Keywords

1 Introduction

Voltage stability is the ability of a power system to maintain steady voltages at all buses in the system after being subjected to a disturbance from a given initial operating condition [1]. Nowadays, voltage instability is a challenging problem in a power system. Insufficient of supply and unnecessary absorption of reactive power cause voltage instability in a power system. Voltage instability may result in the voltage collapse if necessary actions are not taken immediately to restore the system voltage within limits.

Voltage stability study has been classified into static and dynamic analysis. For static voltage stability study, algebraic equations are solved. Therefore, static voltage stability analysis is computationally less complex than dynamic analysis [2]. In this paper, static voltage stability analysis has been carried out to identify voltage stability status.

Static voltage stability analysis is to be done with various methods such as PV and QV curves [3], reduced Jacobian matrix based modal analysis [4] but these methods are time consuming for interconnected system network. Nowadays, numbers of voltage stability indices such as VCPI, \( {\text{L}}_{mn} \), FVSI, Line Stability Factor (LQP), and New Voltage Stability Index (NVSI) have been used to assess system voltage stability status [5]. In the present paper, simulation and result analysis of \( {\text{L}}_{mn} \), FVSI, and VCPI are carried out for static voltage stability study. To identify the distance from the particular current operating point to the point of voltage collapse, these all indices are used.

Contingency means unpredictable event/outage and it may be caused by line outage or change in generation in the system which could lead the voltage instability. Contingency analysis can be done using different methods such as AC power flow, LSFs [6], line stability indices [7], various artificial intelligence techniques, etc. In the present paper, contingency analysis has been carried out using LSFs based on Z-bus method. From the contingency analysis, power system operator can know about the effect on power system when an outage of any particular line or generator occurs.

2 Indices Formulation

2.1 Line Stability Index (\( {\text{L}}_{mn} \))

Moghavemmi [8] has expressed \( {\text{L}}_{mn} \) by analyzing power flow in a single transmission line. The \( {\text{L}}_{mn} \) index is detected the distance from current operating point to the point of voltage collapse. The \( {\text{L}}_{mn} \) value is 0 in no load condition and 1 in collapse condition. \( {\text{L}}_{mn} \) is given by Eq. (1)

$$ {\text{L}}_{mn} = \frac{{ 4xQ_{\text{r}} }}{{[V_{\text{s}} { \sin }({\theta - }\delta )]^{ 2} }} $$
(1)

where \( \uptheta \) is impedance angle, \( Q_{\text{r}} \) is the receiving bus reactive power flow in pu, x is line reactance in pu, \( \delta \) is angular difference between sending end and receiving end bus voltage, and \( V_{\text{s}} \) is sending end bus voltage in pu.

2.2 Fast Voltage Stability Index (FVSI)

Musirin [9] has used the same concept of power flow through a single transmission line and the derived FVSI can be given by Eq. (2)

$$ {\text{FVSI = }}\frac{{ 4\left| {\text{Z}} \right|^{ 2} Q_{\text{r}} }}{{\left| {V_{\text{s}} } \right|^{ 2} x}} $$
(2)

where Z is the line impedance in pu.

FVSI can be calculated based on the above equation which depends on the reactive power flow through transmission line. The line has index value is close to 1 indicates that line goes into instability condition and may cause voltage collapse.

FVSI can also use to identify weak bus based on a maximum allowable load on the bus in a system. The weakest bus in the system is considered as a bus which has minimum the value of maximum allowable reactive load in the whole system.

