Abstract
In interrupted concrete structures is fundamentally relevant to adopt protective measures, which purpose is minimizing degradation to ensure project life cycle, in addition to subserve a future construction resumption. In this context, this paper presents a case study of prestressed and reinforced concrete structures, located in Foz do Iguaçu, Paraná, Brazil, whose execution was interrupted in 2014. At that time, the constructions were in superstructure execution phase. With an area of 155,000 m2 and investment of $ 31 million, the constructions belong to Brazilian Federal Government and are destined to Federal University of Latin-American Integration (Unila) installations. It was observed that performed protection works were mainly related to exposed reinforcement protection, waterproof and protection of structures in contact with soil, and drainage services execution. The protection costs were approximately 1.4% of investment value, following the Sitter’s “Law of fives". Thus, the technical and economic importance of protective measures adoption in concrete structures that had their works interrupted is noted, so that the case study serves as a model for other buildings in same situation.
Similar content being viewed by others
Avoid common mistakes on your manuscript.
1 Introduction
The development of new construction processes, building materials and technologies has encouraged the construction of more economical buildings. However, the high competitiveness in the construction sector and the need to reduce production costs have negatively influenced the quality of buildings constructed in Brazil in recent years. It is common to find buildings with high level of degradation than expected, quality and durability problems due to execution failures and pathological manifestations that affect aesthetics, usability, safety and service life [1].
Durability is “essentially a retrospective view on the performance of a structure” [2]. It is an ability of a concrete structure, not only a constitution material property, being “given” from project design to maintenance of a concrete structure, involving the correct materials selection [3]. Durability problems can be present in finished and interrupted concrete structures. An interrupted or unfinished structure is defined as a construction that has been temporarily or indefinitely paralyzed due to financial, judicial or environmental problems. According to a survey conducted by the National Institute for Business Recovery (INRE), in 2016, there were 5.200 interrupted constructions in Brazil, which 50% of them were public, 30% were public–private and only 20% being completely private [4].
During the 2000s and extending to middle of 2014, Brazil experienced a wave of economic development, evidenced by positive variations in Brazilian Gross National Product (GNR) (except in 2009, because of US economic crisis) [5]. In the same period, between 2003 and 2014, 18 new federal universities were created, and the release of programs such as “Growth Acceleration Program” were launched, which includes social, urban, logistics and energy infrastructure, promoting the growth of public constructions in the period [6, 7].
All growth process that Brazil was going through was reversed in 2014 due to a heavy economic crisis, causing a 0.5% growth in Gross National Product (GNR) that year, and a 3.77% and 3.60% reduction in 2015 and 2016, respectively [8]. Moreover, in 2014, the “Lava Jato” operation was released by Federal Police [9], which was responsible for money laundering dismantling, discovering of active and passive corruption schemes and identification of overpriced contracts in publics buildings. Due to ongoing investigation and overbilling discoveries, many public constructions were paralyzed, whereas a parcel of responsible construction companies were involved in the investigation [10, 11]. In addition to these issues, constructions such as Federal University of Latin American Integration (UNILA) were paralyzed due to contract breach of winning bidding consortium, which alleged problems in projects that prevented execution in the stipulated price.
In general, these interrupted or paralyzed constructions are subjected of favorable environmental conditions for building materials deterioration over time, being necessary to make protective and preventive maintenance actions to facilitate their resumption, ensuring the design service life (DSL), whose theme is the object of this study.
2 Degradation × maintenance
The appearance of pathological manifestations is inherent in the constructive process. Buildings are not identical to others due to the occurrence of variations in construction processes and their circumstances, such as weather variations that could affect concrete curing or some material substitution for an apparently identical one [12]. Such factors directly affect the durability and service life of concrete structures and/or their parts [13, 14].
Durability of concrete structures is a theme that has been gaining importance over the last decades due to concern related to structures premature degradation, mainly caused by the corrosion in reinforced concrete structures [15]. Köliö et al. [16] point out that during the DSL, a structure must confront external actions, such as weather, which should be durable enough to avoid repairs costs outside maintenance plan. In a study carried out in 52 Spanish provinces, the Spanish group of hormigón (GEHO) found that among the different pathological manifestations observed, reinforcement corrosion had the third highest occurrence rate. In total, 844 cases were raised, and corrosion was present in 15% of manifestations [17]. In addition, structures present in marine environment have higher potential of reinforced corrosion than other environments, due to high chloride diffusion incidence, verified in Bayuaji et al. [18], Possan et al. [19] and Shekarchi [20] studies.
