For the construction of underground metro stations, there is a major concern about the influence of the resulting ground movements on the adjacent buildings, structures, pavements or paved roads, utilities etc. In general, during excavation, there is a change in state of stress and the orientation of principal planes. This change in state of stress often leads to induce vertical and lateral movements on the ground. As a result, the structures which are close to the excavation tends to rotate, distort, deform and even lead to damage also. Therefore, for the urban constructional works, the magnitude of the ground movements and the building movements should be within the tolerance limits. Many studies have been made about the building response due to excavation and tunneling. The vertical and horizontal ground movements on the adjacent buildings and structures can be estimated based on Boscardin and Cording (1989) and the limiting tensile strain induced on the adjacent buildings is calculated as suggested by Burland and Wroth (1974). Secant piles are used as the temporary retaining structure with internal horizontal struts for the construction of a shaft to lower or launch the tunnel boring machine (TBM). This paper presents the comparison of ground movement due to construction of Launching shaft in Bangalore Metro project from available analytical methods with numerical results using PLAXIS 2D. For the evaluation of ground movements near excavation, the buildings in the proximity of influence zone are only considered. The analytical and numerical results are further compared with the values recorded at site with the help of instrumentation installed in the adjacent buildings close to the excavation and in the retention systems of the launching shaft.

2 Description of Site

The launching shaft is located in the South of the Shivajinagar Station, which is one of the underground stations in Reach 6 of Bangalore Metro Phase II. The launching shaft is aligned to the south of Gottigere–Nagawara line. Secant piles are proposed and used as temporary earth retaining structures for the construction of the launching shaft. The construction of launching shaft is done by bottom-up method of construction. Struts are used as a support system to hold the secant pile walls. The depth of excavation is about 20 meters and that of water table is about 5 m below the existing ground level. Two buildings are very close to the excavation of launching shaft, which are named as B1 and B2. The strut layout plan of the launching shaft with the adjacent buildings is shown in Fig. 1.

Fig. 1
A 2D plane of the fitment of shafts illustrates highlighted corner points named I M 01, 02, and 03, shaft joints, the position of TBM lowering and marked strain gauges.

Plan of launching shaft with instruments

2.1 Details of the Buildings

The buildings B1 and B2, which are close to the launching shaft is located at 3m and 13m respectively from the edge of the secant piles. As seen from Fig. 2, both the buildings B1 and B2 are skewed to the edge of the excavation boundary. The general details of the building such as dimensions, height, number of floors, and foundation type are mentioned in Table 1. The details of the building are obtained from the building condition survey (BCS) reports.

Fig. 2
A top view plan of the site illustrates buildings 1 and 2, different B S M values and shaft placements layout with highlighted corner points, named I M 01, 02, and 03, with marked strain gauge portions.

Plan and orientation of adjacent buildings and the instrumentation

Table 1 Building details near to launching shaft

3 Ground Settlement Based on Analytical Approach

Ground movements can be computed by the principles given by Bowles (1990) and Clough & O’Rourke (1990) depending on the type of soil. Based on several case histories, Clough and O’Rourke (1990) suggested that the settlement profile is triangular for an excavation in sandy soil or stiff clay. The maximum ground surface settlement will occur just behind the wall. The non-dimensional profiles given in Fig. 3 shows that the corresponding settlement extends to about 2 and 3He for sandy soil and stiff to very hard clays, respectively where the influence depth for clayey soil is the depth of excavation plus the width of excavation. However, it shall be limited to 4 times the depth of excavation in the case of very soft soil for a large depth.

Fig. 3
Two right-angled triangles and b illustrate d over H subscript e as the base from 0 to 20 and 0 to 30, respectively, and delta subscript v by delta subscript v m as the height from 0 to 1. The hypotenuse of each triangle denotes the settlement envelope.

Dimensionless settlement envelope adjacent to excavation a sandy soil b stiff clays (Clough and O'Rourke, 1990)

As the excavation progresses, the lateral pressure imposed by the ground behind the wall would induce wall deflections into the excavation. This would result in vertical and lateral displacements of the ground adjacent to the retaining wall. In principle, the magnitude and extent of this ground movement is a function of the retention system type, the adopted construction methodology and the properties of the soil and/or rock materials. The depth of influence (He) is considered depending on the depth of the secant pile wall and depth of the excavation. The geology of Bangalore is predominantly mixed soil condition and mainly comprises mixtures of silty sand and clays with low to high plasticity and compressibility. The maximum deflection on the ground adjacent to secant pile due to excavation at launching shaft can be estimated with the deflection profile of secant pile. As the strata is generally mixed, the typical settlement profile just behind the secant pile wall is shown in Fig. 4.

Fig. 4
An illustration of a vertical wall below the ground surface points to the lateral wall deflection with respect to the excavation surface, the maximum ground surface settlement as delta subscript v m and the influence range as D.

