Introduction

One of the important issues for estimating construction time and cost of mechanized tunnels is the accurate prediction of TBM performance parameters, notably the penetration rate. During the past few decades, several empirical models have been developed for the prediction of TBM penetration rate by analyzing the interaction between the engineering geological properties of rock and the operating parameters of the TBM (Yagiz 2008; Gong and Zhao 2009; Hassanpour et al. 2011, 2015, 2020; Farrokh et al. 2012, Delisio et al. 2013; Koopialipoor et al. 2019; Lazemi and Dehkordi 2019; Zhou et al. 2020) as summarized in Table 1.

Table 1 Review of empirical predictive models for TBM performances

As presented in Table 1, the empirical models are mainly based on measured data of engineering geological properties of intact rock and rock mass (i.e., uniaxial compressive strength (UCS), rock-quality designation (RQD), rock mass rating (RMR), and geological strength index (GSI)) and TBM operating parameters collected continuously during tunnel excavation. It was reported in Table 1 that correlations between the measured engineering-geological properties and TBM operation parameters are defined by statistical analysis (Yagiz 2008; Gong and Zhao 2009; Salimi et al. (2018); Hassanpour et al. 2011, 2015, 2020; Farrokh et al. 2012; Delisio et al. 2013; Koopialipoor et al. 2019; Lazemi and Dehkordi 2019) and Computer-Aided Models (i.e., neural network models and genetic programming approaches) (Koopialipoor et al. 2019; Zhou et al. 2020).

The empirical models have great importance during the early stages of tunneling and design works since this is a more practical method as compared with extensive and expensive experimental solutions (Yagiz 2008). On the one hand, the empirical models offer the greatest correspondence with the reality, but on the other hand, the proposed correlations are strongly dependent on the TBM specifications and ground conditions of the case study (Farrokh et al. 2012; Brino et al. 2015; Armetti et al. 2018). In other words, the empirical models are site-specific in terms of the geological conditions along the tunnels.

In addition, one important shortcoming in almost all of the proposed models is that they have been developed with assumption that chipping occurs during rock cutting process. However, in some cases, due to high strength of rock and/or insufficient load of cutter, chipping phenomenon beneath the cutters is not complete.

The cutting process in hard rock for a tunnel boring machine involves roller disc-cutters applying cyclical pressure on concentric rings in tunnel face with fragmentation occurring between disc cutters’ paths (Fig. 1a). Recent studies by M. Villeneuve (2008), C. Frenzel et al. (2012), MC. Villeneuve et al. (2012), and MC. Villeneuve (2017) explained the difference of chipping and grinding modes and concluded that the chipping process is the basis for understanding rock cutting during TBM tunneling and is postulated to be accomplished by inducing tensile fractures and cracks into the rock mass, which then propagate parallel to the tunnel face.

Fig. 1
figure 1

a Schematic cross section of TBM disc cutter and tunnel face showing boring process; b penetration versus thrust graphs and regions of grinding and chipping performance (Villeneuve et al. 2012)

Rock failure mechanism during excavation with a disc cutter is illustrated in Fig. 1a. A crushed zone develops beneath the disc cutter as it is forced into the rock (Balci and Bilgin 2007; Labra et al. 2017). The fractures and cracks induced into the rock act to precondition the rock, making it easier to cut during subsequent rotations of the TBM cutterhead, while the fractures and cracks propagating parallel to the tunnel face will colligate with similar fractures and cracks induced by adjacent disc cutters to create the rock cuttings called chips.

Grinding occurs when fractures do not propagate through the rock effectively, and only fine rock cuttings are generated. So, muck size distributions are very different in grinding and chipping conditions. Figure 2 shows an overview of excavated rock size distributions from the different TBM projects in Europe, where excavation has occurred in chipping conditions (Berdal et al. 2018). In order to compare generated rock cuttings in grinding and chipping, a typical muck size distribution curve from the SEL6 project, where the grinding phenomenon was dominant, was also added to Fig. 2. As shown, the excavated materials in the SEL6 project are very finer than the muck created in other projects.

