Introduction

Seismic velocity tomography is a powerful tool for inferring rock stress characteristics by reconstructing the wave velocity distribution (Begg et al. 2009; Cao et al. 2015; Friedel et al. 1995; Sheehan et al. 2014; Ustaszewski et al. 2012; Young and Maxwell 1992). This technique has been used in determining high-stress areas and predicting rockburst hazards in mining (Gong et al. 2019; Hosseini et al. 2011, 2012; Li et al. 2017; Wang et al. 2018). According to the types of wave sources, seismic tomography can be classified as “active” and “passive” (Lurka 2008; Luxbacher et al. 2008). Passive tomography uses mining-induced microseismic events as its sources, while the sources for active tomography are normally produced by explosives at known positions (Cao et al. 2015; Su et al. 2020). One of the prominent advantages of active tomography is that it can provide important assessments before coal mining by analysing controllable human-made vibration signals (He et al. 2011). Due to its precise source locations, identified study areas, and rapid and accurate inversion results, active velocity tomography has been paid increasing research attention.

For an active tomography test in a coal mine, explosives are generally arranged along the roadway as seismic signals, and geophones are arranged along the other roadway as receivers. Geophones can record vibration signals generated by the explosion in the coal-rock mass. The velocity distribution in the coal and rock mass can be inversed according to the first arrival time of different wave sources. The layout of blasting points and geophones in an underground coal mining is shown in Fig. 1.

Fig. 1
figure 1

Principle of active seismic velocity tomographic practice in underground coal mining

The travel time T from blasting points S to geophones R represents a line integral of wave slowness P (inverse of velocity v), which can be expressed by \({T}_{i}=\underset{{L}_{i}}{\overset{ }{\int }}\frac{ds}{V(x, y)}=\underset{{L}_{i}}{\overset{ }{\int }}S(x,y)ds\) (Hosseini et al. 2012; Lurka 2008), where \({L}_{i}\) is the \(i\) th ray path from source to geophones. To solve the equation, the inversion region can be divided into M grids, and travel time \({T}_{i}\) in the \(i\) th grid can be described as \({T}_{i}=\sum_{j=1}^{M}{d}_{ij}{S}_{j}\)(\(i=\mathrm{1,2}\dots N\)), where \({d}_{ij}\) is the distance travelled by the \(i\) th ray through grid \(j\), and N is the total number of rays. Apparently, accurately determining the travel time plays a crucial role in inversion calculation. However, mine explosives normally have a pre-set blasting delay due to the presence of delay composition, which means that travel time data recorded by geophones are not the actual propagation time of P-waves. Moreover, different types of explosives with different delays are likely to be used in one active tomographic operation, which maybe reduces the accuracy of inversion results.

This study investigates the effect of blasting delay in detail using an inversion model. Then, a least squares regression method is adopted to eliminate blasting delay based on the relationship between P-wave travel time and its propagation distance. The delay-eliminated seismic data is also applied in an active tomography test in a coal mine.

Methodology

Inversion model

An inversion model is established to investigate the effect of blasting delay on active tomography, as shown in Fig. 2a. 6 × 5 grids (N1, N2, …, N30) are created in the model, and each grid measures 20 m × 20 m in the X- and Y-directions, respectively. The coordinates of blasting points (B1, B2, B3 and B4) and receivers (R1, R2, R3 and R4) are listed in Table 1. Thirty random initial velocities ranging from 3.40 to 5.40 are distributed within this area, and the velocity contour is obtained by using the Kriging interpolation method (Fig. 2b). Two high-velocity regions are observed in the inversion model, namely N8 and N22. Table 2 shows the travel time of each seismic ray, which can be calculated based on the wave velocity and the distance travelled by a ray passing through the mesh. It is noted that the travel time in Table 2 is the actual propagation time (without blasting delay) of P-waves from blasting points to geophones in the inversion model.

Fig. 2
figure 2

Established active tomography model (a) (grid numbers represented by N1, N2, …, N30, velocity values represented by numerical values in every grid, unit: km/s) and velocity cloud image in active inversion model (b)

Table 1 Layout of blasting points and receivers in active inversion model
Table 2 Travel time of P-waves after blasting in active tomography model (unit: ms)

As mentioned above, the explosives used in coal mines usually have a blasting delay. Besides, two or more different types of detonators may be used in an active inversion operation. It may affect the inversion results due to the wrong P-wave travel time being applied in the tomographic algorithms. Therefore, the following two tests were conducted to study the effect of blasting delay on the inversion:

  1. Test 1:

    Adding different delay lengths from 1 to 6 ms to the actual P-wave travel time demonstrated in Table 2, and then reconstructing the velocity distribution.