One of the problems related to corrosion is cementitious materials carbonation. This phenomenon is responsible for causing reinforcement despassivation and, consequently, degradation and reduction of reinforced concrete structures service life [21,22,23]. In this sense, the concrete immersed reinforcement needs preservation against carbonation, which decreases structure’s pH due to reaction of carbon dioxide (\({\mathrm{C}\mathrm{O}}_{2}\)) with hydroxides contained in cementitious concrete matrix, providing the reinforcement corrosion [24, 25]. Besides, chlorides and sulfates exposure, atmospheric pollution, freezing and thawing, and alkali-aggregate reaction also cause concrete and/or reinforcement deterioration [26].
Corrosion caused by carbonation can be minimized by inhibiting products whose use principles are a thin film formation on the steel surface or the corrosive agent’s immobilization to prevent reinforcement degradation [23]. An application of anti-carbonation coatings (elastomeric and thick), water repellent and chemical resistant coatings are some other possible solutions to act as a barrier against the aggressive agent [27, 28] and can be used as protective measures.
In reinforced concrete structures, steel protection begins in the design with materials selection (stainless steel, for example), continuing in execution (guarantee of the cover thickness, water/cement ratio control, concrete curing, etc.) and continues during the service life with maintenance, repair or recovery actions [26]. More attention should be paid to the proper management of infrastructures that essentially depend on public funding, and to the development of engineering solutions that provide confidence in the future infrastructure provision [29]. Main pathological problems present in concrete structures come from failures in conception, design, and execution stages.
Therefore, to prevent or minimize pathological manifestations appearance, structure protection must be present at all stages of construction (from design to maintenance), in order to reduce costs and guarantee the service life. Sitter [30] reports that intervention costs to fix pathological problems increase progressively during the time, so that structure repairability costs increase in geometric progression with ratio 5, as a function of decision-making time Fig. 1. For this reason, his law is known as "Law of Fives".
According to Sitter [30], when the construction of a structure is interrupted, some technical care (structure protection activities, waterproofing and drainage, among others) must be taken in order to reduce costs and minimize (or eliminate) failures when the construction restarts.
In this sense, this paper presents a case study aimed to protect a set of reinforced and prestressed concrete structures that were discontinued in 2014, in order to demonstrate the importance of the measures adopted in view of the benefits obtained, especially in reducing or minimizing pathological manifestations. This paper also aims to ensure safety of the structure conditions in a future work resumption process.
3 Case study
3.1 Description of the structure
This case study approaches preventive maintenance actions carried out at Federal University of Latin American Integration (UNILA) interrupted construction, located in Itaipu Hydroelectric Dam security area perimeter, in Foz do Iguaçu, Paraná, Brazil Fig. 2.
At the end of its implementation, the university project Figs. 3, 4 will total 155,000 m2 of gross construction area Table 1, as well as a parking area for vehicles and walkways that interconnect all buildings, which will have capacity to serve approximately 10,000 students.
The university campus first stage construction provided partial or total construction of central building (Figs. 5, 6), classrooms building (Figs. 7, 8), restaurant (Figs. 9, 10), utility center (CUT), utility gallery and part of general deployment (such as parking lots and access). The other global project buildings listed in Table 1 would be completed in a second stage.
3.2 General features from the project
The interrupted main structures Table 1 were made in a mixed construction system (reinforced and prestressed concrete) with ribbed slabs. The characteristic concrete strength (\({f}_{ck}\)) is 50 MPa for central building columns and 35 MPa for other structural elements. At the construction end, the concrete will not be coated (apparent concrete structure).
3.3 Construction history
The Unila’s architectural project was developed by Architect Oscar Niemeyer between 2009 and 2010 and it was donated to UNILA, in implementation at that time, by Itaipu Hydroelectric Dam. The university campus construction was divided into stages Table 1. In July 2011, the first stage works were initiated by Brazilian Federal Government with a total of 380,700 m2 construction area. However, in 2014 the buildings were paralyzed by the consortium responsible.
Since then, the University's technical staff has been conducting studies and negotiations with the competent agencies to resume the works, whereas the University has not had its own installations until nowadays. Electoral uncertainties in 2014, Ministerial transition in 2015 and the country economic crisis in recent years have corroborated for services in conclusion.
