Abstract
We consider the problem of scheduling jobs arriving over time in a multiprocessor setting, with immediate dispatching, disallowing job migration. The goal is to minimize both the total flow time (total time in the system) and the total completion time. Previous studies have shown that while preemption (interrupt a job and later continue its execution) is inherent to make a scheduling algorithm efficient, migration (continue the execution on a different machine) is not. Still, the current non-migratory online algorithms suffer from a need for a central queue of unassigned jobs which is a "no option" in large computing systems, such as the Web. We introduce a simple online non-migratory algorithm IMD, which employs immediate dispatching, i.e., it immediately assigns released jobs to one of the machines. We show that the performance of this algorithm is within a logarithmic factor of the optimal migratory offline algorithm, with respect to the total flow time, and within a small constant factor of the optimal migratory offline algorithm, with respect to the total completion time. This solves an open problem suggested by Awerbuch et al. (STOC 99).
Article PDF
Similar content being viewed by others
Explore related subjects
Discover the latest articles, news and stories from top researchers in related subjects.Avoid common mistakes on your manuscript.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Avrahami, N., Azar, Y. Minimizing Total Flow Time and Total Completion Time with Immediate Dispatching. Algorithmica 47, 253–268 (2007). https://doi.org/10.1007/s00453-006-0193-6
Issue Date:
DOI: https://doi.org/10.1007/s00453-006-0193-6