Abstract
We study the computational complexities of three problems on multi-agent scheduling on a single machine. Among the three problems, the computational complexities of the first two problems were still open and the last problem was shown to be unary NP-hard in the literature. We show in this paper that the first two problems are unary NP-hard. We also show that the unary NP-hardness proof for the last problem in the literature is invalid, and so, the exact complexity of the problem is still open.
Avoid common mistakes on your manuscript.
1 Introduction
In the multi-agent scheduling, we have a set of n jobs \(\mathcal{J}=\{J_1, J_2, \cdots , J_n\}\) and m agents \(R_1, R_2, \cdots , R_m\). Each agent \(R_i\) has its set of jobs \(\mathcal{J}^{(i)}\subseteq \mathcal{J}\). We usually assume that \(\mathcal{J}=\bigcup _{1\leqslant i\leqslant m}\mathcal{J}^{(i)}\). Two typical models, called competing agents and non-disjoint agents, were studied in this paper.
In the model of competing agents, we assume that \(\mathcal{J}^{(i)}\cap \mathcal{J}^{(i')} = \varnothing \) for every two distinct agents \(R_i\) and \(R_{i'}\). Then the single-machine scheduling problem with competing agents is generally denoted by \(1|\text{ CO },~\beta |\gamma \), where CO indicates the model of competing agents.
In the model of non-disjoint agents, we assume that, for every two distinct agents \(R_i\) and \(R_{i'}\), the relation \(\mathcal{J}^{(i)}\cap \mathcal{J}^{(i')} = \varnothing \) is not required. Then the single-machine scheduling problem with non-disjoint agents is generally denoted by \(1|\text{ ND },~\beta |\gamma \), where ND indicates the model of non-disjoint agents.
The following notations and terminologies were used in this paper:
-
\(n_i= |\mathcal{J}^{(i)}|\) is the number of jobs of agent \(R_i\).
-
\(p_j\geqslant 0\) is the processing time of job \(J_j\).
-
\(d_j^{(i)}\) is the due date of job \(J_j\) with respect to agent \(R_i\) if \(J_j\in \mathcal{J}^{(i)}\). The due dates are called job-dependent if \(d_j^{(i)}= d_j\) for each job \(J_j\) and each agent \(R_i\) with \(J_j\in \mathcal{J}^{(i)}\).
-
\(w_j^{(i)}\geqslant 0\) is the weight of job \(J_j\) with respect to agent \(R_i\) if \(J_j\in \mathcal{J}^{(i)}\). The weights are called job-dependent if \(w_j^{(i)}= w_j\) for each job \(J_j\) and each agent \(R_i\) with \(J_j\in \mathcal{J}^{(i)}\).
-
\(S_j(\sigma )\) is the starting time of job \(J_j\) in schedule \(\sigma \).
-
\(C_j(\sigma )= S_j(\sigma )+p_j\) is the completion time of job \(J_j\) in schedule \(\sigma \).
-
\(L_j^{(i)} (\sigma ) = C_j(\sigma )-d_j^{(i)}\) is the lateness of job \(J_j\) with respect to agent \(R_i\) in schedule \(\sigma \) if \(J_j\in \mathcal{J}^{(i)}\).
-
\(T_j^{(i)} (\sigma ) =\max \{0, L_j^{(i)} (\sigma ) \}\) is the tardiness of job \(J_j\) with respect to agent \(R_i\) in schedule \(\sigma \) if \(J_j\in \mathcal{J}^{(i)}\).
-
In a schedule \(\sigma \), job \(J_j\in \mathcal{J}^{(i)}\) is called tardy with respect to agent \(R_i\) if \(C_j(\sigma ) >d_j^{(i)}\), and is called on time with respect to agent \(R_i\) if \(C_j(\sigma )\leqslant d_j^{(i)}\). Moreover, we define \(U_j^{(i)} (\sigma ) =1\) if \(J_j\) is tardy with respect to agent \(R_i\), and define \(U_j^{(i)} (\sigma ) =0\) if \(J_j\) is on time with respect to agent \(R_i\).
-
\(L_{\max }^{(i)}(\sigma )= \max \{L_j(\sigma ): J_j\in \mathcal{J}^{(i)}\}\) is the maximum lateness of agent \(R_i\) under schedule \(\sigma \).
-
\(\sum _{J_j\in \mathcal{J}^{(i)}} U_j^{(i)}(\sigma )\) is the number of tardy jobs of agent \(R_i\) under schedule \(\sigma \).