  2. Test 2:

    Adding different delay combinations to the actual P-wave travel time demonstrated in Table 2, and then reconstructing the velocity distribution. The following six delay combinations were considered: (I) 1 ms of delay for B1 and B2, 5 ms of delay for B3 and B4; (II) 1 ms of delay for B1 and B3, 5 ms of delay for B2 and B4; (III) 1 ms of delay for B1 and B4, 5 ms of delay for B2 and B3; (IV) 1 ms of delay for B2 and B3, 5 ms of delay for B1 and B4; (V) 1 ms of delay for B2 and B4, 5 ms of delay for B1 and B3; and (VI) 1 ms of delay for B3 and B4, 5 ms of delay for B1 and B2.

Delay-eliminated method

For an active tomographic operation in a coal mine, the general relationship between recorded P-wave travel time and its propagation distance is shown in Fig. 3. There is a positive correlation between them, and all data are scattered near the red oblique line in the graph, but the line does not pass through the origin due to the existence of blasting delay. Without delay, the fit line should pass through the origin, as shown by the green line in Fig. 3. Therefore, the intercept of the fit line of the observed data is the delay. In view of this, the below method is used to calculate the delay.

Fig. 3
figure 3

Relationship between P-wave travel time and propagation time

Assuming vibration signals from a blasting point are recorded by \(n\) geophones in an active inversion test. The P-wave travel time recorded by the \(i\) th geophone is denoted by \({t}_{{p}_{i}}\) (\(i\) = 1, 2, …, \(n\)). The distance between the blasting point and the geophones is described as \({r}_{i}\). The relationship among P-wave velocity \(v\), P-wave travel time \({t}_{{p}_{i}}\) and the delay \({t}_{d}\) can be described as below:

$$\left\{\begin{array}{c}\begin{array}{c}\begin{array}{c}{t}_{{p}_{1}}={t}_{d}+\frac{{r}_{1}}{v}\\ {t}_{{p}_{2}}={t}_{d}+\frac{{r}_{2}}{v}\end{array}\\ \dots \dots ..\end{array}\\ {t}_{{p}_{n}}={t}_{d}+\frac{{r}_{n}}{v}\end{array}\right.\to \left[\begin{array}{c}\begin{array}{c}{\mathrm{t}}_{{p}_{1}}\\ {\mathrm{t}}_{{p}_{2}}\\ \dots \end{array}\\ {\mathrm{t}}_{{p}_{n}}\end{array}\right]=\left[\begin{array}{c}\begin{array}{cc}1& {r}_{1}\\ 1& {r}_{2}\\ \dots & \dots \end{array}\\ \begin{array}{cc}1& {r}_{n}\end{array}\end{array}\right]\left[\begin{array}{c}{t}_{d}\\ \frac{1}{v}\end{array}\right]$$
(1)

The \(v\) and \({t}_{d}\) are obtained by the least-square linear fitting method (Reza and Sengupta 2017; Xu et al. 2018):

$$\frac{1}{v}=\frac{\sum_{i=1}^{n}{r}_{i}{{t}_{p}}_{i}-\frac{1}{n}\sum_{i=1}^{n}{r}_{i}\sum_{i=1}^{n}{{t}_{p}}_{i}}{\sum_{i=1}^{n}{{r}_{i}}^{2}-\frac{1}{n}(\sum_{i=1}^{n}{{r}_{i}}^{2})}$$
(2)
$${t}_{d}=\frac{1}{n}\sum_{i=1}^{n}{{t}_{p}}_{i}-\frac{1}{v}\frac{1}{n}\sum_{i=1}^{n}{r}_{i}$$
(3)

The actual P-wave travel time \({{\mathrm{t}}^{^{\prime}}}_{pi}\) can be obtained by subtracting the detonator delay \({t}_{d}\) from the recorded P-wave travel time \({t}_{{p}_{i}}\):

$$\left\{\begin{array}{c}{{t}^{^{\prime}}}_{{p}_{1}}={t}_{{p}_{1}}-{t}_{d}\\ \begin{array}{c}{{t}^{^{\prime}}}_{{p}_{2}}={t}_{{p}_{2}}-{t}_{d}\\ \begin{array}{c}\dots \dots \\ {{t}^{^{\prime}}}_{{p}_{n}}={t}_{{p}_{n}}-{t}_{d}\end{array}\end{array}\end{array}\right.$$
(4)

According to the above steps, the delay for each blasting point can be obtained in turn, and then the actual P-wave travel time can also be obtained.