In this context, the concern of the University technical engineering staff with the maintenance of the structures already executed ascended, aiming at guaranteeing their durability until the future construction resumption. As a result, in December 2016, a 10 months maintenance contract was signed for four hundred and thirty-four thousand dollars ($ 434,000.00). The objective was ensuring protection against deterioration of buildings already built and the consequent damage to State Treasury. The results of this work are presented in this study.
3.4 Data survey
The data used in the study were obtained from Federal University of Latin American Integration (UNILA) in official documents used for structure protection services, especially electronic trading No. 3/2016—contract agreement 71/2016 [31].
4 Structures protection
4.1 Maintenance actions
The main protection services performed in respective structures are described in detail in Table 2. In addition to the services, other activities were also made, such as: (i) landfill of galleries and the “Technical Utilities Center”, (ii) central building provisory slab construction; (iii) finalization of underground structures (galleries and technical utilities center).
Through the technical study developed [31], it was defined the essential services to minimize deleterious actions of construction structure, namely:
-
(a)
achievement of mud cleaning and removal services;
-
(b)
waterproofing execution and recovery of systems already made;
-
(c)
drainage services execution: construction of deep drainage wells in central building region, and others listed in Table 2,
-
(d)
exposed reinforcement protection (start bars);
-
(c)
preservation of temporary construction site installations and safety areas isolation.
4.1.1 Mud cleaning and removal services
Firstly, the accumulated mud was removed from underground technical galleries Fig. 11a). To remove the mud, mechanical equipment (mini loaders, backhoe loaders, excavators) and manual equipment (shovels, wheelbarrow, etc.) were used. Fig. 11b). Cleaning services were conducted by applying water jet Fig. 11c).
4.1.2 Waterproofing
When construction execution services was interrupted, part of structures waterproofing systems was not adequately protected, and it suffered degradation due to weather exposure Fig. 12. As water is one of main degradation agents of concrete structures, waterproofing systems are important in ensuring their durability [32]. With this concern, waterproofing services were conducted, such as recovery of completed systems with damage Fig. 13b and new systems implementation Fig. 13a, b.
During recovery actions, visual inspection was made on existing structures, identifying locations where mechanical protection had failures (cracks and displacement) and/or it was not performed. Where failures were found, the existing waterproofing system (membranes and protection) was removed, and it was replaced by a new system (double polymeric cover for gallery ceiling and utility center, and painting on gallery walls). The polymeric cover was mechanically protected before structures grounding, as recommended by NBR 9574 [33], which is equivalent to ASTM D7832M-14:2014.
4.1.3 Exposed reinforcement protection
The exposed reinforcement cleaning—start bars—Fig. 14a was performed with water blasting (on all existing structures). Subsequently, cement paste was manually applied Fig. 14b, c with the proportion 1:1 (cement:water). Among the main protection systems for exposed reinforcement (such as polymeric cement mortars), cement paste without additives was chosen due to its easy application, low cost of acquisition and considering materials in stock (cement and water), avoiding bidding necessity.
The study developed by Gomes and Sales [35] confirms reinforcements protection importance in interrupted structures. The authors found that 49% of the samples collected, carbonation depth was similar to concrete cover layer thickness (for approximately 9 years of \({CO}_{2}\) exposure), indicating maintenances consideration to a possible construction sequence. In another case study, Huang et al. [36] concluded that a surface coating application would have prevented carbonation in a 35-year-old building by up to 100%, according to the coating thickness.
In the study case, where the design predicts apparent concrete, the ingress of \({\mathrm{C}\mathrm{O}}_{2}\) will not be prevented (since the concrete was not protected), and will be mainly controlled by the concrete quality (minimum \({f}_{ck}\) of 35 MPa and maximum water/binder ratio of 0.55) and the cover layer thickness (minimum 30 mm for columns and beams and 25 mm for slabs).
In the document analysis, it was found that design decisions were made in favor of durability during the structure service life. The concrete quality was characterized by technological tests, analyzing the axial compressive strength and the elasticity modulus. Moreover, special care was taken in the execution of the building’s foundations (concrete mass). For footing type foundations, refrigerated concrete was used to reduce hydration heat, which can also prevent delayed ettringite formation (DEF). As the aggregates in the construction region are reactive, cement mineral additions was added to minimize the effects of hydration heat and mitigate the alkali-aggregate reaction (Fig. 15).
