moments and axial forces occurring in the lining are investigated. For a 30-m overburden thickness, the model fails because the ground is completely cohesive. It is observed that the ground undergoes major deformations and that the deformations continue with the displacements in this section. The variation in displacements in the Z-direction given in Fig. 23 is given depending on the step. As shown in Fig. 25, the displacements increase linearly.
The bending moments and axial force occurring in the intermediate lining under 60 m of overburden thickness are also given in Figs. 24 and 25, respectively. The moment is determined to be 2.78 × 106 Nm, and the axial force value is determined to be 5.78 × 106 N. In the section investigated, it is revealed that only the intermediate lining could not sufficient and should be considered a bearing element together with the inner lining. In addition, it is known that the thickness of the intermediate lining was variable during the application phase. Here, it is thought that the thickness of the intermediate lining is between a minimum of 60 cm and a maximum of 120 cm, and an average lining thickness of 90 cm is considered. When considering the section effects, it is seen that the moment bearing capacity is sufficient with the Intermediate lining (Fig. 26).
The cross-sectional effects determined in the analyses performed under an overburden thickness of 90 m, bending moments calculated to be 3.09 × 106 Nm (Fig. 27), and the axial force value is estimated to be 5.04 × 106 N (Fig. 28). In the analyses performed according to the section effects, it is determined that the intermediate lining governs the section effects (Fig. 29).
6 Application and In Situ Measurements
In the tunnel under construction within the scope of the Doğançay project, the intermediate lining is constructed from an average of 40 m behind the tunnel face. Photos from the application stage are given in Fig. 30. The tunnel construction now continues successfully.
The deformations measured at the 5 points in the tunnel section are presented in Fig. 31.
The deformation measurements performed before the intermediate lining are presented in Fig. 32. The deformations are stabilized at nearly 10 cm in the FLAC3D analysis given in Fig. 21. The deformations measured in situ are compatible with the numerical analysis; that is, the vertical deformations are less than 10 cm for the 30-m overburden. The deformation observed in the tunnel is nearly 14 cm in the cohesionless soil.
Additionally, the deformations were measured in the tunnel after intermediate lining application and are given in Fig. 33. As shown in Fig. 33, the deformations are obtained to be less than 1 cm, and stabilization along the tunnel is provided.
7 Conclusions and Recommendations
The T1 tunnel constructed within the scope of the Dogancay project is excavated completely under weak or extremely weak ground conditions. Considering the geotechnical and geological conditions of the tunnel route, the T1 tunnel can be accepted as an interesting case for the tunneling community. However, in the present study, the most critical cohesionless soil and clay sections are investigated with not only analytical solutions but also 3D numerical analyses.
The results of the analyses show that the largest problems encountered in cohesionless soils are face and ceiling stabilization. It is impossible to excavate the tunnel without providing ceiling and face stability. To perform consolidation grouting around the tunnel and to ensure arching, in cohesionless soils, the drill diameter should be as large as possible, and accordingly, the diameter of the bolt should be sizeable. With self-drilling bolts, the interaction of water with the clayey ground is minimized. The water comes into contact with the ground at the drill head only and then emerges through the casing. Thus, the tunnel environment is completely improved. In addition, it is necessary to use long and large diameter face bolts and umbrellas to ensure face stability in cohesionless soils. The possible failures in the tunnel ceiling result in severe problems, and it is appropriate to make a 3-layer umbrella in the ceiling section.
Because the tunnel route is located in the active NAFZ, the need for an intermediate lining between the outer and inner linings has arisen. An intermediate lining is installed immediately after the outer lining, approximately 40 m behind the tunnel face. This situation both prevents primary deformations and can bear the cross-sectional effects that may occur during an earthquake. The deformation trend is also checked carefully to prevent large plastic zones during construction. Otherwise, the plastic zone is enlarged to the whole overburden, and the unexpected loads affect the lining. In the low overburden section, if the deformations in the tunnel face increase unexpectedly, this is reflected up to the surface and caused by the face collapse in the tunnel. Hence, all the face supports should be installed before the tunnel excavation.
