Abstract
The dynamic programming neural-network simplex (DPNS) model, which is aimed at making some improvements to the dynamic programming neural-network (DPN) model, is proposed and used to derive refill operating rules in reservoir planning and management. The DPNS model consists of three stages. First, the training data set (reservoir optimal sequences of releases) is searched by using the dynamic programming (DP) model to solve the deterministic refill operation problem. Second, with the training data set obtained, the artificial neural network (ANN) model representing the operating rules is trained through back-propagation (BP) algorithm. These two stages construct the standard DPN model. The third stage of DPNS is proposed to refine the operating rules through simulation-based optimization. By choosing maximum the hydropower generation as objective function, a nonlinear programming technique, Simplex method, is used to refine the final output of the DPN model. Both the DPNS and DPN models are used to derive operating rules for the real time refill operation of the Three Gorges Reservoir (TGR) for the year of 2007. It is shown that the DPNS model can improve not only the probability of refill but also the mean hydropower generation when compare with that of the DPN model. It's recommended that the objective function of ANN approach for deriving refill operating rules should maximize the yield or minimize the loss, which can be computed from reservoir simulation during the refill period, rather than to fit the optimal data set as well as possible. And the derivation of optimal or near-optimal operating rules can be carried out effectively and efficiently using the proposed DPNS model.
Article PDF
Similar content being viewed by others
Explore related subjects
Discover the latest articles, news and stories from top researchers in related subjects.Avoid common mistakes on your manuscript.
References
Belew, R., McInerney, J., and Schraudolph, N., 1991, ‘Evolving networks: Using the genetic algorithm with connectionist learning’, in Langton, C., Taylor, C., Farmer, C., and Rasmussen, S. (eds.), Artificial Life II, Redwood City, CA. Addison-Wesley, 511–547.
Bernon, J. L., Boudousq, V., Rohmer, J. F., Fourcade, M., Zanca, M., Rossi, M., and Mariano-Goulart, D., 2001, ‘A comparative study of Powell's and Downhill Simplex algorithms for a fast multimodal surface matching in brain imaging’, Comput. Med. Imaging Graph. 25(4), 287–297.
Bhaskar, N. and Whitlatch, E., 1980, ‘Derivation of monthly reservoir release policies’, Water Resour. Res. 16(6), 987–993.
Cancelliere, A., Giuliano, G., Ancarani, A., and Rossi, G., 2002, ‘A neural networks approach for deriving irrigation reservoir operating rules’, Water Resour. Manage. 16(1), 71–88.
Cancelliere, A., Giuliano, G., Nicolosi, V., and Rossi, G., 2003, ‘Optimal short-term operation of a multipurpose reservoir system under limited water supply’, in Bloschl, G., Franks, S., Kumagai, M., Musiake, K., and Rosbjerg, D. (eds.), Water Resources Systems-Hydrological Risk, Management and Development, IAHS Publication, (281), 200–207.
Chandramouli, V. and Raman, H., 2001, ‘Multireservoir modeling with dynamic programming and neural networks’, J. Water Resour. Plan. Manage. 127(2), 89–98.
Chandramouli, V., Kuppusamy, K., and Manikandan, K., 2002, ‘Study on water sharing in a multi-reservoir system using a dynamic programming-neural network model’, Int. J. Water Resour. Dev. 18(3), 425–438.
Chang, F. and Chen, L., 1998, ‘Real-coded genetic algorithm for rule-based flood control reservoir management’, Water Resour. Manage. 12(3), 185–198.
Chang, L. and Chang, F., 2001, ‘Intelligent control for modelling of real-time reservoir operation’, Hydrol. Processes 15(9), 1621–1634.
Chen, L., 2003, ‘Real coded genetic algorithm optimization of long term reservoir operation’, J. Am. Water Resour. Assoc. 39(5), 1157–1165.
Datta, B. and Burges, S., 1984, ‘Short-term, single, multiple-purpose reservoir operation: Importance of loss functions and forecast errors’, Water Resour. Res. 20(9), 1167–1176.
Guo, S., 2000, Reservoir Comprehensive and Automatic Control Systems, Wuhan University of Hydraulic and Electric Engineering Press, Wuhan, China, (In Chinese).
Guo, S., Zhang, H., Chen, H., Peng, D., Liu, P., and Pang, B., 2004, ‘Reservoir flood forecasting and control system in China’, Hydrol. Sci. J. 49(6), 959–972.
Hasebe, M. and Nagayama, Y., 2002, ‘Reservoir operation using the fuzzy and neural network and fuzzy systems for dam control and operation support’, Adv. Eng. Software 33(5), 245–260.
Holland, J., 1975, Adaptation in Natural and Artificial Systems, University of Michigan Press, Ann Arbor.