Although Brazilian regulations specify only the minimum compressive strength and the maximum water/cement ratio as design requirements for a concrete structure, it is known that other factors are of importance for durability and structural safety.
Cement type and content, CO2 content, relative humidity and rain protection also influence the diffusion of CO2 into the concrete. For this reason, the model proposed by Possan et al. [37], was chosen to perform the service life simulations (Eq. 1).
where y is the average carbonation depth of concrete, in mm. fc is the average characteristic axial compressive strength of concrete, in MPa. kc is the variable factor relative to type of cement used Table 3a). kfc is the variable factor related to concrete compressive strength, giving to type of cement used Table 3a). t is the concrete age, in years. ad is the pozzolanic admixture content in concrete, in % of concrete mass. kad is the variable factor relative to pozzolanic admixtures in concrete—silica fume, metakaolin and rice husk ash, according to type of cement used Table 3a). UR is the average relative humidity, in %/100. kur is the variable factor related to relative humidity, according to type of cement used Table 3.a). CO2 is the atmospheric CO2 content, in %. kco2 is the variable factor related to CO2 content in the environment, according to type of cement used Table 3a). kce is the variable factor related to rain exposure, according to exposure conditions of structure Table 3b).
The model was chosen due to good carbonation depth estimation results for concrete structures produced with different cements, explaining more than 85% of the tested cases [37]. Figure 9 presents the simulation result for the structure under study considering concrete degradation by carbonation action over time, in order to evaluate the structure DSL. For the simulation, the conditions of the structure's exposure environment were included the model (Eq. 1), considering the average relative humidity 73% and a CO2 content of 0.038% (380 ppm), for the outdoor, sheltered from rain condition. Pozzolanic Portland cement with 7% and 8% of silica fume was used to produce concrete with compressive strength of 35 MPa applied in slabs and columns and 50 MPa used in columns, respectively.
According to NBR 6118 [34]—which is equivalent to ACI 318R-19:2019—the structure under analysis is in a zone of moderate aggressiveness (Class II, urban environment), with small deterioration risk. Using Eq. 1 for simulate the carbonation advance over time Fig. 9, a period of 235 years can be estimated or CO2 to reach the reinforcement in columns and slabs (compressive strength 50 MPa and concrete cover 30 mm). Thus, it is noted that the structure will possibly meet NBR 6118 [38] as well as the Performance Standard regarding the minimum service life of 50 years, NBR 15575 [39]—equivalent to EN 1992-1-1:2014.
For the slabs, with 35 MPa compressive strength and 25 mm cover thickness the simulation indicated a 48-year service life, so that the carbonation front is equal or greater than the concrete cover thickness used. This value is slightly below the minimum SLD stipulated in the Brazilian performance standard [39], which is not desirable from a durability standpoint. Possan [40] reports that Portland cement without pozzolanic addition could increase the service life of these structures, since they have more alkaline reserve, which slows the advancement of carbonation front.
4.1.4 Drainage services
After cleaning central building underground, two sewage pumps with automatic drive were installed to prevent flooding in this space. These machines are in permanent operation. The drainage system was also finalized Fig. 16a and a retaining wall execution, both located near to the utility center, in order to finish the campus earthworks services.
4.1.5 Preservation of temporary construction site installations and Isolation of safety areas
In direction of maintain NR 18 minimum conditions [38], so that construction provisional installations could be reused Fig. 16b), wooden walls transformed and/or damaged were replaced by new elements. The roof was also repaired with damaged roofing tiles replacement. Finally, areas were isolated to provide safety, with doors and barriers installed to prevent access to buildings or part of them and to prevent possible accidents and thefts.
4.2 Cost survey
Table 4 presents the data about the investments made and the areas constructed, until the moment that activities were paralyzed, for the three main structures of first stage project's implementation (central building, classrooms building and restaurant).
It is noted that the classrooms building is the structure with the lowest percentage of work performed. This occurred due to a delay in the execution agenda, since that a geological fault was detected only after the works start, which required the projected foundation system alteration. The initial design was sloped footing foundations that were changed to deep foundations in the region where the fault was detected.