-
\(\alpha _1, \alpha _2, \cdots , \alpha _m\) are m non-negative numbers indicating weights of objective functions of the m agents \(R_1, R_2, \cdots , R_m\), respectively.
The following five problems were studied in this paper:
Problem 1.1
\(1|\text{ CO }|\sum _{i=1}^{m} \alpha _i (L_{\max }^{(i)})\), where m is not fixed.
Problem 1.2
\(1|\text{ ND },~d_j^{(i)}=d_j,~ \sum _{J_j\in \mathcal{J}^{(i)}} U_j^{(i)} \leqslant Q_i,~2\leqslant i\leqslant m| \sum U_j^{(1)}\), where m is not fixed.
Problem 1.3
\(1|\text{ CO },~\sum _{J_j\in \mathcal{J}^{(2)}} w_j^{(2)}C_j\leqslant Q|\sum _{J_j\in \mathcal{J}^{(1)}} w_j^{(1)}C_j\).
Problem 1.4
\(1|\text{ ND },~d_j^{(i)}=d_j | \max _{1\leqslant i\leqslant m} \sum _{J_j\in \mathcal{J}^{(i)}} U^{(i)}_j\), where m is not fixed.
Problem 1.5
\(1|\text{ ND },~p_j=1,~ d^{(i)}_j=d |\sum _{J_j\in \mathcal{J}^{(i)}} U^{(i)}_j\leqslant 1, ~1\leqslant i\leqslant m\), where m is not fixed.
Note that Problem 1.5 is a very special case of the decision versions of both Problems 1.2 and 1.4. Then the unary NP-completeness of Problem 1.5 implies the unary NP-hardness of Problems 1.2 and 1.4.
The multi-agent scheduling was first introduced by Agnetis et al. [1] and Baker and Smith [2]. Till now the multi-agent scheduling has been extensively studied. Developments of the research for multi-agent scheduling were summarized in Agnetis et al. [3].
In Agnetis et al. [3], the computational complexities of Problems 1.1 and 1.2 were still open, and Problem 1.3 was shown to be unary NP-hard. We show in this paper that Problems 1.1 and 1.2 are unary NP-hard and the unary NP-hardness proof for Problem 1.3 in Agnetis et al. [3] is invalid. Note that the binary NP-hardness of problem \(1|\text{ CO },~\sum _{J_j\in \mathcal{J}^{(2)}} C_j\leqslant Q|\sum _{J_j\in \mathcal{J}^{(1)}} C_j\) provided in Agnetis et al. [1] implies that Problem 1.3 is at least binary NP-hard. Then the exact complexity (unary NP-hard or pseudo-polynomial-time solvability) of Problem 1.3 is still open.
This paper is organized as follows: In Sect. 2, we show that Problem 1.1 is unary NP-hard. In Sect. 3, we show that Problem 1.5 is unary NP-complete, and as a consequence, both Problem 1.2 and Problem 1.4 are unary NP-hard even when \(p_j=1\) and \(d^{(i)}_j=d\) for all jobs \(J_j\) and all agents \(R_i\). In Sect. 4, we show that the unary NP-hardness proof for Problem 1.3 in Agnetis et al. [3] is invalid.
2 Problem 1.1
Theorem 2.1
Problem 1.1 is unary NP-hard.
Proof
Note that Problem 1.1 is given by \(1|\text{ CO }|\sum _{i=1}^{m} \alpha _i (L_{\max }^{(i)})\), where m is not fixed. Lawler [4] showed that the classical scheduling problem \(1||\sum w_jT_j\) is unary NP-hard. Then we use problem \(1||\sum w_jT_j\) for the reduction.
Let \(\{J_1, J_2, \cdots , J_n\}\) be an instance of problem \(1||\sum w_jT_j\) in which each job \(J_j\) has a processing time \(p_j\geqslant 0\), a due date \(d_j\) and a weight \(w_j\geqslant 0\). We construct an instance of Problem 1.1 as follows:
-
There are \(m=n\) agents \(R_i\), \(1\leqslant i\leqslant n\), and 2n jobs \(\{J_1, J_2, \cdots , J_{2n}\}\), where \(J_1, J_2, \cdots , J_n\) are the n jobs in the instance of problem \(1||\sum w_jT_j\), and \(J_{n+1}, J_{n+2}, \cdots , J_{2n}\) are n newly added jobs.