Fig. 2
figure 2

Excavated rock size distributions from various hard rock TBM projects in Europe (chipping conditions) and their comparison with muck size distribution in SEL6 project (grinding condition)

Traces of disc cutter rotations as well as created ridges and grooves, in tunnel faces of Uma Oya (Sri Lanka) and SEL6 projects, are illustrated in Figs. 3 and 4, respectively. As shown in these figures, grooves in grinding conditions are deeper than chipping-dominated conditions. The reason for this could be related to the cutting mechanism in these processes. When grinding is dominated in the rock cutting process, fractures do not propagate through the rock, deep kerfs are formed beneath the disc cutters, and large ridges remain between two adjacent grooves. Also, a large quantity of rock powder particles and small grains are generated. In contrast, in chipping-dominated mode, the rock is cut midway between the two kerfs and also sideways. Rock debris is rarely produced, and only a small amount of fine rock powder particles are generated. Therefore, kerf depth on a rock face in the grinding condition is dipper than chipping.

Fig. 3
figure 3

Two views of tunnel face in Uma Oya project, Sri Lanka; a chipping-dominated mode and b grinding-dominated mode

Fig. 4
figure 4

Two views of tunnel face in SEL6 project. a Chipping-dominated mode and b grinding-dominated mode

Efficient penetration, as a function of the load, was applied to the disc cutters, and the resulting penetration relies on ensuring that a chipping mechanism dominates over a crushing under the disc cutter of TBM (Fig. 1a). As shown in Fig. 1b, efficient cutter penetration, as a function of thrust (cutter load), relies on ensuring that a chipping mechanism dominates over a crushing mechanism beneath the cutters. The most important factors influencing cutting efficiency are the cutter load, engineering geological properties (e.g., UCS, RQD, and discontinuity spacing) and initial penetration. The relationships between the intact rock strength, disc cutter thrust force (cutter load), and penetration were very well introduced by C. Frenzel et al. (2008) and are shown in Fig. 5a. As shown, practically, when cutter load is not sufficient (less than 150 kN in weaker rocks), grinding is the dominant phenomenon in rock cutting process. Field studies in similar projects have shown that a cutterhead penetration (PRev) of more than 4–5 mm/rev is required for chipping phenomenon to occur completely.

Fig. 5
figure 5

a Operating limits of a TBM at different rock strengths (modified from Frenzel et al. 2008). b Thrust-penetration database including previous studies presented in Table 1 (yellow area) and this study model (green area)

As shown in Fig. 5b, the previous studies have almost exclusively focused on penetrations bigger than 4–5 mm/rev, where a chipping mechanism dominates, whereas this study emphasizes grinding dominated excavation.

As noted above, previous empirical models for predicting TBM performance were limited to the chipping mode. Furthermore, since excavation in grinding mode may impact TBM performance, a need for an improved penetration predictive model for TBMs operating in grinding conditions became evident. Therefore, in this study, attempts were made to develop a new empirical model based on the comparison between the engineering geological properties and the TBM performance data collected during the excavation of the Southern Extension of Line 6, Tehran Metro.

Description of the analyzed tunnel project

The SEL6 (Southern Extension of Line 6) tunnel, with a total length of 6 km and a boring diameter of 9.2m, is an extension of the Tehran metro line 6 (Fig. 6) in an area where Cretaceous limestone rock masses outcrop in the middle of Tehran alluviums (Fig. 7). As shown in Fig. 8, Tehran metro line 6 project with a length of 38 km and 31 stations is the longest metro line in Iran that has been constructed between Dolat-Abad, at South-east, and Shahran, at North-west of Tehran, by TBM and NATM methods (Tarigh Azali et al. 2018). The SEL6 tunnel has been designed to be completed using a refurbished EPB-TBM (originally designed to work in soft ground condition). The boring was started from the Northern (Dolat-Abad) portal in 2017 and has not been finished yet. These excavations are all shallow with typical depths to the tunnel crown of between 15 and 30 m. The bored section of SEL6 tunnel has passed through two different geological formations, namely, Quaternary Alluviums of Tehran and Cretaceous limestone rocks.