In addition, joint gaps are left between the inner lining in the fault zones encountered during tunnel excavation. Thus, possible displacements in the event of an earthquake are damped with these joints. In addition, drainage holes are drilled on the intermediate lining to prevent water loading on the tunnel lining.
Both the intermediate lining and the inner lining installations must be completed in a short time because, in the case of a possible earthquake, in the tunnels where only the outer lining is completed, the lining cannot carry the load and resulting in collapse.
As seen from the analysis results, for the 30 m overburden, a 20-cm deformation occurred in the Y-direction, that is, in the tunnel face, towards the inside of the tunnel in cohesionless units. A 65-cm deformation (in total) occurs in the Z-direction (the vertical direction). In the analyses for clayey units (h = 60 m), a total vertical deformation of up to 5 cm and a displacement of up to 8 cm in the tunnel face are observed. For the 90-m overburden height, vertical deformation of up to 8 cm and deformation of up to 16 cm in the Y-direction (tunnel face) occurs. Deformations in the tunnel face continue upwards in sandy units due to the cohesionless character. In clayey units, deformations are concentrated only in the center of the tunnel face due to the cohesive nature of the ground. The deformations are stabilized at nearly 10 cm in the FLAC3D analysis. The deformations measured in situ are compatible with the numerical analysis; that is, the vertical deformations are less than 10 cm for the 30-m overburden. The deformation observed in the tunnel is nearly 14 cm in the cohesionless soil. Analysis results for the face and umbrella support section, the deformations in the Z-direction after excavation in cohesionless units (h = 30 m) of the tunnel ceiling decreased to 10 cm, and the deformations in the Y-direction decreased to 2.75 cm. In clay units (h = 60 m), the deformations in the Y-direction in the tunnel decrease to 5 cm after the application of umbrella and cable bolts. Under the 90-m overburden, the deformations decrease to 8 cm in the Y-direction and 7 cm in the Z-direction.
As seen from the analysis results, the face support has a significant effect on tunnel stability. Vertical deformations exceeding 60 cm in cohesionless soils without face supports decrease to 10 cm with face supports for the 30-m overburden thickness. This is extremely important for tunnel stability. For the dynamic analysis, the only outer lining could not resist the earthquake loads so the intermediate lining is necessary. The bending moments and axial force occurring under 60 m of overburden thickness are 2.78 × 106 Nm and 5.78 × 106 N. The cross-sectional effects determined in the analyses performed under an overburden thickness of 90 m, the bending moment and axial force calculated as 3.09 × 106 Nm 5.04 × 106 N, respectively. In the analyses performed according to the section effects, it is determined that the intermediate lining governs the section effects.
This study is a tunnel case excavated in difficult geotechnical and geological conditions, and the methodology followed herein can be applied in similar ground conditions. The tunnel excavations to be carried out in an active earthquake zone are of serious importance. For this reason, geotechnical instruments, such as pressure cells and strain gauges, should be placed inside the inner lining and intermediate lining, and the loads on the lining should be monitored continuously.
Although the analytical solutions provide good results, it is evident that this methodology is insufficient when a tunnel is constructed in difficult ground conditions because the analytical solutions accept homogeneous and isotropic ground conditions. However, it is possible to describe the ground conditions and excavation stages in 3D numerical analyses. In other words, considering the in situ deformation measurements, the 3D numerical analyses give more realistic results while the analytical solutions produce more conservative results.
Data Availability
Whole data used in the study is presented in the text.