The Table 3 shows that costs required for reinforcement protection are insignificant when compared to overall structures cost, being less than 0.03% of the monetary value already invested in the structure. Regarding the contract value for the structure’s protection execution, it is observed that it represents 1.4% of the total invested and this value is considered low in view of its application (interrupted structures protection and incomplete constructions completion).
Time estimated of repairs, quality of provisional services performed, as well as the materials used, are, therefore, helpful to these types of constructions. It is also important to consider what is stated by Gardner et al. [41], in order to have an even greater cost–benefit in maintenance processes, the use of materials that have an ability to adapt, self-heal and respond to their exposure environment is required. This means that the number of repair and maintenance interventions during the service life of the structure (or interrupted structure) are as short as possible and therefore maintenance costs are reduced over the construction life.
5 Conclusions
In the present study, in an interrupted engineering construction, protection and maintenance actions can be adopted with reduced costs, in order to avoid the concrete structures degradation until the moment of works returning.
In the document analysis, it was found that design decisions were made in favor of durability during the structure service life. For footing type foundations, refrigerated concrete was used to reduce hydration heat, which can also prevent delayed ettringite formation (DEF). Cement mineral additions was also used to mitigate the alkali-aggregate reaction, as the aggregates in the construction region are potentially reactive. For the superstructure concrete, the project also adopted durability-friendly measures, such as the use of concrete with compressive strength greater than 50 MPa.
According to the durability model used [37], which considers the environmental exposure (moderate), concrete characteristics, especially water/binder ratio and cement type employed, associated with covering thickness used, ensure a structure service life more than 200 years.
It was observed that the protection services made on specified interrupted structures, were mainly related to exposed reinforcement protection, waterproofing and protection of structures in contact with the ground, and, finally, drainage services execution.
Protection costs were approximately 1.4% of investment value. The reinforcement protection cost was less than 0.03%, indicating the technical and economic importance of adopting protective actions in concrete structures that had their works interrupted.
Therefore, the study demonstrated the importance of measures adopted in view of the benefits obtained in relation to demanded costs, especially to reduce or minimize pathological manifestations. Hence, it would be useful as a model for other constructions in same situation, corroborating for diffusion of practical engineering works, guaranteeing the durability and extension of reinforced and prestressed concrete structures service life.
References
Andrade JJO, Possan E, Dal Molin DCC (2017) Considerations about the service life prediction of reinforced concrete structures inserted in chloride environments. J Build Pathol Rehabil. https://doi.org/10.1007/s41024-017-0025-x
International Federation for Structural Concrete (Fib) (2010) Structural Concrete: textbook on behavior, design and performance. Second edition, 3, CEB/FIP
Demis S, Papadakis VG (2019) Durability design process of reinforced concrete structures—service life estimation, problems and perspectives. J Build Eng 26:100876. https://doi.org/10.1016/J.Jobe.2019.100876
Moraes G (2016) The House's external commission monitors interrupted build throughout Brazil. House of Representatives Portal. Brasilia. https://www2.camara.leg.br/camaranoticias/radio/materias/radioagencia/516853-comissao-externa-da-camara-acompanha-obras-paradas-em-todo-o-brasil.html Accessed 29 Jul 2017 (in Portuguese)
Brasil (2016a) Portal of the Chamber of Deputies. External Commission of Chamber accompanies stationary buildings throughout Brazil. https://www2.camara.leg.br/camaranoticias/radio/materias/RADIOAGENCIA/516853-COMISSAO-EXTERNA-DA-CAMARA-ACOMPANHA-OBRAS-PARADAS-EM-TODO-O-BRASIL.html. Accessed 29 Jul 2017