2.3 Voltage Collapse Proximity Index

Moghavvemi [8] has expressed VCPI index for the investigate voltage stability of each line based on the same concept power transfer through the line. VCPI is given by Eq. (3)

$$ {\text{VCPI}}({\text{P}}) = \frac{{P_{\text{r}} }}{{P_{{{\text{r}}({ \hbox{max} })}} }} $$
(3)

where \( P_{\text{r}} \) is the active power flow at the receiving end bus in pu and \( P_{{{\text{r}}(\hbox{max} )}} \) is the maximum active power transferred through the line in pu is given by Eq. (4).

$$ {P}_{{{\text{r}}({ \hbox{max} })}} = \frac{{{V}_{\text{s}}^{ 2} }}{\text{Z}}.\frac{{{ \cos }{\upvarphi }}}{{ 4\,{ \cos }^{ 2} \left( {\frac{{\uptheta - {\upvarphi }}}{ 2}} \right)}} $$
(4)

where \( {\upvarphi } = { \tan }^{ - 1} \frac{{{Q}_{\text{r}} }}{{{P}_{\text{r}} }} \) = power factor angle.

With the increasing power transfer through a line, VCPI index value is increased when the VCPI reaches to 1, and the system voltage collapses. VCPI is adequate for indicating voltage collapse in the line.

3 Linear Sensitivity Factors (LSFs)

There are thousands of possible outages on a daily basis. It is difficult to solve the outage with less time in a power system. With the help of LSFs, it is possible to get the quick and fast solution of possible overloads [6]. These factors give approximate change in line flow with the change in generation or outage of any line. These factors are basically two types:

  • Line Outage Distribution Factor (LODF)

  • Generation Shift Factor (GSF)

In this paper, only LODF is used for contingency screening.

3.1 LODF Using Z-Bus Element

When the transmission circuit is lost, the LODF is used to verify the overload of the line [10]. It is given by Eq. (5),

$$ {\text{L}}_{ij,mn} = - \frac{{{\text{Z}}_{a} }}{{{\text{Z}}_{c} }}\left[ {\frac{{({\text{Z}}_{im} - {\text{Z}}_{in} ) - ({\text{Z}}_{jm} - {\text{Z}}_{jn} )}}{{{\text{Z}}_{th,mn} - {\text{Z}}_{a} }}} \right] $$
(5)

where mn = outage line, ij = ne whose post-outage power flow is to be checked, \( \text{Z}_{a} \) = impedance of outage line, \( \text{Z}_{c} \) =  impedance of line under consideration, \( {\text{Z}}_{im} ,{\text{Z}}_{in} ,{\text{Z}}_{jm} ,{\text{Z}}_{jn} \) =  off-diagonal elements of Z-bus.

$$ {\text{Z}}_{th,mn} = {\text{Z}}_{mm} + {\text{Z}}_{nn} - 2*{\text{Z}}_{mn} $$
(6)

where \( {\text{Z}}_{mm} \), \( {\text{Z}}_{nn} \) = diagonal elements of Z-bus.

Post-outage power flow in line ij due to outage of line mn is given by Eq. (7),

$$ {\text{P}}_{ij}^{ '} = {\text{P}}_{ij} + {\text{L}}_{ij,mn} {\text{P}}_{mn} $$
(7)

where \( {\text{I}}_{ij} \) = pre-outage power flow in line ij, \( {\text{I}}_{mn} \) = pre-outage power flow in line mn.

4 Test Result and Discussion

In order to demonstrate the effectiveness of voltage stability indices and LSFs numerical analysis have been made for the IEEE 14-bus test system.

4.1 Base Case Loading

Base loading means that load at all buses to prespecified load of IEEE 14 bus test system [11]. Lines with smaller voltage stability indices have much more voltage stability margin whereas larger voltage stability indices indicate that lines are heavily stressed condition and further addition of load line goes into voltage collapse condition.

Different voltage stability indices have been calculated for IEEE 14 bus system are presented in Table 1. It is observed from this Table 1 that line 7–8 has the highest index value compared to another line because compensator is connected to bus 8. In base case loading, no one line becomes stressful. Therefore, more reactive power can supply in base the case.

Table 1 Voltage stability indices for IEEE 14—bus test system with base case loading

4.2 Global Load Increase

Global load increase, it means that equal percentage of active, reactive or apparent load are increased on all buses. Loading means increased active or reactive load on the load bus of IEEE 14 bus test system from its base loading.

