Introduction

Beryllium–aluminium (Be–Al) alloys, has many excellent properties such as lightweight, high specific stiffness and good thermal stability, and it is estimated to be the next-generation aerial and aerospace structures materials.1,2 Currently the investment casting process, which could produce fine casts with little or no machining, is the preferred method of producing Be–Al alloys. However, due to large freezing range, high latent heat of fusion, and low capability of heat diffusion, shrinkage cavity and porosity occur frequently in Be–Al alloy castings.3,4 Therefore, how to select the appropriate casting process and technological parameters to produce high quality Be–Al alloy castings is a problem to overcome.

Be–Al alloys are expensive and also toxic, which limits the experimental research. In recent years, with the advancements of computer technology, numerical modeling and simulation have been widely used as a powerful tool to make a description of the solidification process.5,6,7,8 Many researchers have investigated the solidification process using commercially available casting simulation software. It can be used to design a casting process using less energy and can predict how to reduce defects of cast products. It is also helpful to shorten the trial period and reduce the producing cost.9,10,11,12,13,14,15,16

In this study, a commercially available process simulation software,12,13,14,15,16,17 ProCAST, was employed to investigate the investment casting process of a bracket casting of Be–38 wt%Al alloy. Flow field and temperature field during filling and solidification process were simulated, and the formation of shrinkage porosity was predicted. To validate the simulated results, the actual casting experiments were carried out and the defects appearing in casting parts was also analyzed. Finally, the casting process parameters were redesigned and optimized based on the numerical simulation.

Experimental Procedures

Mathematical Model

In this study, the flow of liquid metal is assumed to be incompressible Newtonian fluid and the governing equations.10,14 Heat transfer equation, Continuity equation and Navier–stokes equation, at the filling and solidification stages were numerically solved by ProCAST software.17 Niyama criterion, which is the most widely used criterion function of metal casting, was utilized to predict the shrinkage porosity in this study. The Niyama criterion, Ny, is a local thermal parameter defined as follows:11,15

$$ {\text{Ny}} = \frac{G}{({v_{\rm c}})^{1/2}}$$
(1)

where G is temperature gradient, and vc is cooling rate.

Geometric Model and Parameters Setting of Simulation

The three-dimensional model of the bracket casting of Be–Al alloys was designed by UG software, as shown in Figure 1. Three-dimensional size of the bracket is 142 mm × 100 mm × 145 mm, and wall thickness of the casting changes from about 7 to 18 mm. The model was imported into the finite-element-based simulation software, which was used to simulate filling and solidification process of the investment casting. It contains 44,172 nodes and 162,747 elements. The nominal composition of actual casting material was Be–38 wt%Al and the ceramic mold material was mainly zircon sand. Thermophysical parameters of Be–Al alloys and ceramic mold material required in the simulation are listed in Table 1, which was obtained from the literature1,2,3,4 and material database of ProCAST. In addition, reverse technology was employed to obtain thermophysical parameters of the Be–Al alloys at high temperature, and the technical details of the reverse technology can be seen in Reference 18. The heat transfer coefficient of casting/shell, shell/gas environment was set as 1000 W/(m2·K), 50 W/(m2·K), respectively.

Figure 1
figure 1

Three-dimensional model of the bracket casting of Be–Al alloys.

Table 1 Thermophysical Parameters of Alloy and Mold Material

The Actual Casting Experiments

Investment casting process of Be–Al alloys includes pattern manufacturing, ceramic shell building, pattern removal, pouring and finishing. The polystyrene (PS) pattern was produced by selective laser sintering (SLS), which is an additive manufacturing method that uses a powder bed fusion process to build 3D parts, as shown in Figure 2. The AFS 450 SLS sintering system (equipped with 50 W CO2 Laser) used in the experiment was made by Beijing longyuan Automated Fabrication System Co., Ltd. in China. Polystyrene powders with a range of particle sizes from 50 to 97 μm were used as SLS material. Sintering parameters of the PS powder are listed in Table 2. The SLS pattern was reinforced by infiltrating with wax and the obtained pattern which mainly consists of plastic and wax was used for the ceramic shell building.

Figure 2
figure 2

The PS pattern was produced by additive manufacturing method. (a) SLS sintering system and (b) PS pattern.