-
For each agent \(R_i\) with \(1\leqslant i\leqslant n\), we define \(\mathcal{J}^{(i)}=\{ J_i, J_{n+i}\}\), where \(p_{n+i}=0\) and \(d_{n+i}=0\).
-
The coefficients \(\alpha _1, \alpha _2, \cdots , \alpha _n\) are given by \(\alpha _i=w_i\), \(1\leqslant i\leqslant n\).
The above construction can be done in polynomial time under the unary encoding. Note that each job in \(\{J_{n+1}, J_{n+2}, \cdots , J_{2n}\}\) has a processing time 0. Then we only need to consider the desired schedules of the constructed instance of Problem 1.1 in which all the jobs in \(\{J_{n+1}, J_{n+2}, \cdots , J_{2n}\}\) start at time 0. It follows that the schedules of \(\{J_1, J_2, \cdots , J_n\}\) one-one correspond to the desired schedules of \(\{J_1, J_2, \cdots , J_{2n}\}\).
Let \(\sigma \) be a schedule of \(\{J_1, J_2, \cdots , J_n\}\) and let \(\sigma '\) be the corresponding desired schedule of \(\{J_1, J_2, \cdots , J_{2n}\}\). Then \(\sigma '\) can be obtained from \(\sigma \) by scheduling all the jobs in \(\{J_{n+1}, J_{n+2}, \cdots , J_{2n}\}\) starting at time 0. Since each job \(J_j\) in \(\{J_{n+1}, J_{n+2}, \cdots , J_{2n}\}\) has \(p_j=0\) and \(d_j=0\), we have \(C_j(\sigma ') =0\), and so \(L_j(\sigma ') =0\) for \(j= n+1, n+2, \cdots , 2n\). This further implies that, for each \(j\in \{1, 2,\cdots , n\}\), \(C_j(\sigma ') =C_j(\sigma )\), and so \(L_j(\sigma ') =L_j(\sigma )\).
Now, for each agent \(R_i\) with \(1\leqslant i\leqslant n\), we have \(L_{\max }^{(i)} (\sigma ') =\max \{ L_i(\sigma '), L_{n+i}(\sigma ')\} =\max \{ L_i(\sigma ), 0\} =T_i(\sigma )\). Then we have \(\sum _{i=1}^n \alpha _iL_{\max }^{(i)} (\sigma ') =\sum _{i=1}^n \alpha _iT_i(\sigma )= \sum _{j=1}^n w _jT_j(\sigma )\). Consequently, \(\sigma \) is an optimal schedule of problem \(1||\sum w_jT_j\) on the jobs set \(\{J_1, J_2, \cdots , J_n\}\) if and only if \(\sigma '\) is an optimal schedule of problem \(1|\text{ CO }|\sum _{i=1}^{m} \alpha _i (L_{\max }^{(i)})\) on the job set \(\{J_1, J_2, \cdots , J_{2n}\}\). It follows that Problem 1.1 is unary NP-hard.
3 Problems 1.2, 1.4, and 1.5
Theorem 3.1
Problem 1.5 is unary NP-complete.
Proof
Note that Problem 1.5 is given by \(1|\text{ ND },~p_j=1,~ d^{(i)}_j=d |\sum _{J_j\in \mathcal{J}^{(i)}} U^{(i)}_j\leqslant 1, ~1\leqslant i\leqslant m\), where m is not fixed. We use the unary NP-complete independent set problem of graphs (Garey and Johnson [5]) for the reduction.
Suppose we are given an instance of the independent set problem of graphs, which inputs a graph G and a positive integer k and asks whether there is an independent set K in G such that \(|K|\geqslant k\). Let V(G) and E(G) be the sets of vertices and edges of G, respectively. We write \(V(e)=\{x, y\}\) if \(e=xy\) is an edge of G. We construct an instance of Problem 1.5 as follows:
-
\(n=|V(G)|\) jobs \(J_v\), \(v\in V(G)\), with each vertex \(v\in V\) corresponding to a job \(J_v\).
-
\(m=|E(G)|\) agents \(R_e\), \(e\in E(G)\), with each edge \(e\in E\) corresponding to an agent \(R_e\).
-
The set of jobs of agent \(R_e\) is given by \(\mathcal{J}^{(e)} = \{v\in V(G): v { is} { an} { end} { vertex} { of} e\}\).