Estimation of ground settlement (Bowles, 1986)

The ground settlement curve is taken as “second degree exponential curve” as suggested by Bowles (1986) where the maximum ground settlement occurs just behind the wall. Bowles (1986) suggested a procedure to estimate the excavation induced ground surface settlements using the following relations,

$$ \delta_v = \delta_{vm} \left( {\frac{l_x }{D}} \right)^2 $$
(1)

where \(\delta_v = {\text{ settlement at a distance of}}\,D - l_x\); \(\delta_{vm}\) = maximum ground surface settlement; \(l_x\) = Distance from a point at a distance D from the wall and \(D\) is the influence range of ground surface settlement.

The maximum ground surface settlement \(\delta_{vm}\), is estimated from the following equation,

$$ \delta_{vm} = \frac{2A}{D} $$
(2)

where \(A\) is the area of the lateral wall deflection. The lateral deflection of the secant pile wall is obtained using finite element software, PLAXIS 2D. For excavations which are close to the existing building and structures, differential settlement and angular distortion are the main factors causing damage to structures when the ground settles. The results of the differential settlement and angular distortion for buildings B1 and B2 based on analytical approach are presented in the subsequent section.

4 Numerical Modelling

Numerical analysis constantly proves to be an efficient tool in analyzing complex problems. Analyses are performed considering all the aspects such as construction methodology, foundations of the adjacent buildings and secant pile walls of the launching shaft. The general assumptions involved in any deep excavation problems holds good in this case also. The entire analysis is carried out using PLAXIS 2D with the available data. Soil layers are modelled as linearly elastic perfectly plastic model i.e., Mohr-Coulomb constitutive model to simulate the behavior. The secant piles and the adjacent buildings B1 and B2 are modelled as plate elements. The properties used for the soil layers are mentioned in Table 2. The material properties used for plate elements are mentioned in Table 3.

Table 2 Soil parameters used in the PLAXIS 2D
Table 3 Material properties for secant pile wall and buildings used in PLAXIS 2D

4.1 Analysis using PLAXIS 2D

As observed from Fig. 1, it is clearly evident that buildings B1 and B2 are skewed to the excavation of launching shaft. Therefore, to simulate behaviour of foundation of the buildings due to response of secant pile is a three-dimensional problem. However, in order to reduce the complexity, it is assumed that the building B1 is aligned perpendicular to the direction of the TBM launching. By doing so, it is easier to model both the building and secant piles in 2D itself. As the excavation is symmetrical, only half of the excavation is modelled in PLAXIS 2D to estimate the ground movements behind the secant pile wall. The cross sections considered for the PLAXIS 2D analysis is shown in Fig. 5.

Fig. 5
A top view plan of the site illustrates buildings 1 and 2, different B S M values and shaft placements layout with highlighted corner points, named I M 01, 02, and 03, with marked strain gauge portions.

Foundation layout for the buildings B1 & B2 Plan indicating cross-section considered for analysis

The entire excavation at Launching shaft location is simulated in the PLAXIS 2D based on stage wise construction sequence. The surcharge of the building and construction surcharge are also modelled before the commencement of excavation at launching shaft. Typical PLAXIS 2D model with soil, secant piles and building foundation with loads are shown in Figs. 6, 7.

Fig. 6
A model illustrates four shafts at the top to impact a vertical downward force on a shallow foundation. The left side has a secant pile with a depth of 27 meters attached to the ground with positive and negative charges.

Typical Excavation at Launching shafts near building B1

Fig. 7
A model illustrates eight shafts at the top to impact vertical downward forces on a deep foundation. The left side has a secant pile with a depth of 27 meters attached to the ground with positive and negative charges.

Typical Excavation at Launching shafts near building B2

In PLAXIS 2D, analysis is carried out up to final excavation of the launching shaft only. The backfilling sequence which is usually being done for any underground metro construction is not considered. This is due to the fact that the maximum deflection in the secant pile is encountered during excavation activity itself. The results of ground settlement behind the secant pile wall from PLAXIS 2D are presented in the next section.

5 Field Instrumentation Measurements

For any underground metro construction activity, instrumentation plays a major role in confirming the assumptions made in the design and also the predicted behaviour of the support system during excavation. Therefore, instruments like inclinometers (IM) and optical targets (OT) are installed on the secant piles at the launching shaft location which is already shown in Fig. 5. In a similar manner, certain instruments are installed on the ground and adjacent buildings and structures to monitor and verify the predicted behaviour. The instruments installed in site are provided with trigger levels to check the actual measured values. Mostly building settlement markers (BSM), tilt meter plate (TMP) and optical targets for buildings are used in monitoring the adjacent buildings whereas soil settlement markers (SSM) are placed on the ground and pavement markers (PM) are kept directly on the pavements. The detailed instrumentation plan near the launching shaft location is presented in Fig. 5.

