Abstract
The cutoff grade problem is an important research challenge and vital optimization task in the yearly operational planning of open pit mines due to its combinatorial nature. Because of it's influenced by the economic parameters, the capacities of stages in the mining operation, mining sequence, and grade distribution of the deposit. Essentially, it asserts that the dynamic cutoff grade at any given period is a function of the ore availability and the needs of the mill at that period. Consequently, cutoff grades strategy and extraction sequence should be considered, simultaneously. Due to its goal, various attempts have been made to develop a computerized procedure for the extraction sequence of open pit mine. None of the resulting approaches appear to enjoy wide acceptance because of it's the numerous associated variables. A new model is proposed to overcome this shortcoming. This model solves the problem in the three steps: 1) the actual economic loss associated with each type of processing for each block, 2) the probabilities distribution and average grade for each type processing is computed from independent realization, and 3) each block with its expected economic loss is developed as a binary integer programming model. Using this model, the optimum extraction sequences in each period are identified based on the optimum processing decisions. A case study is presented to illustrate the applicability of the model developed. Results showed that the extraction sequences obtained using the suggested model will be realistic and practical. This model allows for the solution of very large problem in reasonable time with very high solution quality in terms of optimal net present value.
Article PDF
Similar content being viewed by others
Avoid common mistakes on your manuscript.
Change history
08 September 2017
In the published version there is an error in the title. The present form in this erratum is the correct: Optimal Cutoff Grades Modeling for Open Pit Mining Operations during Mining Sequences.
References
Dagdelen, K, An Optimization Algorithm for Open Pit Mine Design, Proc. 24th Conf. Application of Computers and Operations Research in the Mineral Industry, Quebec, 1993, pp. 157–165.
Lane, K.F., The Economic Definition of Ore, Cutoff Grade in Theory and Practice, Mining Journal Books Limited, London, 1988.
Mohammad, W.A, Development of Generalized Cutoff Grade Optimization Algorithm for Open Pit Mining Operations, Journal of Engineering and Applied Science, 2002, 21(2), pp. 119–127.
Mortimer, G.J, Grade Control, Trans. Inst. Min. Metall., 1950, 59, pp. 357–99.
Lane, K.F, Choosing the Optimum Cutoff Grade, Colorado School of Mines Quarterly, 1964, 59(4), pp. 811–829.
Shinkuma, T. and Nishiyama, T, The Grade Selection Rule of Metal Mines: An Empirical Study on Copper Mines, Resource Policy, 2000, 26, pp. 31–38.
Cairns, R.D. and Shinkuma, T, The Choice of Cutoff Grade in Mining, Resource Policy, 2003, 29, pp. 75–81.
Ataei, M. and Osanloo, M, Methods for Calculation of Optimal Cutoff Grade in Complex Ore Deposits, Journal of Mining Science, 2003, 39, pp. 499–507.
Ataei, M. and Osanloo, M, Using a Combination of Genetic Algorithm and the Grid Search Method to Determine Optimum Cutoff Grades of Multiple Metal Deposits, International Journal of Surface Mining, Reclamation and Environment, 2004, 18(1), pp. 60–78.
Rashidinejad, F., Osanloo, M., and Rezai, B, An Environmental Oriented Model for Optimum Cutoff Grades in Open Pit Mining Projects to Minimize Acid Mine Drainage, Int. J. Environ. Sci. Tech., 2008, 5(2), pp. 183–194.
Gholamnejad, J, Incorporation of Rehabilitation Cost into the Optimum Cutoff Grade Determination, Journal of the Southern African Institute of Mining and Metallurgy, 2009, 108, pp. 89–94.
Halls, J.L. and John, L, Determination of Optimum Ore Reserves and Plant Size by Incremental Financial analysis, Transactions of the Institute of Mining and Metallurgy, 1969, 78, A20–A26.
Taylor, H.K, General Background Theory of Cutoff Grade, Transactions of the Institute of Mining and Metallurgy, 1972, A(96), A204–A216.
Taylor, H.K, Cutoff Grades—Some Further Reflections, Transactions of the Institute of Mining and Metallurgy, 1985, A(81), A160–A179.
Johnson, T.B, Optimum Open Pit Mine Production Scheduling, PhD Thesis, Operations Research Department, University of California, Berkeley, 1968.