References
Adoko, A.C., Gokceoglu, C., Yagiz, S.: Bayesian prediction of TBM penetration rate in rock mass. Eng. Geol. 226, 245–256 (2017). https://doi.org/10.1016/j.enggeo.2017.06.014
Agbay, E., Topal, T.: Evaluation of twin tunnel-induced surface ground deformation by empirical and numerical analyses (NATM part of Eurasia tunnel, Türkiye). Comput Geotech 119, 103367 (2020). https://doi.org/10.1016/j.compgeo.2019.103367
Akgün, H., Muratlı, S.W., Koçkar, M.K.: Geotechnical investigations and preliminary support design for the Geçilmez tunnel: a case study along the Black Sea coastal highway, Giresun, northern Turkey. Tunn. Undergr. Space Technol. 40, 277–299 (2014)
Aksoy, C.O., Kantarci, O., Ozacar, V.: An example of estimating rock mass deformation around an underground opening using numerical modelling. Int. J. Rock Mech. Min. Sci. 47, 272–278 (2010)
Aksoy, C.O., Onargan, T.: The role of umbrella arch and face bolt as deformation preventing support system in preventing building damages. Tunneling and Underground Space Technology 25, 553–559 (2010)
Aksoy, C.O., Ogul, K., Topal, I., Ozer, S.C., Özacar, V., Posluk, E.: Numerical modeling of non-deformable support in swelling and squeezing rock. International Journal of Rock Mechanics and Mining Science 52, 61–70 (2012)
Aksoy, C.O., Ogul, K., Topal, I., Posluk, E., Gicir, A., Kucuk, K., Uyar Aldas, G.: Reducing deformation effect of tunnel with non-deformable support system by jointed rock mass model. Tunn Underground Space Technol 40, 218–227 (2014)
Aksoy, C.O., Uyar, G.G., Posluk, E., Ogul, K., Topal, I., Kucuk, K.: Non-deformable support system application at tunnel-34 of Ankara-Istanbul high speed railway project. Structureal Eng Mechanics 58(5), 869–886 (2016). https://doi.org/10.12989/sem.2016.58.5.869
Alp, M., Apaydin, A.: Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey. Tunn. Undergr. Space Technol 89, 157–169 (2019). https://doi.org/10.1016/j.tust.2019.04.001
Apaydin, A.: Comparison of predicted and actual states in tunnels lessons to be learned from the Gerede Water Transmission Tunnel, Türkiye. Quart J Eng Geol Hydrogeol 54(1), (2021). https://doi.org/10.1144/qjegh2020-060
Armaghani, D.J., Mohamad, E.T., Hajihassani, M., Yagiz, S., Motaghedi, H.: Application of several non-linear prediction tools for estimating uniaxial compressive strength of granitic rocks and comparison of their performances. Eng Computers 32(2), 189–206 (2016). https://doi.org/10.1007/s00366-015-0410-5
Aydin, A., Ozbek, A., Cobanoglu, I.: Tunnelling in difficult ground: a case study from Dranaz tunnel, Sinop. Türkiye. Eng Geol 74(3–4), 293–301 (2004). https://doi.org/10.1016/j.enggeo.2004.04.003
Aygar, E.: Evaluation of new Austrian tunnelling method applied to Bolu tunnel’s weak rocks. J Rock Mechanics Geotech Eng 12, 541–556 (2020). https://doi.org/10.1016/j.jrmge.2019.12.011
Aygar, E.B., Gokceoglu, C.: Problems encountered during a railway tunnel excavation in squeezing and swelling materials and possible engineering measures: a case study from Türkiye. Sustainability 12(3), 1166 (2020). https://doi.org/10.3390/su12031166
Aygar, E.B., Gokceoglu, C.: Analytical solutions and 3D numerical analyses of a shallow tunnel excavated in weak ground: a case from Turkey. Geo-Engineering 12, 9 (2021). https://doi.org/10.1186/s40703-021-00142-7