Fig. 6
figure 6

Location of line 6 of Tehran Metro and its southern extension (SEL6 tunnel) on Tehran map

Fig. 7
figure 7

Geological map of SEL6 tunnel (Firouzei et al. 2019)

Fig. 8
figure 8

Longitudinal geological section along the SEL6 tunnel (From chainage 0+200 to 2+600) (Firouzei et al. 2019)

Regional geological setting

Tehran is located in the southern front of the Alborz Mountain ranges, a tectonically active region between the Caspian Sea and Iran plateau. The Tehran region is bounded to the north by the Alborz Mountains, to the southeast by mounts Bibi-Shahrbanoo and Sepahieh. Tehran is divided into three structural and stratigraphic zones including the northern mountains, eastern and southern mountains, and the Tehran plain (Tarigh Azali et al. 2013). According to Tarigh Azali et al. (2013), the Tehran plain mainly consists of quaternary formations, which are often the result of erosion and redeposition of former sediments. The plain extends to the south as a young fan and generally composed of unsorted fluvial and river deposits. The effects of climatic processes as well as recent tectonic activities have caused alluvium of various types, thicknesses, and grain sizes. Mount Bibi-Shahrbanoo, is exposed as some hills, is located in the southeast of Tehran, in the eastern margin of Shahr-e-Rey. The hills are a continuation of the mount Bibi-Shahrbanoo toward the inner part of the city. The hills are composed of the dolomite and limestone belonging to the Triassic and Cretaceous geological periods, ranging from medium-bedded to massive rocks with the color of light brown and gray.

SEL6 tunnel geology

A geological map and a longitudinal geological section of the SEL6 tunnel are shown in Figs. 7 and 8, respectively. As shown in these figures, SEL6 tunnel excavated by TBM is located in two distinct tectonic formations called Tehran alluvium and Cretaceous limestone. These are, respectively, composed of fine-grain soil and strong limestone rocks. As presented in Fig. 8, moving from the north (left) to the south (right), the first part of the tunnel is intersected by a zone of fine-grain soil unit which precedes the northern part of the Bibi-Shahrbanoo hills. After around 800 m from the Dolat-Abad portal, the tunnel pass through Upper Cretaceous rocks, mainly composed of medium to thick-bedded limestone (Rahsaz-Tarh Consulting Engineers 2016). Figure 9 shows the outcrops of the limestone, which were observed during geological field surveys. The two contacts between limestone layers and the alluviums are composed of mixed soil and blocky rock called the transitional zone.

Fig. 9
figure 9

a Tunnel path and workshop from the mining site, b outcrops of rock covered by mining debris and filled soil, c alternation of shale and limestone layers, d joint with opening, e mirror fault, and f blocky rock (Rahsaz-Tarh Consulting Engineers 2016)

Machine specifications

The main features of the Herrenknecht earth pressure balance TBM used for the excavation of the SEL6 tunnel are presented in Table 2, and a picture of the machine in factory is shown in Fig. 10.

Table 2 Specifications of employed TBM
Fig. 10
figure 10

TBM machine used in the excavation of SEL6 tunnel

The preliminary route of the tunnel was composed of alluvium and soft ground, geologically. Generally, TBM is designed based on the given and dominant site ground conditions. In other words, the geological conditions determine the type and position of the excavation tools on the TBM cutterhead. According to geological conditions of the preliminary tunnel route, double-cutters were chosen and were installed on cutterhead as the cutting tool. But, because of environmental and traffic limitations, the SEL6 tunnel route was changed. The engineering geological studies revealed that more than 1200 m of the new route is composed of limestone rocks, although the cutterhead was built for soft ground and equipped with double-cutters. As shown in Fig. 10, the TBM is equipped with 26 double-cutters with 17-inch rings.

A double-cutter is composed of two rings but has only one bearing. According to design criteria, for 17-inch cutter, every bearing can carry up to 270 kN. Therefore, during excavation, the machine operator cannot apply force more than 135 kN on every ring. In other words, each ring cannot practically apply more than 135 kN into the rock which is not sufficient to create penetration higher than 5 mm/rev.

In this project, where the cutting load applied by disc cutter was inadequate for penetrating into rock, the chipping process practically became incomplete and the grinding process was the dominant phenomena. Therefore, this project provided an opportunity to investigate the relationship between cutterhead penetration and engineering geological characteristics of limestone in grinding conditions.

Development of a database

In this study, to analyze the TBM performance in limestone rock units, a comprehensive database was established. The database is composed of two main parts. The first one includes machine operating parameters (such as applied thrust force, cutter load, RPM, torque, cutterhead penetration, penetration rate, and boring time) that were recorded continuously by the TBM acquisition system during tunneling. These parameters were averaged for all of the 1.5m installed rings. The second part comprises engineering-geological parameters of rock mass and intact rock obtained from extensive site investigations. The site investigation included a detailed tunnel face mapping of the rock mass, muck assessment and sampling, rock coring, and laboratory tests. In order to continuously log the various rock mass conditions encountered by TBM, the tunnel face mapping and rock sampling were frequently conducted (Fig. 11).