Brasil (2012) Ministry of Education, Analysis of the Expansion of Federal Universities—2003 a 2012: Report of the Commission Constituted by Ordinance nº 126/2012. https://www.utfpr.edu.br/santahelena/cursos/licenciaturas/Ofertados-neste-Campus/licenciatura-em-ciencias-biologicas-1/sugestoes-de-leitura-para-biologos/analise-sobre-a-expansao-das-universidades-federais-2003-a-2012/at_download/file. Accessed 15 June 2017 (in Portuguese)
Brasil (2017) Planning Ministry, About the PAC. https://www.pac.gov.br/sobre-o-pac. Accessed 15 Jun 2017 (in Portuguese)
Brasil (2016) IBGE, indicators IBGE: quarterly national accounts—volume indicators and current values. ftp://ftp.ibge.gov.br/Contas_Nacionais/Contas_Nacionais_Trimestrais/Fasciculo_Indicadores_IBGE/pib-vol-val_201604caderno.pdf. Accessed 29 Jul 2017 (in Portuguese)
Brazil (2019) Communication Company, Lava Jato completes three years of investigations with 260 criminally accused. https://agenciabrasil.ebc.com.br/politica/noticia/2017-03/lava-jato-completa-tres-anos-de-investigacoes-com-260-acusados. Accessed 29 Jul 2019 (in Portuguese)
Brasil (2017a) Public Ministry Federal, Understand the Case. https://lavajato.mpf.mp.br/entenda-o-caso. Accessed 29 Jul 2017 (in Portuguese)
State of Sao Paulo, In three years, Lava Jato had more than 180 requests for international cooperation. https://politica.estadao.com.br/blogs/fausto-macedo/em-tres-anos-lava-jato-teve-mais-de-180-pedidos-de-cooperacao-internacional/. Accessed 29 Jul 2017 (in Portuguese)
Freitas VP, Angelis E (2013) A state-of-the-art report on building Pathology. https://site.cibworld.nl/dl/publications/pub_393.pdf
Hilal AA (2016) Microstructure of concrete. In: Yilmaz S, Ozmen HB (eds) High performance concrete technology and applications. Intech, Rijeka, Croatia. https://doi.org/10.5772/64574
Neville AM, Brooks JJ (2010) Concrete technology, 2nd edn. Pearson, Edinburgh
Possan E, De Oliveira Andrade JJ (2014) Markov chains and reliability analysis for reinforced concrete structure service life. Mater Res. https://doi.org/10.1590/S1516-14392014005000074
Köliö A, Pakkala TA, Lahdensivu J, Kiviste M (2014) Durability demands related to carbonation induced corrosion for Finnish concrete buildings in changing climate. Eng Struct. https://doi.org/10.1016/j.engstruct.2014.01.032
Helene P (2014) Introduction. In: Sales A, Sousa CAC, Almeida FCR, Cunha MPT, Lourenço MZ (eds) Corrosion in reinforced concrete structures: theory, control and analysis method, 1st edn. Elsevier, Rio de Janeiro (in Portuguese)
Bayuaji R, Darmawan MS, Husin NA, Anugraha RB, Budipriyanto A, Stewart MG (2018) Corrosion damage assessment of a reinforced concrete canal structure of power plant after 20 years of exposure in a marine environment: a case study. Eng Fail Anal. https://doi.org/10.1016/j.engfailanal.2017.11.014
Possan E, Dal Molin DCC, Andrade JJO (2018) A conceptual framework for service life prediction of reinforced concrete structures. J Build Pathol Rehabil. https://doi.org/10.1007/s41024-018-0031-7
Shekarchi M, Moradi-Marani F, Pargar F (2011) Corrosion damage of a reinforced concrete jetty structure in the Persian Gulf: a case study. Struct Infrastruct Eng. https://doi.org/10.1080/15732470902823903
Castellote M, Llorente I, Andrade C, Turrillas X, Alonso C, Campo J (2006) Neutron diffraction as a tool to monitor the establishment of the electro-osmotic flux during realkalisation of carbonated concrete. Phys B Condensed Matter. https://doi.org/10.1016/j.physb.2006.05.263
Benítez P, Rodrigues F, Talukdar S, Gavilán S, Varum H, Spacone E (2019) Analysis of correlation between real degradation data and a carbonation model for concrete structures. Cement Concr Compos. https://doi.org/10.1016/j.cemconcomp.2018.09.019
Heiyantuduwa R, Alexander MG, Mackechnie JR (2006) Performance of a penetrating corrosion nihibitor in concrete fafected by carbonation-induced corrosion. J Mater Civ Eng. https://doi.org/10.1061/(ASCE)0899-1561(2006)18:6(842)
Gandiá-Romero JM, Campos I, Valcuende M, Garciá-Breijo E, Marcos MD, Payá J, Soto J (2016) Potentiometric thick-film sensors for measuring the pH of concrete. Cement Concr Compos. https://doi.org/10.1016/j.cemconcomp.2016.02.006