Aygar, E.B., Gokceoglu, C.: A special support design for a large-span tunnel crossing an active fault (T9 Tunnel, Ankara-Sivas High-Speed Railway Project, Turkey). Environ Earth Sci 80(1), 37 (2021). https://doi.org/10.1007/s12665-020-09328-1
Aygar, E.B., Gokceoglu, C.: An assessment on the inner lining need for a large-span tunnel (a case from Turkey, Akyazi Tunnel, Trabzon). SN Appl Sci 3(4), 457 (2021). https://doi.org/10.1007/s42452-021-04366-1
Barton, N.: Minimizing the use of concrete in tunnels and caverns: comparing NATM and NMT. Innovative Infrastructure Solutions 2(1), 52 (2017). https://doi.org/10.1007/s41062-017-0071-x
Barton, N.R., Lien, R., Lunde, J.: Engineering classification of rock masses for the design of tunnel support. Rock Mech. 6(4), 189–239 (1974)
Bieniawski, Z.T.: Engineering classification of jointed rock masses. Trans s. Afr. Inst. Civ. Engrs 15, 335–344 (1973)
Bieniawski, Z.T.: Engineering rock mass classifications. Wiley, New York (1989)
Bilgin, N.: An appraisal of TBM performances in Turkey in difficult ground conditions and some recommendations. Tunnelling and Underground Space Technology 57, 265–276 (2016). https://doi.org/10.1016/j.tust.2016.01.038
Bilgin, N., Algan, M.: The performance of a TBM in a squeezing ground at Uluabat, Türkiye. Tunn. Undergr. Space Technol. 32, 58–65 (2012). https://doi.org/10.1016/j.tust.2012.05.004
Bilgin, N., Ates, U.: Probe drilling ahead of two tbms in difficult ground conditions in Türkiye. Rock Mech. Rock Eng. 49(7), 2763–2772 (2016). https://doi.org/10.1007/s00603-016-0937-9
Bilgin, N., Acun, S.: The effect of rock weathering and transition zones on the performance of an EPB-TBM in complex geology near Istanbul, Türkiye. Bull. Eng. Geol. Env. 80(4), 3041–3052 (2021). https://doi.org/10.1007/s10064-021-02142-4
Cao, C., Shi, C., Lei, M., Yang, W., Liu, J.: Squeezing failure of tunnels: a case study. Tunn. Undergr. Space Technol. 77, 188–203 (2018). https://doi.org/10.1016/j.tust.2018.04.007
Cao, H., Peng, L., Lei, M., Tang, Q., Peng, L., Chen, F.: Calculation model of supporting system for tunnel under shallow and weak surrounding rock considering the synergistic effects. Geotech Geol Eng 38, 1379–1388 (2020). https://doi.org/10.1007/s10706-019-01097-4
Das, R., Singh, P.K., Kainthola, A., Panthee, S.: Numerical analysis of surface subsidence in asymmetric parallel highway tunnels. J Rock Mech Geotech Eng 9(2017), 170–179 (2017)
Dalgic, S.: Tunneling in squeezing rock, the Bolu tunnel, Anatolian Motorway, Türkiye. Eng. Geol. 67, 73–96 (2002)
Dalgic, S.: Tunneling in fault zones, Tuzla tunnel, Türkiye. Tunn. Undergr. Space Technol. 18(5), 453–465 (2003). https://doi.org/10.1016/S0886-7798(03)00045-2
Eftekhari, A., Aalianvari, A.: An overview of several techniques employed to overcome squeezing in mechanized tunnels a case study. Geomech Eng 18(2), 215–224 (2019). https://doi.org/10.12989/gae.2019.18.2.215
Emre, Ö., Erkal, T., Tchepalyga, A., Kazancı, N., Keçer, M., ve Ünay, E.: Neogene-Quaternary evolution of the eastern Marmara region. Northwest Türkiye: Mineral Res Ve Exploration Bull 120, 119–145 (1998)
Farrokh, E., Rostami, J.: Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project. Tunn. Undergr. Space Technol. 24(4), 436–446 (2009). https://doi.org/10.1016/j.tust.2008.12.006