Fig. 11
figure 11

The tunnel face mapping and the discontinuity condition in front of the tunnel face

During the excavation, tunnel face mapping, muck sampling, and rock core sampling at the same tunnel face were carried out about once per 10–50 m when the machine stopped for cutterhead inspection and cutter replacement. More than 40 tunnel faces were mapped in the SEL6 tunnel during tunneling. The rock mass conditions varied from fresh limestone rock masses to highly fractured and moderately weathered rock masses. Usually, the measured and recorded parameters in the tunnel face mapping included lithology, rock weathering grade, type of discontinuities (i.e., joints, faults, veins, and bedding), and their properties, as orientation, spacing and surface condition (following ISRM (1978)), and also the angle between the tunnel axis and the discontinuity plane and RQD and geological strength index (GSI).

To collect samples for laboratory tests, as point load tests (Fig. 12b), UCS, and petrographic analysis, the core samples were taken by portable drilling machine during tunnel face mapping (Fig. 12a). Finally, these data were specified to the corresponding 1.5m rings.

Fig. 12
figure 12

a Drilling and taking the core rock samples during tunnel face mapping and b point load test (PLT)

Most important engineering geological properties of the rock masses and the TBM operating parameters are described and statistically analyzed in the following.

Orientation of discontinuities in rock masses

Experiences show that joint orientation has crucial importance on the performance of TBM. Usually, the surrounding rock mass of the tunnel contains 2–3 major sets of discontinuities plus some random joints. Each discontinuity set, depending on its orientation, may have different effects on the TBM penetration. On the other hand, the higher the discontinuity density or frequency, the larger the effect of the discontinuities on the TBM penetration. To be able to quantify the influence of discontinuity orientation on the cutterhead penetration, the alpha angle (α) that is the angle between the tunnel axis and the panes of the discontinuity plane can also be determined from the tunnel face mapping. The alpha (α) in degrees can be calculated using the following equation (Bruland 1998):

$$ \alpha =\arcsin \left(\sin {\alpha}_f\times \sin \left({\alpha}_t-{\alpha}_s\right)\right), $$
(1)

where αf and αs are respectively the dip and strike of encountered planes of discontinuity in the rock mass and αt is the direction of the tunnel axis in degrees. The histogram and the descriptive statistical analysis of the alpha angle (α) gathered during excavation and recorded in the database are presented in Fig. 13a and Table 3, respectively.

Fig. 13
figure 13

Distribution curve and frequency histogram of variation of various parameters in the database. a α (alpha angle), b UCS, c RQD, d GIS, e PRev, and f Fn

Table 3 Descriptive statistics of various parameters in the database

Intact rock strength

Uniaxial compressive strength (UCS) is commonly used to assess the rock mass boreability (Gong and Zhao 2009; Armetti et al. 2018, Hassanpour et al., 2015); moreover, as observed in the Table 1, the predictive models of TBM performance mainly involve UCS as an input parameter. In this study, UCS values have been determined using point load tests (ISRM 1985), which have been carried out both in the job site and in the rock mechanics laboratory. The statistical description and descriptive statistical analysis of UCS values in the database are shown in Fig. 13b and Table 3, respectively. This figure shows that in the SEL6 tunnel, the UCS range varied from 70 MPa to 110 MPa.

Rock mass parameters

During the visiting and mapping of tunnel face, the collected data have been employed to identify the quality class of limestone rock masses. In this study, the rock mass, encountered at the tunnel face, has been classified according to the RQD and GSI (Hoek et al. 1998; Marinos and Hoek 2001; Marinos et al. 2005; Marinos 2019). Distribution curves and frequency histograms of RQD and GSI data are shown in Fig. 13c, d, respectively. As shown in Fig. 13c, the resulting RQD values range from 60 to 100. According to RQD index, the limestone is mostly characterized by fair to excellent rock quality. Furthermore, as presented in Fig. 13d., the surrounding rock mass of the tunnel face, which is composed of limestone, according to GSI is mainly classified as massive to very blocky (GSI = 40–85). Also, the descriptive statistical analysis of RQD and GSI is presented in Table 3.