Possan E, Thomaz WA, Aleandri GA, Felix EF, dos Santos ACP (2017) CO2 uptake potential due to concrete carbonation: a case study. Case Stud Constr Mater. https://doi.org/10.1016/j.cscm.2017.01.007
Wilmot RE (2007) Corrosion protection of reinforcement for concrete structures. J South Afr Inst Min Metall 107:139–146. https://www.saimm.co.za/Journal/v107n03p139.pdf
Dransfield J (2003) Admixtures for concrete, mortar and grout. In: Newman J, Choo HS (eds) Advanced concrete technology—constituent materials, 1st edn. Elsevier, Burlignton
Song J, Li Y, Xu W, Liu H, Lu Y (2019) Inexpensive and non-fluorinated superhydrophobic concrete coating for anti-icing and anti-corrosion. J Colloid Interface Sci. https://doi.org/10.1016/j.jcis.2019.01.014
Alexander M, Beushausen H (2019) Durability, service life prediction, and modelling for reinforced concrete structures: review and critique. Cement Concr Res 122:17–29. https://doi.org/10.1016/j.cemconres.2019.04.018
Sitter WR (1984) Costs for service life optimization. The law of fives, in: CEB-RILEM durability of concrete structures. In: Proceedings of the international workshop held in Copenhagen (Workshop Reported by Steen Rostam), 18–20 May, 1983. Copenhagen, CEB, pp 131–134
Unila. University of Latin American Integration, Bidding Notice: Electronic Auction No 18/2016. https://www.unila.edu.br/sites/default/files/edital_e_anexos_13.zip. Accessed 22 Nov 2017 (in Portuguese)
Dyer T (2014) Concrete Durability. CRC Press, Boca Raton, p 515p
ABNT (2008) NBR 9574: Waterproofing execution—procedure, Brazilian Association of Technical Standards, Rio de Janeiro (in Portuguese)
ABNT (2014) NBR 6118: Concrete structure design—procedure. Brazilian Association of Technical Standards, Rio de Janeiro (in Portuguese)
Gomes NA, Sales A (2004) Evaluation of carbonation of concrete in interrupted works in the city of Ribeirão Preto. In: Latin American conference on sustainable construction, national environmental technology meeting, Sao Paulo (in Portuguese)
Huang NM, Chang JJ, Liang MT (2012) Effect of plastering on the carbonation of a 35-year-old reinforced concrete building. Constr Build Mater. https://doi.org/10.1016/j.conbuildmat.2011.08.049
Possan E, Andrade O, Dal Molin DCC, Ribeiro JLD (2021) Model to estimate concrete carbonation depth and service life prediction. In: Hygrothermal behavior and building pathologies, vol 14. https://www.springer.com/gp/book/9783030509972
Brasil (2015) Ministry of Labour and Employment (MTE). NR 18: Working conditions and environment in the construction industry. https://trabalho.gov.br/images/Documentos/SST/NR/NR18/NR18atualizada2015.pdf. Accessed 15 Nov 2017 (in Portuguese)
ABNT (2013) NBR 15575: Part 1: general requirements. Performance of housing buildings, brazilian association of technical standards, Rio de Janeiro (in Portuguese)
Possan E (2010) Carbonation modeling and prediction of concrete structure life in urban environment. PhD thesis (PhD in engineering)—Engineering School, Postgraduate Program in Civil Engineering, UFRGS, Porto Alegre (in Portuguese)
Gardner D, Lark R, Jefferson T, Davies R (2018) A survey on problems encountered in current concrete construction and the potential benefits of self-healing cementitious materials. Case Stud Constr Mater. https://doi.org/10.1016/j.cscm.2018.02.002
ABNT (1991) NBR 12284: Living areas at construction sites—Procedure, Brazilian Association of Technical Standards, Rio de Janeiro (in Portuguese)
Acknowledgements
The authors would like to thank the Federal University of Latin American Integration for the opportunity to conduct this case study.
Funding
No external funding was received.
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
Conflict of interest
There is no conflict of interest.
Ethical statement
The authors declare that this paper is original, that it has not been submitted to any journal.
Additional information
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Rights and permissions
About this article
Cite this article
Possan, E., Berwanger, C., Rigo, E. et al. Protection of interrupted concrete structure to prevent degradation: a case study. J Build Rehabil 5, 18 (2020). https://doi.org/10.1007/s41024-020-00083-1
Received:
Accepted:
Published:
DOI: https://doi.org/10.1007/s41024-020-00083-1