Abstract
The Ovit Mountain Tunnel (OMT) is an highway tunnel under construction at Mount Ovit between Ikizdere (Rize) and Ispir (Erzurum) in NE Turkey. It will be the country’s longest tunnel about 14700 m long in twin tubes. This paper compares and assesses tunnel excavation by Tunnel Boring Machine (TBM) excavation or drill and blast method for the OMT. Rock mass and material characteristics were evaluated to identify the excavation method. The rock mass classification of the tunnel grounds was performed by utilizing the Rock Mass Rating (RMR), Q system and New Austrian Tunnelling Method (NATM) which was followed by a geotechnical investigation along the tunnel. Twelve boreholes with a total length of 1116.5 m were drilled to assist and verify rock mass classifications. Seventy five rock samples were obtained for mechanical test. TBM method was selected at preliminary design stage of the OMT. But now, the OMT is driven by drill and blast method, using hydraulic excavators and the support is based on the principles of the NATM. The selection of this tunnelling excavation method was decided by morphological site conditions, geological, geotechnical site conditions, time and economic criteria.
Article PDF
Similar content being viewed by others
Explore related subjects
Discover the latest articles, news and stories from top researchers in related subjects.Avoid common mistakes on your manuscript.
References
Akgun, H., Muratli, S., and Kockar, M. K. (2014). “Geotechnical investigations and preliminary support design for the Geçilmez tunnel: A case study along the Black Sea coastal highway, Giresun, northern Turkey.” Tunnelling and Underground Space Technology, 40, pp. 277–299, DOI: 10.1016/j.tust.2013.10.018.
Akin, H. (1979). “Geologie, magmatismus und Lagerstattenbildung im ostpontischen Gebirge/Türkei aus der Sicht der Plattentektonik.” Geologie Rundschau, Vol. 68, No. 1, pp. 253–283.
ASTM Standard C88 (1999). Test method for soundness of aggregates by use of sodium sulphate or magnesium sulphate, ASTM International West Conshohocken, PA. DOI: 10.1520/C0088-99A. http://www.astm.org.
ASTM Standard D5079 (2008). Practices for preserving and transporting rock core samples, ASTM International West Conshohocken, PA. DOI: 10.1520/D5079-08. http://www.astm.org.
ASTM Standard C127 (2001). Test method for specific gravity and absorption of coarse aggregate, ASTM International West Conshohocken, PA. DOI: 10.1520/C0127-01. http://www.astm.org
ASTM Standard C131 (2003). Test method for resistance to degradation of small-size coarse aggregate by abrasion and impact in the Los Angeles machine, ASTM International West Conshohocken, PA. DOI: 10.1520/C0131-03. http://www.astm.org
ASTM Standard D2113 (2008). Practice for rock core drilling and sampling of rock for site investigation, ASTM International West Conshohocken, PA. DOI: 10.1520/D2213-08. http://www.astm.org.
ASTM Standard D2216 (2005). Test methods for laboratory determination of water (moisture) content of soil and rock by mass, ASTM International West Conshohocken, PA, 2005, DOI: 10.1520/D2216-05, http://www.astm.org.
Austrian Standards Institute (2001). ÖNORM B 2203-1: Underground Works, Part 1: Cyclic Driving. Works contract, Issue 2001-12-01.
Barton, N., Lien, R., and Lunde, J. (1974). “Engineering classification of rock masses for the design of tunnel support.” Rock Mechanics, Vol. 6, No. 4, pp. 189–236, DOI: 10.1007/BF01239496.
Basarir, H. (2006). “Engineering geological studies and tunnel support design at Sulakyurt Dam site, Turkey.” Engineering Geology, Vol. 86, No. 4, pp. 225–237, DOI: 10.1016/j.enggeo.2006.05.003.
Bieniawski, Z. T. (1989). Engineering rock mass classifications: A complete manual for engineers and Geologists in Mining, Civil and Petroleum Engineering, Wiley, New York, 251 p. ISBN-13: 978-0471601722.
Boztug, D., Ercin, A. I., Kurucelik, M. K., Goc, D., Komur, I., and Iskenderoglu, A. (2006). “Geochemical characteristics of the composite Kackar batholith generated in a Neo-Tethyan convergence system, Eastern Pontides, Turkey.” Journal of Asian Earth Sciences, Vol. 27, No. 3, pp. 286–302. DOI: 10.1016/j.jseaes.2005.03.008.
Ehrbar, H., Sala, A., and Wick, R. (2011). “Selection of tunnelling methods at the Gotthard Base Tunnel.” Geomechanics and Tunnelling, Vol. 4, No. 5, pp. 517–526, DOI: 10.1002/geot.201100031.
Eryigit, H. A., Atasoy, M., Aksu, E., Ulgen, O., and Balaban, E. (2014). Ikizdere–Ispir yolu Ovit tüneli ve bağlantl yollarl yaplml isi, Turkish Tunneling and Underground Technologies Magazine (Tünel Dergisi), Say 1, No. 3, www.tuneldergisi.com, pp. 24–27.