-
The precessing times are defined by \(p_v=1\) for all \(v\in V(G)\).
-
The due dates are defined by \(d^{(e)}_v =d=n-k\) for \(v\in V(e)\) and \(e\in E(G)\).
-
The decision is whether there exists a schedule \(\pi \) such that \(\sum _{v\in V(e)} U^{(e)}_v (\pi ) \leqslant 1\) for every agent \(R_e\), \(e\in E\), or equivalently, \(\max _{e\in E} \sum _{v\in V(e)} U^{(e)}_v (\pi ) \leqslant 1.\)
The above construction can be done in polynomial time under the unary encoding. To prove the unary NP-completeness result, we only need to show in the following that the graph G has an independent set K with \(|K|\geqslant k\) if and only if the scheduling instance has a schedule \(\pi \) such that \(\max _{e\in E} \sum _{v\in V(e)} U^{(e)}_v (\pi ) \leqslant 1.\)
If the graph G has an independent set K with \(|K|\geqslant k\), then \(T\subseteq K\) be a set such that \(|T|=k\). Let \(\pi \) be a schedule such that the jobs \(J_u\), \(u\in V(G)\setminus T\), are processed before the jobs \(J_v\), \(v\in T\). Since \(d= n-k\) and \(p_u=1\) for all jobs \(J_u\), all the jobs in \(\{J_u: u\in V(G)\setminus T\}\) are on time in \(\pi \) and all jobs in \(\{J_u: u\in T\}\) are tardy in \(\pi \). Since T is an independent set of G, for each edge \(e=xy\in E(G)\), we have \(|\{x,y\} \cap T| \leqslant 1\). This implies that \(\sum _{v\in V(e)} U^{(e)}_v (\pi ) \leqslant 1\) for every edge \(e\in E(G)\). Consequently, \(\max _{e\in E} \sum _{v\in V(e)} U^{(e)}_v (\pi ) \leqslant 1.\)
Conversely, suppose that \(\pi \) is a schedule such that \(\max _{e\in E} \sum _{v\in V(e)} U^{(e)}_v (\pi ) \leqslant 1.\) Let \(T=\{ x\in V(G): C_x(\pi )> n-k\}\). Then, \(|T| =k\). Hence, we are left to prove that T is an independent set of G.
Suppose to the contrary that T is not an independent set in G. Then there are two vertices \(x,y\in T\) and an edge \(e\in E(G)\) such that \(xy\in E(G)\). Since \(C_x(\pi ), C_y(\pi ) >n-k=d\), both \(J_x\) and \(J_y\) are tardy in \(\pi \). Then we have \(\sum _{v\in V(e)} U^{(e))}_v(\pi ) =2\). This contradicts the assumption that \(\max _{e\in E} \sum _{v\in V} U^{(e)}_v(\pi ) \leqslant 1.\) The result follows.
Corollary 3.2
Both Problems 1.2 and 1.4 are unary NP-hard even when \(p_j=1\) and \(d^{(i)}_j=d\) for all jobs \(J_j\) and all agents \(R_i\).
4 Problem 1.3
Note that Problem 1.3 is given by \(1|\text{ CO },~\sum _{J_j\in \mathcal{J}^{(2)}} w_j^{(2)}C_j\leqslant Q|\sum _{J_j\in \mathcal{J}^{(1)}} w_j^{(1)}C_j\). In the following, we adopt the notations in Agnetis et al. [3]. Then Problem 1.3 is written as \(1|\text{ CO },~\sum w_j^{B}C^B_j\leqslant Q|\sum w_j^{A}C^A_j\).
In Agnetis et al. [3], the unary NP-hardness of Problem 1.3 was proved by using the unary NP-complete 3-Partition problem (Garey and Johnson [5]) for the reduction.
3-Partition: Given a set of 3r positive integers \(\{a_1, a_2,\cdots , a_{3r}\}\) and a positive integer E such that \(\sum ^{3r}_{j=1}a_j =tE\) and \(E/4 < a_j < E/2\) for each j with \(1\leqslant j\leqslant 3r\), does there exists a partition \((I_1, I_2, \cdots , I_r)\) of the index set \(\{1,2,\cdots , 3r\}\), such that \(|I_i|=3\) and \(\sum _{j\in I_i}a_j=E\) for each i with \(1\leqslant i\leqslant r\)?