Only limited number of instruments are considered for comparing the results with analytical and numerical methods as mentioned in Table 4.

Table 4 Data observed from Instruments located at site used for interpretation

The comparison between numerical, analytical results and site-measured data explained in detail in the next section.

6 Results and Discussion

The movements of secant pile wall deflection installed at site is recorded with the help of two inclinometers IM-01 and IM-02. The construction adopted in site is exactly simulated in PLAXIS 2D and the behaviour of the secant piles is obtained. The results of the instrumented data and numerical analysis is compared and shown in Fig. 8.

Fig. 8
A dot plot chart of pile elevation below ground level versus secant pile wall deflection plots two decreasing trends of numerical results and instrument data, starting from (26, 0), and intersecting at (45, negative 15). Values are approximate.

Comparison of Deflection Profile of Secant pile wall

From Fig. 8, it is clear that the predicted maximum deflection of secant pile is higher than the observed data which is actually recorded at site up to the final excavation level. The deflection recorded at site shows a similar trend to numerical results below 15 meters. But from the ground level to a depth of 15 m, the deflection observed in the site is higher than numerical results. The maximum deflection predicted from numerical analysis is 66 mm. However, the maximum deflection observed at site is 44 mm i.e., the maximum deflection predicted from numerical analysis is 33% higher than the actual observed value. This could be due to the support provided by the adjacent and opposite secant pile walls as the stress will be acting in three-dimensional directions. And also might be due to the water pressure on the retaining side of the secant pile wall. Hence, the deflection on the wall is comparatively higher in numerical analysis than observed instrumented data. The comparison of ground movement behind the wall obtained from numerical and analytical methods is shown in Fig. 9.

Fig. 9
A dot plot chart of the vertical settlement versus the distance from the boundary of a secant pile plots two increasing trends of numerical and analytical, starting from (0, negative 20), and (0, negative 28), respectively, and intersecting at (5, negative 22). Values are approximate.

Comparison of ground movement behind the secant pile wall

The results show that the maximum ground settlement predicted from analytical approach is 1% higher than the numerical results. However, the ground settlement profile remains identical beyond the distance of 10m from the wall. The ground settlement predicted from numerical results is higher than analytical approach from 6m beyond the wall. The initial variation in ground settlement obtained from the numerical analysis is due to the interaction between soil and the secant pile wall and might be due to the strut installation during excavation. Similarly, the building settlement markers, installed at site observed the settlements of the building during excavation is shown in Tables 5, 6.

Table 5 Comparison of ground movements for building B1
Table 6 Comparison of ground movements for building B2

From Tables 5 and 6, it is clear that settlements observed at site is much lesser than settlements predicted from numerical and analytical analysis. This might be due to conservative use of soil parameters in the design. The negative values indicate that instead of settlement, heaving has occurred at some locations of the buildings. This indicates that the building is trying to rotate but the results of tilt meter plates installed at those buildings shows no rotation at all during the excavation. From this, a conclusion can be drawn that either tilt meter plate is insensitive to capture the movement or the people who are living there might have disturbed the settlement markers 4, 7, 14 and BSM 15. The results of the building rotation from the numerical, analytical and tilt meter are shown in Table 7.

Table 7 Results of Building rotation for Building B1 and B2

From Table 7, it is understood that numerical analysis gives higher values than analytical method. It is due to the fact that ground settlement is predicted higher in numerical analysis hence consequently the rotation predicted will be higher in case of numerical analysis than analytical method. However, the instruments TMP 3 and TMP 6 show that there is no rotation for the building B1 and for building B2. The safety of the building is ensured in a way that excavation being done in a controlled manner and at every stage.

7 Summary

Results of the numerical analysis and instrumented data shows that the deflection of the secant pile predicted from PLAXIS 2D is 33% higher than the deflection observed during excavation. The probable reason might be the support provided by the secant piles in opposite sides as the stress around the secant piles will be acting in three-dimensional directions. This might be due to water level at site during excavation is lesser than what was considered during design stage. The higher the water pressure, the higher the active force on the wall, which in turn increases the wall deflection from numerical analysis. Similarly, when the wall deflection is high, the ground settlements will also be high. The ground settlement predicted from analytical approach is approximately 1% higher than numerical analysis. In addition, the ground settlement from PLAXIS 2D is higher than analytical approach beyond 6 m from the wall boundary. However, the actual settlement markers installed on the buildings shows minimal amount of settlement observed during excavation. This is due to the fact that construction carried is out in a controlled manner and observations are monitored throughout the excavation phase. However, some settlement markers indicate heaving which shows that buildings try to rotate. Even the results from PLAXIS 2D and analytical approach indicates rotation may happen. However, the tilt meters installed on the buildings shows no rotation. This confirms that the excavation is carried out in a safe and progressive manner. The assumptions considered during design stage are conservative and the results predicted from numerical and analytical results are much higher than the instruments recorded at site.