Genis, M., Basarir, H., Ozarslan, A., Bilir, E., and Balaban, E. (2007). “Engineering geological appraisal of the rock masses and preliminary support design, Dorukhan Tunnel, Zonguldak, Turkey.” Engineering Geology, 92, pp. 14–26, DOI: 10.1016/j.enggeo.2007.02.005.
Golestanifar, M., Goshtasbi, K., Jafarian, M., and Adnani, S. (2011). “A multi-dimensional approach to the assessment of tunnel excavation methods.” International Journal of Rock Mechanics & Mining Sciences, Vol. 48, No. 7, pp. 1077–085. DOI: 10.1016/j.ijrmms.2011.07.001
Guner, P., Eryigit, H. A., Sayin, A., and Kocak, B. (2014). “an overview of the construction of turkey’s longest road tunnel focusing on ground support using macro synthetic fibres as shotcrete reinforcement/” Proceedings of the World Tunnel Congress 2014. Negro, Cecílio and Bilfinger (editors), Iguassu Falls–Brazil. São Paulo: CBT/ABMS, 225 p.
Hagen, A. (2012). Engineering geological assessments of a tunnel for the proposed high speed railway link between oslo and bergen, Norwegian University of Science and Technology, Department of Geology and Mineral Resources Engineering. MSc Thesis.
Hoek, E. and Brown, E. T. (1997). “Practical estimates of rock mass strength.” International Journal of Rock Mechanics and Mining Sciences, Vol. 34, No. 8, pp. 1165–1186, DOI: 10.1016/S1365-1609(97)80069-X.
Hoek, E., Carranza-Torres, C., and Corkum, B. (2002). “Hoek–Brown failure criterion-2002 edition. In: Hammah, R., Bawden, W., Curran, J., Telesnicki, M. (Eds.).” Proceedings of NARMS-TAC 2002, Mining Innovation and Technology. University of Toronto, pp. 267–273. Toronto-10 July 2002.
ISRM (International Society for Rock mechanics) (1981). ISRM suggested methods rock characterization testing and monitoring, Brown ET (ed), Oxford Pergamon Press.
Karlbauer, A. (2012). “Tunnelling on the railway line VDE 8.1 Ebensfeld- Erfurt through the example of the Eierberge Tunnel.” Geomechanics and Tunnelling, Vol. 5, No. 6, pp. 670–677, DOI: 10.1002/geot.201200055.
Maidl, B., Schmid, L., Ritz, W., and Herrenknecht, M. (2008). Hardrock tunnel boring machines, Berlin: Ernst & Sohn.
MAKYOL, Makyol Engineering Company (2013). Ovit tunnel monthly activity report. (in Turkish, unpublished)
Okay, A. I. and Sahinturk, O. (1997). “Geology of the Eastern Pontides. In: Robinson, A.G. (Ed.).” Regional and Petroleum Geology of the Black Sea and Surrounding Region: AAPG Memoir, 68, pp. 292–311.
Rabcewicz, L. (1964). “The New Austrian Tunneling Method (NATM).” Water Power, pp. 453–457.
Robinson, A. G., Banks, C. J., Rutherford, M.M., and Hirst, J. P. P. (1995). “Stratigraphic and structural development of the Eastern Pontides, Turkey.” Journal of Geological Society, London, Vol. 152, No. 5, pp. 861–872, DOI: 10.1144/gsjgs.152.5.0861.
Sari, D. and Pasamehmetoglu, A. G. (2004). “Proposed support design, Kaletepe Tunnel, Turkey.” Engineering Geology, Vol. 72, No. 3, pp. 201–216, DOI: 10.1016/j.enggeo.2003.08.003.
Sengor, A. M. C. and Yilmaz, Y. (1981). “Tethyan evolution of Turkey: a plate tectonic approach.” Tectonophysics, 75, pp. 181–241, DOI: 10.1016/0040-1951(81)90275-4.
Sopaci, E. and Akgun, H. (2008). “Engineering geological investigations and the preliminary support design for the proposed Ordu peripheral highway tunnel, Ordu, Turkey.” Engineering Geology, Vol. 96, No. 1–2, pp. 43–61, DOI: 10.1016/j.enggeo.2007.09.005.
TTS Engineering Company (2013a). Geological and geotechnical report of the OMT. (in Turkish, unpublished)
TTS Engineering Company (2013b). Tunnel calculation report of the OMT. (in Turkish, unpublished)
Tuysuz, O. and Genc, C. (2012). Geological investigations of the OMT route report, Istanbul Technical Universtiy. (in Turkish, unpublished)
Yilmaz, C., Sen, C., and Ozgur, S. (2003). “Sedimentological, palaeontological and volcanic records of the earliest volcanic activity in the Eastern Pontide Cretaceous volcanic arc (NE Turkey).” Geological Carpathian, Vol. 54, No. 6, pp. 377–384.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Ozcelik, M. Criteria for the selection of construction method at the Ovit Mountain Tunnel (Turkey). KSCE J Civ Eng 20, 1323–1328 (2016). https://doi.org/10.1007/s12205-015-0055-3
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-015-0055-3