TBM performance in the field

During excavation, all machine operating parameters have been extracted directly from the TBM acquisition system and recorded on a computer connected to the control system via a local connection that allowed calculating the operating and TBM performance parameters. As a result of using logged data, the penetration, total gross thrust, cutter load, RPM, and torque were computed.

According E. Farrokh et al. (2012), a big problem for shielded TBMs, the same with this project, is that the Fn (disc cutter normal force) value used in the predictive calculation is a gross value and does not include any friction losses. The net cutter force (Fn) delivered to the cutterhead may be significantly less than the nominal cutter load calculated from the applied TBM thrust. Therefore, in this study, to determine Fn, the friction losses are subtracted from the TBM thrust.

A general review of previous prediction performance models, presented in Table 1, shows that depending on the analytical strategy adopted, different objective penetration parameters were employed to aid the prediction of the TBM performance. Usually, the models predict performance parameters such as PR (penetration rate in m/h) and PRev (penetration per cutterhead revolution). Other indexed parameters employed in some of the empirical prediction models include specific penetration (SP inverse of FPI) and Field Penetration Index (FPI) all of which represent the ease or difficulty of rock mass boring. A more comprehensive description of different objective penetration parameters can be found in the study of E. Farrokh et al. (2012). Meanwhile, for the development of alternative models in grinding conditions, PRev and Fn (cutter load) can be used in statistical studies to allow for an analysis of the real relationship between the various parameters. Variations of measured cutterhead penetration (PRev) and cutter load (Fn) at each sampling point through the tunnel are shown as two distribution curves and frequency histograms in Fig. 13e, f, respectively. Also, the descriptive statistical analysis of TBM performance parameters is presented in Table 3.

Finally, in this study, after extensive data collection in SEL6 tunnel, to perform the analyses for predicting the PRev in grinding condition, a database including engineering geological properties of rock masses and the corresponding TBM operating parameters was established. The data set for each selected ring is shown in Table 4. It must be emphasized that in all 41 selected rings, reliable engineering geological data were available and grinding condition was dominant in boring process.

Table 4 The database obtained by engineering geological field investigation and analysis of TBM operation parameters

Development of new empirical equation for grinding condition

TBM performance depends on both engineering geological (intact rock/rock mass) properties and the operational parameters of the machines (Armetti et al. 2018). In this study, two different objective parameters were used to develop a new model for the estimation of the TBM penetration under a given set of encountered ground conditions in the limestone where the grinding is the dominant phenomenon. In rock engineering practices, the statistical-based empirical equations have been extensively employed to predict a required parameter from some simple tests or available collected data (Gunsallus and Kulhawy 1984; Yagiz 2008). After the establishment of the database (presented in Table 4), one of the commercial software packages for standard statistical analysis (SPSS) was employed to perform the stepwise and multiple variable regression analyses between engineering geological, operating, and performance parameters. The statistical procedure employed in this study included three steps. At the first step, the bivariate analyses between the cutterhead penetration and other parameters are required for identifying influential parameters. After that, the second step included multiple regression analyses to develop the best-fit combination of key parameters that demonstrate the best statistically significant and strongest correlation to PRev. Finally, the prediction capability of the new empirical model was verified using the testing database information.

The simple and bivariate analyses

To obtain the correlations between engineering geological properties (UCS, Alpha, RQD, and GSI) and TBM operating parameter (Fn), as dependent variables, and actual measured Prev, as independent one, stepwise statistical analyses were carried out and the effect of each engineering geological properties and TBM operating parameters on the Prev was assessed. Figure 14 depicts the correlation between independent variables and cutterhead penetration (PRev). The results of the stepwise regression analysis and obtained equations between the PRev and each independent variable are also summarized in Table 5. As shown in Fig. 14 and Table 5, among the independent variables, UCS and Fn show good correlations with PRev (R2 > 0.61), whereas the quadratic relation between the alpha angle (α) and PRev is found very weak with a correlation coefficient (R2) of 0.13.

Fig. 14
figure 14

Correlation between independent variables and measured penetration. a Fn-PRev, b UCS-PRev, c RQD-PRev, d GSI-PRev, and e alpha-PRev

Table 5 Summary results of the determination of regression coefficients of the engineering geological and operating parameters with measured PRev

To investigate the effect of the TBM thrust force on the penetration, the cutter load (Fn) is employed in this study, and the relationship between the PRev and Fn was achieved with an R2=0.61 which is presented in Table 5. As can be seen in Fig. 14a, PRev is a maximum at higher Fn levels. As Fn values increase, PRev values also increase.

