Abstract
Supply chain is a complex system that involves many system elements from various functional areas. Performance of a supply chain heavily depends on the effectiveness of communication and coordination among these system elements and functional areas. However, a large and complex supply chain usually makes it difficult to coordinate and thus degrades its performance. This paper focuses on the development of a systematic approach with the following objectives: (1) to identify and quantify the interactions among the system elements in a supply chain; (2) to decompose the large interdependent group of system elements into smaller and manageable sub-groups; and thus (3) to improve the structure of the supply chain system. A supply chain system is first decomposed into subsystems and system elements from which the interactions (i.e., independent, dependent and interdependent relationships) are studied and documented by design structure matrix (DSM). Next, the interaction strengths among the related system elements are quantified. Cluster analysis is used to decompose the large interdependent group into smaller ones in order to provide a better supply chain system structure. The effectiveness of this systematic approach is demonstrated by an illustrative example. The result shows that it is able to improve the system structure of a supply chain that will be useful for the supply chain reengineering.
Article PDF
Similar content being viewed by others
Avoid common mistakes on your manuscript.
References
Alexander C. (1964) Notes on the synthesis of form. Harvard University Press, MA
Badiru A.B., Pulat P.S. (1995). Comprehensive project management: Integrating optimization models, management principles, and computers. Prentice Hall, NJ
Beamon B.M. (1998). Supply chain design and analysis: Models and methods. International Journal of Production Economics, 55(3): 281–294
Burley, H. (2002). Supply chain modeling: An overview of practice and methodology. Business Research Papers, University of Southern Queens Land, 22–35.
Carmel E. (1994). Time-to-completion in software package startups. Proceedings of the IEEE International Conference on System Sciences, 4: 498–507
Cetinkaya S., Bookbinder J.H. (2003). Stochastic models for the dispatch of consolidated shipments. Transportation Research Part B, 37(8): 747–768
Chandra P., Fisher M.L. (1994). Coordination of production and distribution planning. European Journal of Operational Research, 72(1): 503–517
Chandra C. (2001). Enterprise architectural framework for supply-chain integration. Industrial Management and Data Systems, 101(5): 290
Chung, W. Y., Guinan, P. J. (1994). Effects of participative management. Proceedings of the ACM SIGCPR Conference, 252–260.
Chopra S. (2003). Designing the distribution network in a supply chain. Transportation Research Part E, 39(2): 123–140
Chen S.J., Lin L. (2002). A project task coordination model for team organization in concurrent engineering. Concurrent Engineering: Research and Applications, 10(3): 187–203
Chen S.-J., Lin L. (2003). Decomposition of interdependent task group for concurrent engineering. Computers Industrial Engineering, 44: 435–459
Chu C.-H. (1989). Cluster analysis in manufacturing cellular formation. OMEGA, 17(3): 289–295
Clark K.B., Wheelwright S.C. (1992). Organizing and leading “heavyweight” development teams. California Management Review, 34(3): 9–28
Cohen M.A., Lee H.L. (1989). Resource deployment analysis of global manufacturing and distribution networks. Journal of Manufacturing Operations Management, 15(2): 81–104
Cooper M.C., Ellram L.M., Gardner J.T., Hanks A.M. (1997a). Meshing multiple alliances. Journal of Business Logistics, 18(1): 67–88
Cooper M.C., Lambert D.M, Pagh J.D. (1997b). Supply chain management: More than a new name for logistics. International Journal of Logistics Management, 8(1): 1–13
Das S.K., Abdel-Malek L. (2003). Modeling the flexibility of order quantities and lead-times in supply chains. International Journal of Production Economics, 85(2): 171–181
Duran B. S., Odell P.L. (1974). Cluster analysis: A survey. Springer, NY
Eppinger, S. D., Whitney, D. E., Smith, R. P., Gebala, D. (1990). Organizing the tasks in complex design projects. ASME: Design Theory and Methodology, Chicago, IL, 39–46.
Everitt B. (1980). Cluster analysis. Wiley, NY
Garavelli A. (2003). Flexibility configurations for the supply chain management. International Journal of Production Economics, 85(2): 141–153
Gordon A.D. (1981). Classification: Methods for the exploratory analysis of multivariate data. Chapman and Hall, NY
Hartigan J.A. (1975). Clustering algorithms. Wiley, NY
Johnson D., Johnson F. (1991). Joining together: Group theory and group skills. Prentice Hall, NJ
Kusiak A. (1990). Intelligent manufacturing systems. Prentice-Hall, NJ
Kusiak A., Wang J. (1993). Efficient organizing of design activities. International Journal of Production Research,31(4):753–769
Lanigan M.J. (1994). Task estimating: Completion time versus team Size. Engineering Management Journal, 4(5): 212–218
Lovejoy W.S. (1992). Rationalizing the design process. Proceedings of the Design Management Conference, Anderson Graduate School of Management, UCLA, CA.
McCord, K. R., Eppinger, S. D. (1993). Managing the integration problem in concurrent engineering. MIT Working paper 3594.
O’Neil B.F., Iveson J.L. (1992). Strategically managing the logistics function. Logistics and Transportation Review, 27(4): 359–377
Olsmats C.M.G., Edghill J.S., Towill D.R. (1988). Industrial dynamics model building of a close-coupled production-distribution system. Engineering Costs and Production Economics, 13(1): 295–310
Pimmler, T.U, Eppinger, S. D. (1994). Integration analysis of product decompositions. ASME: Design Theory and Methodology. Minneapolis, MN.
Romano P. (2003). Coordination and integration mechanisms to manage logistics processes across supply networks. Journal of Purchasing and Supply Management, 9(3): 119–134
Scott J.M., Mauricio P., Farris J.F., Kirk R.G. (2003). Integrating the warehousing and transportation functions of the supply chain. Transportation Research Part E, 39(2): 141–159
Smith R.P., Eppinger S.D. (1997a). Identifying controlling features of engineering design iteration. Management Science, 43: 276–293
Smith R.P., Eppinger S.D. (1997b). A predictive model of sequential iteration in engineering design. Management Science, 43: 1104–1120
Srinivasan M., Moon Y.B. (1999). Comprehensive clustering algorithm for strategic analysis of supply chain networks. Computers Industrial Engineering, 36(3): 615–633
Steward D.V. (1981). The design structure system: A method for managing the design of complex systems. IEEE Transactions on Engineering Management, 28(1): 71–74
Stock G.N., Greis N.P., Kasarda J.D. (2000). Enterprise logistics and supply chain structure: The role of fit. Journal of Operations Management, 18(5): 531–547
Supply Chain Council. (1996). Supply chain operations reference (SCOR) model. Overview of SCOR Version 5.0.
Tsay A.A. (1999). Quality flexibility contract and supplier-customer incentives. Management Science, 45(10): 1339–1358
Ulrich K.T., Eppinger S.D. (1995). Product design and development. McGraw-Hill, NY
Yan H., Yu Z., Cheng T.C.E. (2003). A strategic model for supply chain design with logical constraints: Formulation and solution. Computers and Operations Research, 30(14): 2135–2155
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
(Gary) Chen, SJ., Huang, E. A systematic approach for supply chain improvement using design structure matrix. J Intell Manuf 18, 285–299 (2007). https://doi.org/10.1007/s10845-007-0022-z
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10845-007-0022-z