Hasanpour, R., Rostami, J., Thewes, M., Schmitt, J.: Parametric study of the impacts of various geological and machine parameters on thrust force requirements for operating a single shield TBM in squeezing ground. Tunn. Undergr. Space Technol. 73, 252–260 (2018). https://doi.org/10.1016/j.tust.2017.12.027
Hashash, Y.M.A., Hook, J.J., Schmidt, B., Yao, J.I.: Seismic design and analysis of underground structures. Tunneling and Underground Space Technology 16, 247–293 (2001)
Hoek, E., Brown, E.T.: Underground excavations in rock. Instn Min. Metall, London (1980)
Kargar, A.R., Rahmannejad, R., Hajabasi, M.A.: A semi-analytical elastic solution for stress field of lined non-circular tunnels at great depth using complex variable method. Int. J. Solids Struct. 51(6), 1475–1482 (2014). https://doi.org/10.1016/j.ijsolstr.2013.12.038
Kaya, A., Bulut, F.: Geotechnical studies and primary support design for a highway tunnel: a case study in Türkiye. Bull Eng Geol Envron 78(8), 6311–6334 (2019). https://doi.org/10.1007/s10064-019-01529-8
Khanbabazadeh, H., Iyisan, R.: A numerical study on the 2D behavior of the single and layered clayey basins. Bulletin of Earthquake Eng 12, 1515–1536 (2014)
Kirsch, E.G.: The theory if elasticity and the need of the strength of materials (trans.). J Assoc German Eng. 42, 797–807 (1898)
Koçkar, M.K., Akgün, H.: Methodology for tunnel and portal support design in mixed limestone, schist and phyllite conditions: a case study in Türkiye. Int. J. Rock Mech. Min. Sci. 40, 173–196 (2003)
Komu, M.P., Guney, U., Kilickaya, T.E., Gokceoglu, C.: Using 3D numerical analysis for the assessment of tunnel-landslide relationship: Bahce-Nurdag Tunnel (South of Türkiye). Geotech. Geol. Eng. 38(2), 1237–1254 (2020). https://doi.org/10.1007/s10706-019-01084-9
Kong, S.M., Choi, S.I., Shim, S.B., Lee, H., Oh, D.W., Lee, S.W.: Stability evaluation of TBM pilot tunnels to rear blasting using the protection shield. Appl. Sci. 11(4), 1759 (2021). https://doi.org/10.3390/app11041759
Lee, Y.-Z., Schubert, W.: Determination of the round length for tunnel excavation in weak rock. Tunn Underground Space Technol 23, 221–231 (2008). https://doi.org/10.1016/j.tust.2007.04.001
Li, W., Zhang, C.P., Zhu, W.J., Zhang, D.L.: Upper-bound solutions for the face stability of a non-circular NATM tunnel in clays with a linearly increasing undrained shear strength with depth. Comput. Geotech. 114, 103136 (2019). https://doi.org/10.1016/j.compgeo.2019.103136
Luo, Y., Chen, J., Chen, Y., Diao, P., Qiao, X.: Longitudinal deformation profile of a tunnel in weak rock mass by using the back analysis method. Tunnelling and Underground Space Technology 71, 478–493 (2018). https://doi.org/10.1016/j.tust.2017.10.003
Lysmer, J., Kuhlemeyer, R.L.: Finite dynamic model for infinite media. J Eng Mech 95(EM4), 859–877 (1969)
Maleki, M.R., Dehnavi, R.N.: Influence of discontinuities on the squeezing intensity in high in-situ stresses (a tunnelling case study; actual evidences and TBM release techniques). Rock Mech. Rock Eng. 51(9), 2911–2933 (2018). https://doi.org/10.1007/s00603-018-1476-3
Moussaei, N., Sharifzadeh, M., Sahriar, K., Khosravi, M.H.: A new classification of failure mechanisms at tunnels in stratified rock masses through physical and numerical modelling. Tunn. Undergr. Space Technol 91, 103017 (2019)