Table 2 Sintering Parameters of the PS Powder

The pattern was coated with ceramic layer through dipping into refractory slurry and stuccoed with coarse sand followed with drying. Zircon sand (particle size 150 μm) was used as the stuccoing material of surface layer and mullite sand (particle size 250–500 μm) was used as the stuccoing material of back layer. The refractory slurry was prepared in accordance with the order of zirconium sol → additives → ZrO2 powder, and the stirring speed was controlled at 30–50 rpm/min. The slurry was obtained with the viscosity of about 30–40 s and the suspension rate of approximately 80%. The next layers of ceramic mold were prepared in a similar manner. Six ceramic layers were produced and the thickness of the ceramic shell was approximately 10 mm. The time for drying between each layer was 24 h. The wax materials in the pattern was removed at 150 °C for 30 min via autoclave dewaxing, and the remaining pattern material was removed during the initial preheating of the ceramic shell mold. The obtained ceramic shell mold was preheated for 30 min at 300 °C to remove moisture and to burn off residual pattern material, baked for 4 h at 900 °C to sinter the ceramic, then cooled to room temperature in the furnace. The residual ash was cleaned with hot water. To discharge the gas from the cavity and avoid the shrinkage porosity, a dozen vent holes with the diameter of 5 mm were set at top of shell during the ceramic shell building. Ceramic shell mold and the position of the vent holes are shown in Figure 3.

Figure 3
figure 3

Ceramic shell mold and the position of vent holes.

The actual pouring experiment was carried out using 30 kg vacuum induction melting furnace. The ceramic shell mold was placed in the heating chamber of the furnace and preheated at the temperature of 600 °C. Be–38 wt%Al alloy was melted at 1320 °C for 15 min, and the vacuum was 0.8 Pa. The pouring temperature of molten metal was about 1250 °C, and the filling time was 6–8 s. When the pouring of the liquid metal was finished, the ceramic shell mold was withdrawn from the heating chamber to the cooling chamber of the furnace, which was about 40 °C. Finally, the ceramic shell mold was broken with a pneumatic hammer to get casting products after cooling. The pouring experiments were repeated twice under the same parameter to ensure the accuracy of the experimental results.

Results and Discussion

Figure 4 shows the simulation results of filling processes of the Be–Al alloy casting. It indicates the positions of the molten metal front in the cavity at different filling time. It clearly shows that the liquid metal flows through the sprue and runner system and into the cavity of the casting. When the filling time is 1.5 s, the liquid metal reaches the bottom of the cavity with a temperature of about 940 °C. When the filling time is 3.1 s, the cavity is 50% filled. When the filling time is 6.5 s, the cavity is fully filled. It is found that the filling process is smooth and the design of gating system is reasonable.

Figure 4
figure 4

The evolution of the filling state at different times.

Once the mold cavity is completely filled, solidification simulation is followed. The simulated results can explore the reasons how shrinkage porosity defects formed. Figure 5 shows the temperature field during different solidification states, and Figure 6 shows solidification time of different position of the casting. Several locations (P1–P4) were selected to investigate the temperature distribution and variation at different locations in the casting, as shown in Figure 6. Figure 7 shows the cooling curves of the selected locations inside the casting during solidification process. It can be that the thin wall position (P3) of the casting cool faster than other parts, and shrinkage porosity defects may be formed between P2 and P4 because the feeding paths are cut off. Figure 8 shows the predicted shrinkage porosity of the casting. It shows that shrinkage porosity defects may be formed at the location below the riser besides the lower part of the casting. Figure 9 shows the shrinkage defects below the risers after the risers were cut off, which agrees well with the predicted shrinkage porosity below the risers (P6–P9) in Figure 8.

Figure 5
figure 5

Temperature field during solidification.

Figure 6
figure 6

Solidification time of different position of the casting.

Figure 7
figure 7

The temperature change curves at different locations inside the casting during casting. (P1–P4 are different locations selected to investigate the temperature distribution and variation).

Figure 8
figure 8

The predicted shrinkage defects.

Figure 9
figure 9

Shrinkage defects existed below the risers in the Be–Al alloy casting.

