Summary
As organizations move from creating plans for individual production lines to entire supply chains it is increasingly important to recognize that decisions concerning utilization of production resources impact the lead times that will be experienced. In this paper we give some insights into why this is the case by looking at the queuing that results in delays. In this respect, special mention should be made that it is difficult to experience related empirical data, especially for tactical planning issues. We use these insights to survey and suggest optimization models that take into account load dependent lead times and related “complications.”
Access provided by Autonomous University of Puebla. Download to read the full chapter text
Chapter PDF
Similar content being viewed by others
Keywords
5 References
Asmundsson, J., Rardin, R. L., Uzsoy, R. (2002): Tractable Nonlinear Capacity Models for Aggregate Production Planning, Working Paper, School of Industrial Engineering, Purdue University, West Lafayette.
Asmundsson, J., Rardin, R. L., Uzsoy, R. (2003): An Experimental Comparison of Linear Programming Models for Production Planning Utilizing Fixed Lead Time & Clearing Functions, Working Paper, School of Industrial Engineering, Purdue University, West Lafayette.
Buzacott, J. A., Shantikumar, J. G. (1993): Stochastic Models of Manufacturing Systems, Englewood Cliffs, New York.
Caramanis, M. C., Ahn, O. M. (1999): Dynamic Lead Time Modeling for JIT Production Planning, Proceedings of the IEEE International Conference on Robotics and Automation, Detroit, MI, May 10–15, v2, 1450–1455.
Chen, H., Harrison, M. J., Mandelbaum, A., van Ackere, A., Wein, L. M. (1988): Empirical Evaluation of a Queuing Network Model for Semiconductor Wafer Fabrication, Operations Research, 36(2): 202–215.
Ettl, M., Feigin, G. E., Lin, G. Y., Yao, D. D. (2000): A Supply Network Model with Base-Stock Control and Service Requirements, Operations Research, 48(2): 216–232.
Graves, S. (1986): A Tactical Planning Model for Job Shops, Operations Research, 34(4): 522–533.
Hackman, S. T., Leachman, R. C. (1989): A General Framework for Modeling Production, Management Science, 35(4): 478–495.
Karmarkar, U. S. (1987): Lot Sizes, Lead Times and In-Process Inventories, Management Science, 33(3): 409–418.
Karmarkar, U. S. (1989): Capacity Loading and Release Planning with Work-In-Process (WIP) and Lead Times, Journal of Manufacturing and Operations Management, 2(2): 105–123.
Karmarkar, U. S. (1993): Manufacturing Lead Times, Order Release and Capacity Loading, in: Graves, S., Rinnooy Kan, A., Zipkin, P. (eds.): Logistics of Production and Inventory, Handbooks in Operations Research and Management Science, Vol. 4, Amsterdam: p. 287–329.
Karmarkar, U. S., Kekre, S., Kekre, S. (1985): Lotsizing in Multi-Item Multi Machine Job Shops, IIE Transactions, 17(3): 290–297.
Lautenschläger, M. (1999): Mittelfristige Produktionsprogrammplanung mit auslastungsabhängigen Vorlaufzeiten (“Tactical Production Planning with Workload Dependent Forward Production Times”), PhD Thesis, TU Darmstadt.
Missbauer, H. (1998): Bestandsregelung als Basis für eine Neugestaltung von PPSSystemen (“Inventory Control as a Basis for a New Concept for PPS-Systems”), Physica, Heidelberg.
Spearman, M.L. (1991): An Analytic Congestion Model for Closed Production Systems with IFR Processing Times, Management Science, 37(8): 1015–1029.
Srinivasan, A., Carey, M., Morton, T. E. (1990): Resource Pricing and Aggregate Scheduling in Manufacturing Systems, Working Paper, GSIA, 1988 (Revised December 1990).
Suri, R., Sanders, J.L. (1993): Performance Evaluation of Production Networks, in: Graves, S., Rinnooy Kan, A., Zipkin, P. (eds.): Logistics of Production and Inventory, Handbooks in Operations Research and Management Science, Vol. 4, Amsterdam: p. 199–286.
Tatsiopoulos, I.P., Kingsman, B.G. (1983): Lead Time Management, European Journal of Operational Research, 14(4): 351–358.
Voß, S., Woodruff D.L. (2003): An Introduction to Computational Optimization Models for Production Planning in a Supply Chain, Springer, Berlin.
Zäpfel, G., Missbauer, H. (1993): New Concepts for Production Planning and Control, European Journal of Operational Research, 67(3): 297–320.
Zijm, W. H. M., Buitenhek, R. (1996): Capacity Planning and Lead Time Management, International Journal of Production Economics, 46–47: 165–179.
Zipkin, P. H. (1986): Models for Design and Control of Stochastic, Multi-Item Batch Production Systems, Operations Research, 34(1): 91–104.
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2005 Physica-Verlag Heidelberg
About this chapter
Cite this chapter
Pahl, J., Voß, S., Woodruff, D.L. (2005). Load Dependent Lead Times — From Empirical Evidence to Mathematical Modeling. In: Kotzab, H., Seuring, S., Müller, M., Reiner, G. (eds) Research Methodologies in Supply Chain Management. Physica-Verlag HD. https://doi.org/10.1007/3-7908-1636-1_35
Download citation
DOI: https://doi.org/10.1007/3-7908-1636-1_35
Publisher Name: Physica-Verlag HD
Print ISBN: 978-3-7908-1583-2
Online ISBN: 978-3-7908-1636-5
eBook Packages: Business and EconomicsBusiness and Management (R0)