Niedbalski, Z., Malkowski, P., Majcherczyk, T.: Application of the NATM method in the road tunneling works in difficult geological conditions - the Carpathian flysch. Tunn. Undergr. Space Technol. 74, 41–59 (2018). https://doi.org/10.1016/j.tust.2018.01.003
Oke, J., Vlachopoulos, N., Marinos, V.: The pre-support nomenclature and support selection methodology for temporary support systems within weak rock masses. J Geotech Geological Eng 32(1), 97–130 (2014)
Ozcelik, M.: Criteria for the selection of construction method at the Ovit Mountain Tunnel (Türkiye). KSCE J. Civ. Eng. 20(4), 1323–1328 (2016). https://doi.org/10.1007/s12205-015-0055-3
Palmström, A.: Recent developments in rock support estimates by the RMi. J Rock Mech Tunnelling Technology 6(1), 1–19 (2000)
Palmström, A.: Combining the RMR, Q, and RMi classification systems. Tunn Underground Space Technol 24(4), 491–492 (2009)
Panthi, K.K., Basnet, C.B.: Evaluation of earthquake impact on magnitude of the minimum principal stress along a shotcrete lined pressure tunnel in Nepal. J Rock Mech Geotech Eng. 11, 920–934 (2019)
Sakcali, A., Yavuz, H.: Estimation of radial deformations around circular tunnels in weak rock masses through numerical modelling. Int. J. Rock Mech. Min. Sci. 123, 104092 (2019). https://doi.org/10.1016/j.ijrmms.2019.104092
Satici, O., Topal, T.: Assessment of damage zone thickness and wall convergence for tunnels excavated in strain-softening rock masses. Tunn. Undergr. Space Technol 108, 103722 (2021). https://doi.org/10.1016/j.tust.2020.103722
Song, J.S., Yoo, C.S.: Development of knowledge-based study on optimized NATM lining design system. J Korean Geosynthetic Soc 17(4), 251–265 (2018). https://doi.org/10.12814/jkgss.2018.17.4.251
Sulem, J., Panet, M., Guenot, A.: An analytical solution for time-dependent displacements in a circular tunnel. Int J Rock Mechanics, Mining Sci Geomechanics Abstracts 24, 155–164 (1987)
Swannell, N., Palmer, M., Barla, G., Barla, M.: Geotechnical risk management approach for TBM tunnelling in squeezing ground conditions. Tunn. Undergr. Space Technol. 57, 201–210 (2016). https://doi.org/10.1016/j.tust.2016.01.013
Taromi, M., Eftekhari, A., Hamidi, J.K., Aalianvari, A.: A discrepancy between observed and predicted NATM tunnel behaviors and updating: a case study of the Sabzkuh tunnel. Bull. Eng. Geol. Env. 76(2), 713–729 (2017). https://doi.org/10.1007/s10064-016-0862-x
Vlachopoulos, N., Diederichs, M.S.: Improved longitudinal displacement profiles for convergence confinement analysis of deep tunnels. Rock Mech. & Rock Eng. 42(2), 131–146 (2009)
Wang, J.-N.: Seismic design of tunnels: a state-of-the-art approach, Monograph, monograph 7. Parsons, Brinckerhoff, Quade and Douglas Inc, New York (1993)
Wang, H.N., Zeng, G.S., Jiang, M.J.: Analytical stress and displacement around non-circular tunnels in semi-infinite ground. Appl. Math. Model. 63, 303–328 (2018). https://doi.org/10.1016/j.apm.2018.06.043
Wang, X.F., Jiang, B.S., Zhang, Q., Lu, M.M., Chen, M.: Analytical solution of circular tunnel in elastic-viscoplastic rock mass. Latin American J Solids Structures 16(6), 210 (2019)
Yagiz, S., Gokceoglu, C., Sezer, E., Iplikci, S.: Application of two non-linear prediction tools to the estimation of tunnel boring machine performance. Eng. Appl. Artif. Intell. 22(4–5), 808–814 (2009). https://doi.org/10.1016/j.engappai.2009.03.007