From Table 2, it is observed that \( {\text{L}}_{mn} \) and FVSI have a similar result for all types of loading for 20 and 40% loading. If the load is increased, the indices value is increased in all three cases but \( {\text{L}}_{mn} \) and FVSI gives system status when reactive load increases. VCPI is more suitable for active and apparent loading condition. In all these buses, the voltage is more than 0.9 pu in all cases so that the system voltage remains in stable condition. Table 2 shows that in power system, till 40% load increase, no lines become critical because the voltage stability index for 40% loading is less than one. So for global loading, system maintain stability for up to 40% or more loading.

Table 2 Indices result of line 13–14 for global loading

Voltage stability indices can also determine the weakest bus in the system and it is based on the maximum loadability of a bus. Arrange maximum loadability of the bus in ascending order and lowest maximum loadability of bus is considered as the weakest bus.

From Fig. 1, it is shown that bus 14 has the less reactive loading. So, bus 14 is considered as the weakest bus in the system and this bus is also far away from the generator so less active power reach to bus 14. Bus 4 is the largest loadability compared to all load buses. So, this bus is the strongest bus in the system and bus 4 is near to generator so it contains large active power from the generator.

Fig. 1
figure 1

Maximum loadability of load buses in IEEE 14 bus system

Table 3 shows the voltage stability indices for maximum loading condition of load bus and it shows that line 9–10 and 10–11 are having largest indices value for loading on bus 10. So, these lines become critical for loading on bus 10 (Fig. 2).

Table 3 Line stability indices for IEEE 14 test system
Fig. 2
figure 2

\( {\text{L}}_{mn} \) versus reactive load variation for bus 13

Figure 3 shows that line 6–13 is the critical line for loading on bus 13 and when this load is 240 MVAR, this line achieves FVSI value near to unity.

Fig. 3
figure 3

FVSI versus reactive load variation for bus 13

The chart presented in Fig. 4 shows the value of VCPI in each variation of reactive load for bus 13. Line 13–14 needs some higher value of reactive loading to attain unity value of VCPI index.

Fig. 4
figure 4

VCPI versus reactive load variation for bus 13

Table 4 shows that lines which have \( {\text{L}}_{mn} \) value is near to unity for maximum reactive loading and these all lines are considered as the most critical line for individual bus loading.

Table 4 Critical line for individual bus loading based on \( {\text{L}}_{mn} \)

5 Contingency Screening

Steps to follow for performing contingency screening by using LSFs based on Z-bus method.

  • Step 1. Obtain Z-bus for IEEE 14 bus test system using MATLAB coded program.

  • Step 2. Calculate pre-outage power flow for all lines.

  • Step 3. Find out LSFs from Z-bus element for particular line outage.

  • Step 4. Calculate post-outage power flow using LSFs.

  • Step 5. Compare post-outage power flow with MW limit of line.

  • Step 6. Extract lines which exceed its MW limit and choose one line which is maximum MW overloading margin from MW limit. Consider this line is the most stressed line for particular line outage.

  • Step 7. Repeat steps 1–6 for all line outages.

  • Step 8. Arrange the line with MW margin in descending order.

  • Step 9. Top order outage is considered as the most critical line outage.

Table 5 shows that in most of the line outage case, line 2–1 becomes most critical line because this line is directly connected to a bus where large generator connected. So, that for every outage, most of active power supply by generator is flowing through line 2–1 so this line is the most stressful line.

Table 5 Contingency screening of IEEE 14 bus system using LSFs

6 Conclusion

This paper presents a comparative study and analysis of the different voltage stability indices for static voltage stability assessment. Voltage collapse occurs when system is heavily loaded, the voltage magnitude decreases. These indices can predict voltage stability of power system under all operating condition. These indices can be used to identify critical lines and weakest bus in the system. Based on simulation result, it can be concluded that to identify voltage stability status, VCPI gives accurate result when active power change in the system while \( {\text{L}}_{mn} \) and FVSI gives accurate for reactive power change in the system. From the contingency screening, it can be concluded that line 1–2 is a most severe line and which is overloaded in all the line outages and line 1–2 is most severe outage in the system.