Abstract
An attempt was made to study the physical and biological clogging during artificial recharge with an experimental model that simulates the artificial recharging practice by considering factors such as effective infiltration rate, media size and depth, and inundation period. Recharging was investigated experimentally in terms of suspended solids (SS) removal, 3-day biological oxygen demand (BOD3) removal and chemical oxygen demand (COD) removal at different sand sizes and infiltration rates. To understand the physical phenomenon involved, the effect of suspended solids concentration and initial infiltration rate on cumulative discharge was studied and verified using a simple mathematical model. The simulated cumulative discharge profiles were comparable with the experimental profiles. This indicates that an empirical relationship can be successfully used to predict the biological clogging at different recharge rates. The effect on headloss was also discussed.
Article PDF
Similar content being viewed by others
Avoid common mistakes on your manuscript.
References
Allison, L. E.: 1947, Soil Science 63, 439.
American Waterworks Association, American Public Health Association, and Water Pollution Control Federation: 1981, Standard Methods for the Examination of Water and Wastewater, 4th edition, American Public Health Association, Washington D.C.
Amramy, A.: 1965, J. Air Water Pollut. 9, 605.
Avnimelech, Y. and Nevo, Z.: 1964, Soil Science 98, 222.
Besty, R. J.: 1980, Burdekin Artificial Groundwater Recharge Study: Biological Problems in Artificial Recharge of Groundwater, AWRC Groundwater Recharge Conference, Townsville, Australia.
De Vries, J.: 1972, J. Water Pollut. Control Federation 44, 565.
Fetter, C. W. and Holzmacher, R. G.: 1974, J. Water Pollut. Control Federation 46, 260.
Harpaz, Y.: 1970, Practical Experiences of Well Recharge, Proceedings of Artificial Groundwater Recharge Conference, Water Research Association, England.
Huisman, L. and Olsthoorn, T. N.: 1983, Artificial Groundwater Recharge, John Wiley and Sons, New York.
Lance, J. C. and Whistler, F. D.: 1973, Nitrogen Removal During Land Filtration of Sewage Water, Canadian Society of Soil Science, Proceedings of the International Conference on Land for Waste Management, Canada.
Mitchell, R. and Nevo, Z.: 1964, Applied Microbiology 12, 219.
Nevo, Z. and Mitchell, R.: 1967, Water Research 1, 231.
Okubo, T. and Matsumoto, J.: 1979, Water Resources Research 15, 1532.
Okubo, T. and Matsumoto, J.: 1983, Water Resources Research 17, 813.
Ripley, D. P. and Saleem, Z. A.: 1973, Water Resources Research 9, 1047.
Thiyagaram, M.: 1982, ‘Three-Dimensional Filtration Models and their Application to Groundwater Recharge Problems’, Master's Thesis, Asian Institute of Technology, Bangkok, Thailand.
Todd, D. K.: 1959, Groundwater Hydrology, 2nd edition, John Wiley and Sons, New York.
Vecchioli, J. and Ku, H.: 1971, Preliminary Results of Injecting Highly Treated Sewage-Plant Effluent into a Deep Sand Aquifer at Bay Park, New York, U.S. Geological Syrvey Report.
Vigneswaran, S., Jeyaseelan, S., and Das Gupta, S.: 1985, Water, Air, and Soil Pollut. 25, 1.
Vigneswaran, S. and Thiyagaram, M.: 1984, Water, Air, and Soil Pollut. 22, 417.
Winquist, G. and Marelius, K.: 1970, The Design of Artificial Recharge Schemes, Proc. Artificial Groundwater Recharge Conference, Water Research Association, England.
Wood, W. W. and Bassett, R. L.: 1975, Water Resources Research 11, 553.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Vigneswaran, S., Suazo, R.B. A detailed investigation of physical and biological clogging during artificial recharge. Water Air Soil Pollut 35, 119–140 (1987). https://doi.org/10.1007/BF00183848
Received:
Revised:
Issue Date:
DOI: https://doi.org/10.1007/BF00183848