Johnson, T.B, Optimum Production Scheduling, Proc. 8th Int. Symp. Computers and Operations Research, 1969, pp. 539–562.
Dagdelen, K., Optimum Multi-Period Open Pit Mine Production Scheduling, PhD Thesis, Colorado School of Mines, Golden, Colorado, 1985.
Dagdelen, K. and Johnson, T.B, Optimum Open Pit Mine Production Scheduling by Lagrangian Parameterization, Proc. 19th Conf. Application of Computers and Operations Research in the Mineral Industry, 1986, pp. 127–142.
Kawahata, K., A New Algorithm to Solve Large Scale Mine Production Scheduling Problems by Using the Lagrangian Relaxation Method, PhD Thesis, Colorado School of Mines, 2007.
Moosavi, E., Gholamnejad, J., Ataee-pour, M., and Khorram, E, Improvement of Lagrangian Relaxation Performance for the Open Pit Mines Constrained Long-term Production Scheduling Problem, Journal of Central South University, 2014, vol. 21, pp. 2848–2856.
Moosavi, E., Gholamnejad, J., Ataee-pour, M., and Khorram, E., A Hybrid Augmented Lagrangian Multiplier Method for the Open Pit Mines Long-Term Production Scheduling Problem Optimization, Journal of Mining Science, 2014, vol. 50, pp. 1047–1060.
Akaike, A., and Dagdelen, K. A, Strategic Production Scheduling Method for an Open Pit Mine, Proc. 28th Conf. Application of Computers and Operation Research in the Mineral Industry, 1999, pp. 729–738.
Mogi, G., Adachi, T., Akaike, A., and Yamatomi, J, Optimum Production Scale and Scheduling of Open Pit Mines Using Revised 4D Network Relaxation Method, Proc. 17th Int. Symp. Mine Planning and Equipment Selection, 2001, pp. 337–344.
Wang, Q., Gu, X., and Chu, D., A Dynamic Optimization Method for Determining Cutoff Grades in Underground Mines, Mineral Resources Management (Gospodarka Surowcami Mineralnymi), 2008, pp. 133–142.
Xiau-wei, Gu, Qing, Wang, Dao-Zhang, Chu, and Bin, Zhang, Dynamic Optimization of Cutoff Grade in Underground Metal Mining, Journal of Central South University, 2010, 17, pp. 492–497.
Zhang, M, Combination Genetic Algorithms and Topological Sort to Optimize Open-Pit Mine Plans, Proc. 15th Conf. Mine Planning and Equipment Selection, Torino, Italy, 2006, pp. 1234–1239.
Boland, N., Dumitrescu, I., Froyland, G., and Gleixner, A.M., LP-Based Disaggregation Approaches to Solving the Open Pit Mining Production Scheduling Problem with Block Processing Selectivity, Computer Operation Research, 2009, 36(4), pp. 1064–1089.
Gleixner, A., Solving Large-Scale Open Pit Mining Production Scheduling Problems by Integer programming, Master’s Thesis, Technische Universität Berlin, 2008.
Newman, A., Rubio, E., Caro, R., Weintraub, A., and Eurek, K., A Review of Operation Research in Mine Planning, Interface, 2010, 40(3), pp. 222–245.
Espinoza, D., Goycoolea, M., Moreno, E., and Newman, A, MineLib: A Library of Open Pit Mining Problems, Annals of Operations Research, 2013, 206(1), pp. 93–114.
Gershon, M.E, Optimal Mine Production Scheduling: Evaluation of Large Scale Mathematical Programming Approaches, International Journal of Mining Engineering, 1983, 1(4), pp. 315–329.
Richmond, A.J, Maximum Profitability with Minimum Risk and Effort, Application of Computers and Operations Research in the Mineral Industry, 2001, pp. 45–50.
Author information
Authors and Affiliations
Corresponding author
Additional information
The article is published in the original.
An erratum to this article is available at https://doi.org/10.1134/S1062739116061772.
Rights and permissions
About this article
Cite this article
Moosavi, E., Gholamnejad, J. Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade. J Min Sci 52, 956–964 (2016). https://doi.org/10.1134/S1062739116041465
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1134/S1062739116041465