Applications

The selected coal panel (LW3310 in Xingcun Coal Mine) is situated in the south of Shandong province, China. The mining depth ranges from 1080 to 1125 m. The inclined length and strike length of the panel LW3310 are 680 m and 100 m, respectively (Fig. 4a). The north side of the panel borders LW5303 goaf. Some faults in the side of the track roadway were detected during roadway excavation, among which fault JF10-3 has a large down-throw of 5 m. To detect the stress distribution characteristics around WL3310, active velocity tomography was conducted from 12 to 14 May 2016. In the test, 31 blasting points (B1 to B31) with an explosive charge weighing 300 g each were arranged on the side of the track roadway. The blasting sequence is from B31 to B1 (Fig. 4b). Thirty-two geophones (S1 to S32) with a sampling rate of 4 kHz were arranged on the side of the transport roadway to receive blasting waves. Among these geophones, S1 is a standard one used to stamp the start time; thus, the P-wave travel time recorded by other geophones can be calculated by \({T}_{i}-{T}_{1} (i=2,\dots , 32)\). It should be noted that effective signals were recorded from other blasting points apart from the fact that blasting point B7 failed to detonate and geophone S24 did not record a signal.

Fig. 4
figure 4

Layout of the LW3310 working face (a) and layout of blasting points and receiver points (b)

The relationship between recorded P-wave travel time and propagation distance is shown in Fig. 5a. Two types of explosives with different delays were used in this active velocity tomographic practice marked explosive A and explosive B. The method proposed in the “Applications” section was used to eliminate the delay of detonators for the recorded waveform data. The blasting delay and wave velocity at all blasting points are calculated according to Eqs. (2) to (3), and the results are listed in Table 3. Blasting points B1 to B16 have short delays with values ranging from 0 to 10 ms. However, the delay at blasting points B17 to B30 is around 100 ms. The actual P-wave travel time can be obtained based on Eq. (4), and its relationship with propagation distance is shown in Fig. 5b. After the delay elimination, the velocity grouping phenomenon is not observed.

Fig. 5
figure 5

Relationship between P-wave travel time and distance before (a) and after (b) detonator delay elimination

Table 3 Calculated detonator delays and velocities

In the active tomography calculation, 34 × 8 grids were created in the inversion model, and each grid measured 20 m × 12 m in the X- and Y-directions, respectively. To improve the accuracy of seismic tomography, high signal-to-noise ratio waveforms were selected for the tomographic algorithm, and finally, 775 seismic rays between geophones and blasting points were created. A simultaneous iterative reconstruction technique was chosen as an inversion algorithm in this study considering its good convergence.

Results and discussion

Figure 6 shows the influence of different delay lengths (test 1 in the “Inversion model” section) on inversion results. After adding a delay of 1 ms, 3 ms and 5 ms, the calculated wave velocity ranges are 3.44 to 4.77 km/s, 3.32 to 4.53 km/s and 3.04 to 4.32 km/s, respectively. Figure 7a shows that the delay reduces the overall velocity in the inversion region, and the longer the delay, the greater the decrease. However, the high-velocity regions undergo little significant change. Figure 7b shows the root-mean-square (RMS) error statistics of velocity value under different delays. There is a linear increasing relationship between the delay length and the inversion error. In other words, the longer the delay, the greater the inversion error. According to the above analysis, we can get the enlightenment: without eliminating the blasting delay, the velocity distribution of coal-rock mass obtained by active tomographic detection may be lower than that in reality, for example, some low/medium-wave velocity areas may be potential high-wave velocity areas.