In accordance with precedent studies (Graham and PC 1976; Farmer and Glossop 1980; Gong and Zhao 2009; Hassanpour et al. 2011; Armetti et al. 2018), the intact rock strength is related to TBM penetration with an exponential relationship. By increasing the UCS values, the PRev values decrease. According to statistical analysis, an exponential relationship between UCS with the PRev was found good with a correlation coefficient (R2) of 0.67 as demonstrated in Fig. 14b and its empirical equation relating them is also presented in Table 5.

Also, among rock classification parameters (RQD and GSI), as shown, GSI shows a bit better correlation than RQD. Figure 14c, d shows the results of correlating PRev and RQD and GSI, respectively. RQD is only based upon the discontinuity spacing, whereas GSI value is estimated by two of the main rock mass parameters, including the structure and the condition of the discontinuity surfaces, so the developed equation shows a reasonable correlation between the PRev and GSI rather than RQD. The empirical equation relating the GSI, RQD, and TBM penetration is presented in Table 5.

Multivariate regression analysis

As mentioned before, in this study, to find an empirical equation and describe the relationships between multiple the independent variables (Fn as the operational parameter and USC, alpha angle (α), RQD, and GSI as engineering geological properties) and dependent variable (PRev), a multiple regression model with a 95% confidence level was used by considering linear functions as follows:

$$ Y={\beta}_0+{\beta}_1{x}_1+{\beta}_2{x}_2+\dots +{\beta}_n{x}_n, $$
(2)

where Y is the dependent variable, β0 is a constant value, where the regression line intercepts the Y-axis, x1 to xn are the independent variables, and β1 to βn are regression coefficients for x1 to xn, respectively.

Multiple regression analyses, including the significance of the regression coefficients of correlation and the significance of the regressions, were applied using the SPSS software. The influence of each independent variable on PRev was evaluated using forward stepwise regression analyses which can generate different models with input variables as shown in Table 6. In these models, the maximum determination coefficient (R2 = 0.88) and the maximum correlation coefficient (R=0.94) were obtained in model 3, which selected Fn, UCS, and GSI as input variables.

Table 6 Summary of the generated models for forward stepwise regression analysis

To test the significance of the regressions, the analysis of variance (F test) was conducted. The F test results, named ANOVA for the generated different models, are presented in Table 7. All models have different tabulated Fischer index values (F values), since all of them have different numbers of independent variables. According to this rule, when the computed F value is greater than the tabulated F value, there is a real and significant relationship between a dependent (actual PRev) and independent variables (UCS, GSI, and Fn) for generated model. The statistical values F value and level of significance (Sig.) of model 3 are 114.366 and 0.000, respectively. Therefore, the null hypothesis can be rejected, which means that at least one of the independent variables can significantly affect PRev.

Table 7 Analysis of variance (ANOVA) for the significance of regression for each generated model

Furthermore, the significance of the coefficient of correlation (R values) was determined by the t test, and their results for the generated models are presented in Table 8. The t test shown in Table 8 indicates that the coefficients of model 2 are true. Therefore, in this study, there is a significant linear relationship between independent variables (UCS and Fn) and dependent (actual PRev) in the third model.

Table 8 Multivariate regression coefficients and excluded variables from each generated model

Dependent variable: PRev

Consequently, based on the statistical analysis, the correlations obtained between the variables are linear functions, and it appears that the best results could be obtained by excluding the two parameters of alpha angle and RQD. The results show the best-fit regression between PRev as response parameter and UCS and Fn predictors, in a linear combination with a 95% confidence level. As a result, new performance predictive equation in grinding condition was empirically obtained as a function of measured engineering geological properties and operational parameter in the model 3 as illustrated in Tables 6, 7, and 8, as follows:

$$ \mathrm{PRev}=1.98+0.035\mathrm{Fn}-0.03\mathrm{UCS}-0.011\mathrm{GSI}, $$
(3)

where PRev is in mm/rev, UCS is in MPa, and Fn is disc cutter normal force in kN.