Jain, S., Das, A., and Srivastava, D., 1999, ‘Application of ANN for reservoir inflow prediction and operation’, J. Water Resour. Plan. Manage. 125(5), 263–271.
Karamouz, M. and Houck, M., 1982, ‘Annual and monthly reservoir operating rules generated by deterministic optimization’, Water Resour. Res. 18(5), 1337–1344.
Karamouz, M. and Houck, H., 1987, ‘Comparison of stochastic and deterministic dynamic programming for reservoir operating rule generation’, Water Resour. Bull. 23(1), 1–9.
Koutsoyiannis, D. and Economou, A., 2003, ‘Evaluation of the parameterization-simulation-optimization approach for the control of reservoir systems’, Water Resour. Res. 39(6), 1170, doi: 10.1029/2003WR002148.
Labadie, J., 2004, ‘Optimal operation of multireservoir systems: State-of-the-art review’, J. Water Resour. Plan. Manage. 130(2), 93–111.
Naresh, R. and Sharma, J., 2001, ‘Reservoir operation using a fuzzy and neural system for hydrogeneration scheduling’, Int. J. Syst. Sci. 32(4), 479–486.
Neelakantan, T. and Pundarikanthan, N., 2000, ‘Neural network-based simulation-optimization model for reservoir operation’, J. Water Resour. Plan. Manage. 126(2), 57–64.
Nelder, J. and Mead, R., 1965, ‘A simplex method for function minimization’, Comput. J. 7(4), 308–313.
Oliveira, R. and Loucks, D., 1997, ‘Operating rules for multireservoir systems’, Water Resour. Res. 33(4), 839–852.
Ponnambalam, K., Karray, F., and Mousavi, F., 2003, ‘Minimizing variance of reservoir systems operations benefits using soft computing tools’, Fuzzy Sets Syst. 139(2), 451–461.
Rao, Z., O'Connell, P. E., Cook, D. J., and Jamieson, D. G., 2001, ‘Deriving robust operating rules for the interim control of the Kirazdere reservoir’, Water Sci. Technol. 43(5), 277–284.
Raman, H. and Chandramouli, V., 1996, ‘Deriving a general operating policy for reservoirs using neural network’, J. Water Resour. Plan. Manage. 122(5), 342–347.
Rumelhart, D., Hinton, G., and Williams, R., 1986, ‘Learning representations by back-propagating errors’, Nature 323(9), 533–536.
Saad, M., Turgeon, A., Bigras, P., and Duquette, R., 1994, ‘Learning disaggregation technique for the operation of long-term hydroelectric power systems’, Water Resour. Res. 30(11), 3195–3202.
Simonovic, S., 1987, ‘The implicit stochastic model for reservoir yield optimization’, Water Resour. Res. 23(12), 2159–2165.
Simonovic, S., 1992, ‘Reservoir systems analysis: Closing gap between theory and practice’, J. Water Resour. Plan. Manage. 118(3), 262–280.
Skinnert, A. and Broughton, J., 1995, ‘Neural networks in computational materials science: Training algorithms’, Modelling Simul. Mater. Sci. Eng. 3(3), 371–390.
Wurbs, R., 1993, ‘Reservoir-system simulation and optimization models’, J. Water Resour. Plan. Manage. 119(4), 445–472.
Xiong, L. and O'Connor, K. M., 2000, ‘Analysis of the response surface of the objective function by the optimum parameter curve: How good can the optimum parameter values be?’ J. Hydrol. 234, 187–207.
Xiong, L., O'Connor, K., and Guo, S., 2004, ‘Comparison of three updating schemes using artificial neural network in flow forecasting’, Hydrol. Earth Syst. Sci. 8(2), 247–255.
Xiong, L. and Guo, S., 2004, ‘Effects of the catchment runoff coefficient on the performance of TOPMODEL in rainfall-runoff modeling hydrological processes’, Hydrol. Processes 18(10), 1823–1836.
Yeh, W., 1985, ‘Reservoir management and operations models: A state-of-the-art review’, Water Resour. Res. 21(12), 1797–1818.
Young, G., 1967, ‘Finding reservoir operating rules’, J. Hydraulics Div. 93(6), 297–321.
Zhang, H., Guo, S., Zhou, F., Liu, P., Cheng, H., Chen, G., Min, Y., and Yang, W., 2005, ‘Flood forecasting model for Three Gorges Reservoir intervening basin by considering the precipitation prediction’, Journal of Yangtze River Scientific Research Institute, 22(1), 9–12 (In Chinese).
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Liu, P., Guo, S., Xiong, L. et al. Deriving Reservoir Refill Operating Rules by Using the Proposed DPNS Model. Water Resour Manage 20, 337–357 (2006). https://doi.org/10.1007/s11269-006-0322-7
Received:
Accepted:
Issue Date:
DOI: https://doi.org/10.1007/s11269-006-0322-7