Fig. 6
figure 6

Inversion results after adding a delay of 1 ms (a), 3 ms (b) and 5 ms (c)

Fig. 7
figure 7

Comparison of inversion results (a) and inversion errors (b) with different delays

Figure 8 shows the influence of different delay combinations (test 2 in the “Inversion model” section) on inversion results. After adding delay combinations I, III and V, the calculated wave velocity ranges are 3.00 + to 6.36 km/s, 2.95 to 7.35 km/s and 2.87 to 7.05 km/s, respectively. Under different delay combinations, the range of wave velocity changes significantly, and the location of high-wave velocity regions also change in an unpredictable manner. In addition, compared with the model velocity (without delay), the wave velocity in grids N7 to N30 is generally low, but the trend is similar. However, the velocity changes in grids N1 to N6 are anomalous: some of the wave velocities are much higher than the model velocity, while some are much lower (see Fig. 9a). Figure 9b shows the RMS error of wave velocity under different delay combinations. The inversion error range under different delay combinations is 0.6149 to 0.9992 km/s, indicating that the error fluctuation is large. The above analysis indicates that different delay combinations exert a significant influence on the tomographic results, not only significantly increasing the inversion error, but also causing unpredictable velocity changes. In other words, the high-wave velocity area obtained by inversion under different delay combinations may be a potential low-wave velocity area, while the low-wave velocity area may also be a potential high-wave velocity area. Therefore, in the actual active tomography operations in a coal mine, the obtained velocity distribution may be unreliable if the effect of delay combinations is ignored.

Fig. 8
figure 8

Inversion results after adding delay combination I (a), combination III (b) and combination V (c)

Fig. 9
figure 9

Comparison of inversion results (a) and inversion errors (b) with different delay combinations

Figure 10a shows the tomographic results before blasting delay was eliminated. Different colours represent the magnitude of wave velocities. According to Fig. 10a, high-wave velocity regions are mainly located near faults. The distribution of high- and low-wave velocity regions is obvious, and gradient of wave velocity is large ranging from 2.8 to 6.32 km/s. Unpredictable velocity anomalies appear in the inversion region due to different delay combinations, which fails to reflect the true stress state in a coal-rock mass.

Fig. 10
figure 10

Inversion result before (a) and after (b) eliminating delay

Actual P-wave travel time data were also used for active tomographic calculation after delay elimination, and the result is demonstrated in Fig. 10b. There are four high-stress areas detected in panel LW3310 (i.e. areas A, B, C and D). Among them, area B has the highest wave velocity which corresponds to the highest stress concentration. The fault JF10-3 within area B was activated by roadway driving, resulting in regional stress concentration (Sainoki et al. 2017; Sidorenko et al. 2019; Wu et al. 2017). In addition, coal seam thinning had occurred in this area according to the field investigation. Stresses tend to increase in coal seam thinning areas (Yang et al. 2018; Zhu et al. 2016). Therefore, the wave velocity anomaly in area B is mainly affected by fault activation and coal thickness variation. High-velocity area C lies in the syncline axis. The horizontal stress exhibits significantly increasing trend for coal mass in the syncline axis (Guo et al. 2017; Shepherd et al. 1981; Wang et al. 2016). Therefore, the syncline structure is the main reason for the increase of the wave velocity in this area. For the high velocity areas A and D along the transport roadway of LW3310, high-stress areas are formed by transferred stress due to the excavation of nearby panel LW3308. The high-stress distribution in areas A and D is also consistent with the fact that the nut and anchor bolt on the side close to the transport roadway are tightly engaged and cannot be disassembled. According to the above analysis, the reliability of the inversion result of active velocity tomography after eliminating the delay is proved, and the accuracy of the delay elimination method at each detonator is also explained.

Conclusions

The pre-set blasting delay in the detonators renders the active velocity tomographic results inaccurate. In this study, an active tomography model was established to investigate the effect of blasting delay in two delay schemes. Experimental results show that, if all detonators have the same delay, the delay will reduce the overall velocity in the inversion region, and the longer this delay is, the greater the decrease in wave velocity. If detonators have different pre-set delays, different delay combinations significantly increase the inversion error. According to the relationship between P-wave travel time and propagation distance, a delay-elimination method was proposed by least squares linear fitting. The proposed method was successfully used to eliminate delay in seismic data in an active tomography operation in panel LW3310 of Xingcun Coal Mine, Shandong province, China. After that, delay-eliminated seismic data were also applied to tomographic calculation. Inversion results successfully reveal high-stress areas in the studied panel.