Moreover, a penetration prediction chart for grinding condition from Eq. (3) is developed and shown in Fig. 15 for convenient and practical application. The approximate range of PRev can be estimated quickly using Fig. 15 in limestone rocks with different UCS and Fn values for different GSI values. However, it must be emphasized that the influences of the rock mass classification systems (GSI and RQD) and alpha angle on the penetration are not significant in the developed model, statistically.

Fig. 15
figure 15

Chart for estimating PRev in limestone rocks based on UCS and Fn in grinding condition for different GSI values. a GSI=60, b GSI=80, and c GSI=100

Verification of the developed model

To evaluate the accuracy of the developed model in this study and also some existing prediction models (Graham 1976; Hassanpour et al. 2015; Farrokh et al. 2012), the measured penetration per revolution (PRev) is compared with the predicted one in each sampling point throughout the tunnel. The measured and predicted values of the PRev are compared in Fig. 16. Moreover, to verify the performance of the developed model and some existing prediction models, root mean square error (RMSE) (Eq. 4) and R2 (coefficient of determination) parameters are employed in this study and also presented in Table 9. RMSE is a measure of how concentrated the data is around the line of best fit. Statistically, a perfect model with excellent predictability can achieve R2 and RMSE values of 1 and 0, respectively. Furthermore, lower RMSE values refer to lower errors and better performance of the proposed model.

$$ \mathrm{RMSE}=\sqrt{\frac{1}{n}\sum \limits_{i=1}^n{\left({z}_i-{\overset{\check{} }{z}}_i\right)}^2}, $$
(4)
Fig. 16
figure 16

Comparison of measured and predicted penetrations (PRev) using the developed model in this study and selected prediction models. a Graham (1976) model, b Hassanpour et al. (2015) model, c Farrokh et al. (2012) model, and d the model developed in this study

Table 9 The RMSE values calculated for the model developed in this study and selected prediction models

where zi is the real value, i is the predicted value, and n is the number of data points. As shown in Fig. 16 and Table 9, the R2 value and RMSE of the developed model in this study were obtained 0.8 and 0.26 respectively, whereas the RMSE value of existing prediction models, Graham 1976, Hassanpour et al. 2015, and Farrokh et al. 2012, were measured 2.49, 1.73, and 4.25 respectively, which indicate that the developed model in this study has an acceptable accuracy level in predicting TBM PRev in grinding conditions. Also, the predicted values by this model are quite close to the actual ones, and most of the ΔPRev values (the difference between PRev predicted using Eq. (3) and the measured PRev) are less than 0.5 mm/rev. In general, the higher accuracy of the proposed model shows the potential for a more accurate prediction of cutterhead penetration for grinding conditions in limestone strata and low cutter load. Further study of this approach depends on the establishment of new databases that incorporate additional mechanized tunneling projects and engineering geological factors.

Conclusion

The geotechnical and engineering geological surveys during excavation of SEL6 tunnel allowed subdividing the tunnel into two distinct geological formations including Tehran alluviums and strong Cretaceous limestone. This research has focused on TBM performance in limestone strata. In a major part of these limestone rocks, due to machine limitations, excavation was carried out on grinding-dominated mode. In fact, in these parts of tunnel, cutterhead penetration was usually less than 4 mm/rev.

In this study, based on the rock cutting process, the engineering geological properties influencing TBM performance were identified, firstly. Then, four rock mass parameters, namely, UCS, alpha angle, RQD, and GSI, and one operational TBM parameter named Fn were chosen to evaluate machine performance in selected tunnel sections in limestone strata where grinding phenomenon was dominant. Then, a comprehensive database which includes rock mass properties, operating parameters of machine, and TBM performance parameters were developed. By analyzing the face mappings and screening the rock test results, a total of 41 data sets with reliable data were selected. By using multiple variable linear regression analyses, a prediction model was proposed to evaluate TBM performance range for the grinding conditions.

The comparison between rock properties and TBM indices showed that UCS, GSI, and Fn affect the TBM penetration more effectively than other parameters. It was also shown that the uniaxial compressive strength of intact rock (UCS) and the geological strength index (GSI) have been successfully considered to estimate the boreability of a given rock formation where grinding occurs.

Also, the proposed empirical relationship in this article should be considered valid only for new projects with similar engineering-geological conditions and TBM specifications. Further research should be done to investigate the effect of engineering geological properties on TBM performance, and more field data from different mechanized projects need to be collected to develop a universal model that can be applied to other lithologies and TBM specifications.