Yildirim, C., Tuysuz, O.: Estimation of the long-term slip, surface uplift and block rotation along the northern strand of the North Anatolian Fault Zone: inferences from geomorphology of the Almacık Block. Geomorphology 297, 55–68 (2017). https://doi.org/10.1016/j.geomorph.2017.08.038
Zhang, Q., Li, C., Min, M., Jiang, B.S., Yu, L.Y.: Elastoplastic analysis of circular openings in elasto-brittle-plastic rock mass based on logarithmic strain. Math. Probl. Eng. 2017, 1–9 (2017)
Zhang, Q., Jiang, B.S., Wu, X.S., Zhang, H.Q., Han, L.J.: Elasto-plastic coupling analysis of circular openings in elasto-brittle-plastic rock mass. Theoret. Appl. Fract. Mech. 60, 60–67 (2012)
Zhang, Q., Jiang, B.S., Wang, S.L., Ge, X.R., Zhang, H.Q.: Elasto-plastic analysis of a circular opening in strain-softening rock mass. Int. J. Rock Mech. Min. Sci. 50, 38–46 (2012)
Zhang, Z.Q., Shi, X.Q., Wang, B., Li, H.Y.: Stability of NATM tunnel faces in soft surrounding rocks. Comput. Geotech. 96, 90–102 (2018). https://doi.org/10.1016/j.compgeo.2017.10.009
Zhang, Q., Zhang, C.H., Jiang, B.S., Li, N., Wang, Y.C.: Elastoplastic coupling solution of circular openings in strain-softening rock mass considering pressure-dependent effect. Int. J. Geomech. 18, 04017132 (2018)
Zou, J., Chen, G., Qian, Z.: Tunnel face stability in cohesion-frictional soils considering the soil arching effect by improved failure models. Comput. Geotech. 106, 1–17 (2019)
Barton, N., Løset, F., Lien, R. and Lunde, J. Application of the Q-system in design decisions. In subsurface space, (ed. M. Bergman) 2, 553–561. New York: Pergamon. (1980)
Bieniawski, Z.T. Rock mass classification in rock engineering. In Exploration for rock engineering, proc. of the symp., (ed. Z.T. Bieniawski) 1, 97–106. (1976) Cape Town: Balkema.
EWI and WIRKIR,. Tunneling in Moberg Formations, Orkustofnun National Energy Authority. (1972) (https://orkustofnun.is/gogn/Skyrslur/1972/OS-1972-Tunneling-Moberg-2.pdf). Accessed 1 Apr 2019
Fugro Sial.: T1 Tunnel Geological-Geotechnical Investigation Report. Fugro Sial Geosciences Consulting and Engineering Ltd. Ankara. (2019a)
Fugro Sial.: T1 Tunnel Project Report. Fugro Sial Geosciences Consulting and Engineering Ltd. Ankara. (2019b)
Grimstad, E., Barton, N. Updating the Q-System for NMT. Proc. Int. Symp. on sprayed concrete - modern use of wet mix sprayed concrete for underground support, Fagernes. 46–66. (1993) Oslo: Norwegian Concrete Assn.
Hoek, E., Practical Rock Engineering, p 341, (2007) https://www.rocscience.com/assets/resources/learning/hoek/Practical-Rock-Engineering-Full-Text.pdf
Hoek, E., Rock Support Interaction analysis for tunnels in weak rock masses, (2012) https://www.rocscience.com/documents/pdfs/rocnews/winter2012/Rock-Support-Interaction-Analysis-for-Tunnels-Hoek.pdf
Hoek, E. and Marinos, P., 2000. Predicting tunnel squeezing. Tunnels and Tunnelling International. Part 1 – November 2000, Part 2 – December 2000.
Hoek, E., Carranza-Torres, C., Diederichs, M.S., Corkum, B., Integration of geotechnical and structural design in tunnelling. In: Proceedings University of Minnesota 56th Annual Geotechnical Engineering Conference, 29 February 2008. Minneapolis, pp. 1–53. (2008) Available for downloading at Hoek’s Corner at <www.rocscience.com>.