Given an instance \(\mathcal{I}=(a_1, a_2, \cdots , a_{3r}; E)\) of 3-Partition, Agnetis et al. [3] constructed an instance \(\mathcal{I}'\) of the decision version of Problem 1.3 by the following way:
-
Set \(\mathcal{J}^A\) consists 3r jobs \(J_1^A, J_2^A, \cdots , J_{3r}^A\) with \(p_i^A=w_i^A =a_i\), \(1\leqslant i\leqslant 3r\).
-
Set \(\mathcal{J}^B\) consists r jobs \(J_1^B, J_2^B, \cdots , J_{r}^B\) with \(p_j^B=E\) and \(w_j^B =E^{3(r-j)}\), \(1\leqslant j\leqslant r\).
-
\(Y_A= \sum _{1\leqslant i\leqslant j\leqslant 3r}a_ia_j +\frac{r(r-1)}{2} E^2\).
-
\(Y_B = \sum _{j=1}^r (2j-1)E^{3(r-j)+1}\).
-
The decision asks whether there is a desired schedule \(\sigma \) such that \(\sum _{1\leqslant i\leqslant 3r}w_i^AC_i^A(\sigma ) \leqslant Y_A\) and \(\sum _{1\leqslant j\leqslant r} w_j^BC_j^B(\sigma ) \leqslant Y_B\).
Then the authors showed that the instance \(\mathcal{I}\) of 3-Partition has a solution if and only if the scheduling instance \(\mathcal{I}'\) has a desired schedule. After this, the authors claimed that Problem 1.3 is unary NP-hard.
In fact, such proof is invalid. The flaw in the proof is that the instance reduction cannot be realized in a polynomial time under unary encoding.
Note that the size of the instance of 3-Partition under unary encoding is given by \(\text{ size }(\mathcal{I})= O(a_1+a_2+\cdots +a_{3r}+ E) = O((3r+1)E) =O(rE)\). Alternatively, the size of the scheduling instance under unary encoding is given by \(\text{ size }(\mathcal{I}')\geqslant \sum _{1\leqslant i\leqslant 3r}(p_i^A+w_i^A) + \sum _{1\leqslant j\leqslant r}(p_j^B+w_j^B) +Y_A +Y_B > E^r\). Clearly, \(\text{ size }(\mathcal{I}')>E^r\) cannot be bounded by a polynomial of \(\text{ size }(\mathcal{I})= O(rE)\). It follows that the instance reduction established as above is not a polynomial reduction under unary encoding. Then we conclude that the unary NP-hardness proof for Problem 1.3 in Agnetis et al. [3] is invalid.
Note that the binary NP-hardness of problem \(1|\text{ CO },~\sum _{J_j\in \mathcal{J}^{(2)}} C_j\leqslant Q|\sum _{J_j\in \mathcal{J}^{(1)}} C_j\) provided in Agnetis et al. [1] implies that Problem 1.3 is at least binary NP-hard. Then the exact complexity (unary NP-hard or pseudo-polynomial-time solvability) of Problem 1.3 is still open.
References
Agnetis, A., Mirchandani, P.B., Pacciarelli, D., Pacifici, A.: Scheduling problems with two competing agents. Oper. Res. 52, 229–242 (2004)
Baker, K.R., Smith, J.C.: A multiple-criterion model for machine scheduling. J. Sched. 6, 7–16 (2003)
Agnetis, A., Billaut, J.C., Gawiejnowicz, S., Pacciarelli, D., Soukhal, A.: Multiagent Scheduling—Models and Algorithms. Springer, Berlin (2014)
Lawler, E.L.: A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness. Ann. Discret. Math. 1, 331–342 (1977)
Garey, M.R., Johnson, D.S.: Computers and Intractability: A Guide to the Theory of NP-Completeness. Freeman, San Francisco (1979)
Acknowledgments
We would like to thank the anonymous referee for his(her) constructive comments and kind suggestions.
Author information
Authors and Affiliations
Corresponding author
Additional information
This research was supported by the National Natural Science Foundation of China (Nos. 11271338 and 71301038), and the National Natural Science Foundation of Henan Province (No. 15IRTSTHN006).
Rights and permissions
About this article
Cite this article
Yuan, JJ. Complexities of Some Problems on Multi-agent Scheduling on a Single Machine. J. Oper. Res. Soc. China 4, 379–384 (2016). https://doi.org/10.1007/s40305-016-0124-4