To investigate the shrinkage porosity distributed in the casting, samples were taken from the Be–Al alloy casting and detected by micro computed tomography (micro-CT). The sample size was 39 mm×5 mm×1 mm, and the total material volume was 195 mm3. Radiographic images were acquired at spatial resolution of 5 μm and reconstructed by VGStudio Max® 2.0 software. 3D characterization and distribution of the shrinkage porosity in the samples were obtained. Optical images were recorded on an Olympus (DSX-500) optical microscope. Figure 10 displays the shrinkage porosity and microstructure of the sample taken from the position where the shrinkage porosity is predicted (P5 in Figure 8). It can be seen that shrinkage porosity defects exist around the thin wall position of the Be–Al alloy casting. The experimental and analytical results show that total volume of the shrinkage porosity in Figure 10b is about 19.75 mm3 and the shrinkage porosity fraction of the sample is 10.13%. Maximum volume of the shrinkage porosity is about 6.26 mm3. The simulated result for the shrinkage porosity defects is in good agreement with the actual industrial castings.

Figure 10
figure 10

Solidified structure of Be–38 wt%Al alloy. (a) 2D slice and (b) 3D view of shrinkage porosity, (c) microstructure observed by OM.

Due to large freezing range of Be–Al alloys, shrinkage porosity occurs frequently in Be–Al alloy castings and it is difficult to be prevented by realizing sequential solidification. Increasing cooling rate during solidification is beneficial to refine the grain structure and improve the density of the alloys, and it can be useful to enhance the feeding capacity of liquid metal because the growth of dendrite can be inhibited. The shrinkage porosity in Be–Al alloy casting is probably decreased by controlling the cooling rate of liquid metal. To prevent the shrinkage porosity defects, the casting technology was optimized according to the above analysis. The detailed optimizing technical methods include improving feeding ability by increasing the pouring temperature, refining the grain structure by increasing the cooling rate of liquid metal in solidification. In this work, appropriate reduction of the shell preheat temperature was done to increase the cooling rate of the liquid metal. The optimum parameters of investment casting process of Be–38 wt%Al alloy were chosen based on the simulation, which were with ceramic shell preheat temperature of 500 °C and pouring temperature of 1300 °C. Meanwhile, the casting after pouring was cooled using liquid nitrogen in the cooling chamber of the furnace. Figure 11 shows the simulated result of shrinkage porosity defects with the optimized processing parameters. Figure 12 displays the shrinkage porosity and microstructure of the sample taken from the casting in the same position as shown in Figure 10 with the optimum parameters. The experimental and analytical results show that total volume of the shrinkage porosity is about 5.56 mm3 and the shrinkage porosity fraction of the sample is 2.85%, and maximum volume of the shrinkage porosity is 1.32 mm3. The experimental and simulated results show that the optimized processing parameters can reduce the shrinkage porosity in the casting, and it was confirmed by the actual production testing.

Figure 11
figure 11

The predicted shrinkage defects with optimized processing parameters.

Figure 12
figure 12

Solidified structure of Be–38 wt%Al alloy with the optimum parameters. (a) 2D slice and (b) 3D view of shrinkage porosity, (c) microstructure observed by OM.

Conclusions

The numerical simulation of vacuum investment casting of Be–38 wt%Al alloy was carried out using the finite element method. The flow field and temperature field as well as the formation of shrinkage porosity were simulated. The actual casting experiments were carried out and the shrinkage porosity appeared in casting parts was analyzed. The main conclusions are as follows:

  1. 1.

    Simulated results of positions of the molten metal front in the cavity at different filling time have revealed that the filling process is smooth and the preliminary design of gating system is reasonable. When the filling time is 3.1 s, the cavity is 50% filled. When the filling time is 6.5 s, the cavity is fully filled. The whole filling time of the casting is 6.5 s.

  2. 2.

    The formation of shrinkage porosity defects of the Be–Al alloy casting was predicted. Microstructure and shrinkage porosity of the casting were analyzed using OM and micro-CT. The simulated results are in good agreement with the experimental results.

  3. 3.

    The optimum parameters of vacuum investment casting of Be–38 wt%Al alloy can be obtained according to the simulation results, which are with ceramic shell preheat temperature of 500 °C and pouring temperature of 1300 °C.