Itasca, Flac3d User Manual, Getting Started. (2002)
Kastner, H.. Statics of tunnel and tunnel construction based on geomechanical knowledge. Second revised edition. (1971)
MTA (General Directorate of Mineral Research and Exploration), Geoscience map viewer and drawing editor, yerbilimleri.mta.gov.tr (2021)
Oke, J., Vlachopoulos, N., Diederichs, M.S., Improved input parameters and numerical analysis techniques for temporary support of underground excavations in weak rock. In: RockEng. Edmonton. (2012)
Oke J, Vlachopoulos N, Diederichs MS., The reduction of surface settlement by employing umbrella arch systems. In: GeoMontreal 2013a. Montreal: Canadian Geotechnical Society. (2013a)
Oke J, Vlachopoulos N, Diederichs MS., Modification of the supported longitudinal displacement profile for tunnel face convergence in weak rock. In: 47th US rock mechanics/geomechanics symposium. San Francisco: American Rock Mechanics Association. (2013)
Oke J, Vlachopoulos N, Diederichs MS., Semi-analytical model of an umbrella arch employed in hydrostatic tunnelling conditions. In: 48th US rock mechanics/ geomechanics symposium. Minneapolis: American Rock Mechanics Assoc. (2014)
O’Rourke, T.D., Guidelines for Tunnel Lining Design. ASCE Technical Committee tunn lining design Underground Technol Res Council. (1984)
O’Rourke, T.D., Goh, S.H., Menkiti, C.O., Mair, R.J., Highway tunnel performance during the 1999 Duzce earthquake. Proceedings of the Fifteenth Int Conference Soil Mech Geotech Eng, August 27_31, 2000. Istanbul, Türkiye. (2001)
Owen, G.N., Scholl, R.E., Earthquake engineering of large underground structures. Report no. FHWA_RD-80_195. Federal Highway Administration National Sci Foundation. (1981)
Penzien, J., Seismically -induced racking of tunnel linings. Int. J. Earthquake Eng. Struct. Dyn. 29, 683_691. (2000)
Rabcewicz, L.v., The New Austrian Tunn Method, Part One, Water Power, pp 453–457 (1964)
Rabcewicz, L.v., The New Austrian Tunnelling Method, Part Two, Water Power, pp 511–515 (1964b)
Rabcewicz, L.v., The New Austrian Tunnelling Method, Part Three, Water Power, pp 19–24 (1965)
Sakurai, A., Takahashi, T., Dynamic stresses of underground pipeline during earthquakes. Proceedings of the Fourth World Conference on Earthquake Engineering. (1969)
Terzaghi, K. Rock defects and loads on tunnel supports. In Rock tunneling with steel supports, (eds R. V. Proctor and T. L. White) 1, 17–99 (1946). Youngstown, OH: Commercial Shearing and Stamping Company.
Yuksel Proje, Karayolu ve Demiryolu Tünelleri ve Diğer Zemin Yapıları (Sektör: Ulaşım Tesisleri – A2) (2019)
Acknowledgements
The authors thank the General Directorate of TCDD (Turkish State Railway) and Fugro Sial Co. for their support. The authors also thank the anonymous reviewers and the editor for their great efforts on the paper.
Author information
Authors and Affiliations
Contributions
Conceptualization: [E. B. Aygar, S. Karahan, C. Gokceoglu]; methodology: [E. B. Aygar, S. Karahan]; formal analysis and investigation: [E. B. Aygar, C. Gokceoglu]; writing—original draft preparation: [E. B. Aygar, S. Gullu]; writing—review and editing: [C. Gokceoglu]; resources: [S. Karahan, S. Gullu]; supervision: [S. Gullu, C. Gokceoglu].
Corresponding author
Ethics declarations
Conflict of Interest
The authors declare no competing interests.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Aygar, E.B., Karahan, S., Gullu, S. et al. Analytical and Numerical Analyses of the Support System for a Large-span Tunnel in Challenging and Seismically Active Ground Conditions. Transp. Infrastruct. Geotech. 10, 988–1031 (2023). https://doi.org/10.1007/s40515-022-00251-5
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s40515-022-00251-5