Keywords

1 Introduction

The hunt for Black Gold started in the Indian offshore region when Oil and Natural Gas Corporation Limited (ONGC) started its operations in the western offshore region of India in the year 1976. Since then, more than 265 well, process, and living quarter platforms have been installed and operated by ONGC. By now, quite a large number of platforms have either exceeded their design lives or undergone/undergoing modification/mitigation measures due to change in design premises and/or revamping projects executed for enhanced oil recovery. Re-assessment of these offshore platforms involves structural integrity check after taking due consideration of change in design premises along with new loads and structural damages, if any.

This paper describes the summary of the work carried out at the Institute of Engineering and Ocean Technology (IEOT), ONGC, on the project of global static in-place structural integrity check of an existing platform and consequential mitigation measures. The mitigation measures suggested for the particular platform are in combination with the removal of redundant equipment and appurtenances, restriction on marine growth, strengthening of members/joints, and additional retrofit members/piles. The paper highlights the main findings of the study with special emphasis on the jacket and pile structure.

2 Structural Analysis

2.1 Design-Level Analysis

The study for this typical jacket structure , located in western offshore, for the structural integrity check on specific requirements from the asset/platform operator in the context of its design life has been outlived. The salient features of the platform have been listed in Table 1 and Fig. 1.

Table 1 Platform details
Fig. 1
figure 1

Key plan and 3-D view of the jacket structure

Fig. 2
figure 2

Jacket structural collapse around a load level of 1.05

An initial global static in-place design level analysis of the platform has been carried out for 100-year extreme storm condition with 85% environmental loading considering all lateral loads, i.e., Wave, Current, and Wind, with a load factor 0.85 (reduced environmental criteria1) in combination with other design loads including gravity loads due to self-weight and production facilities installed on the platform topside. A marine growth thickness of 100 mm from EL (+) 6 m to EL (−) 30 m and 50 mm from EL (−) 30 m to mud line has been considered in the analysis.

The primary structural members have been checked for yield, stability, and nominal joint strength assessment for 100-year extreme storm condition [1]. In the design-level analysis, all the piles have been checked for axial load carrying capacity and the pile head stresses.

The results of the design-level analysis revealed that for 100-year extreme storm condition with 85% environmental loading and associated design loads, the factor of safety (FOS) against axial capacity for all the piles is more than 1.50 under various load cases in both compression and pull out. In pile head stress utility ratio check, all the piles were found to have material utilization higher than the maximum permissible limit of 1.0. Hence, re-analysis was performed after incorporating load reduction measures. The load reduction measures comprised of removal of redundant sump and pump caisson, non-consideration of future riser protector, and restriction of marine growth thickness to 50 mm throughout. The results of the re-analysis showed that still some of the piles were highly overstressed with a UC value higher than the permissible limit of 1.00 (refer Table 2).

Table 2 Pile FOS and pile UC values for original condition (with 85% environmental loading) with suggested load reduction measures

Member strength assessment revealed that six structural members were having capacity utilization more than the API (RP-2A-WSD) specified limit value of 1.0 with a maximum capacity overutilization by 24%. In joint strength check, three structural joints were showing high capacity utilization with UC ratios exceeding the acceptable limit of UC ratio of 1.0 with a maximum capacity overutilization by 28%.

2.2 Simplified (Linear) Ultimate Strength Analysis

Subsequently, simplified (linear) ultimate strength in-place analysis with 100% environmental loading was performed, and few primary structural members and joints were found to be having utility ratio higher than the acceptable value of 1.2781. Hence, few structural members and joints were not passing the assessment requirement even as per the simplified ultimate strength analysis check (Linear global analyses check as per API-RP-2A (WSD)).

  • Member Check Results:

S. No.

Member

UC ratioa

UC ratiob

1

203L-0743

1.034

1.278

2

201L-0004

1.099

1.352

3

202L-0005

1.043

1.255

4

203L-0006

1.243

1.530

5

204L-0007

1.119

1.347

6

0001-404L

1.008

1.181

  • Joint Check Results:

S. No.

Brace member

Location

UC ratioa

UC ratiob

1

0007

Row-A, X-brace joint, b/w EL (−) 52.76 m and EL (−) 77.455 m

1.280

1.538

2

0253

Horizontal level, EL (−) 52.760 m

1.232

1.426

3

0005

Row-B, X-brace joint, b/w EL (−) 52.76 m and EL (−) 77.455 m

1.225

1.466

  1. Note aDepicts design-level analysis with 85% environmental loading
  2. bDepicts simplified ultimate strength analysis with 100% environmental loading

2.3 Nonlinear Ultimate Strength Analysis

As the results of the design-level analysis and simplified ultimate strength analysis revealed that some of the primary structural members, joints, and piles do not meet the assessment requirement, a higher level nonlinear ultimate strength analysis was carried out for eight directions of environmental loading. In this paper, results of nonlinear plastic collapse analysis [2] using USFOS [3] software have been discussed for assessing the ultimate strength of the jacket platform, and reserve strength ratio (RSR ) values for the structure have been presented. The RSR is defined as

$${\text{RSR = }}\frac{\text{Ultimate lateral load carrying capacity}}{{100\,{\text{year environmental condition lateral loading}}}}$$

The results of the ultimate strength analysis revealed that the structure is not able to withstand the environmental forces up to the target RSR [4] level of 1.323 for all the considered directions, primarily due to failure of Row-2 piles (refer Fig. 3) and X-brace joints present on Row-A and Row-B of the jacket structure , around a load level of 1.05 (refer Fig. 2).

Fig. 3
figure 3

Failure of row-2 piles, depicting plastic utilization

Thereafter, a re-analysis for nonlinear ultimate strength check was carried out after considering conductors as piles for providing the lateral support [5]. The re-analysis results revealed that the structural adequacy of the jacket structure of platform still could not be documented for all the wave approach directions even after considering the conductors as piles.

The analysis results (both design-level and ultimate strength ) revealed that the structure was having overstressed piles (predominantly Row-2 piles) and X-brace joints. The main reason for that is the change in the design regime (design hydrodynamic coefficients, hydrodynamic marine growth thickness, etc.) and installation of additional facilities on the platform over a period of time. All these factors have contributed to an increase in the hydrodynamic loading by more than 45%.

3 Additional Piles/Strengthening Requirement

3.1 Load Transfer and Load Distribution Mechanism for Additional Pile Arrangement

In view of the insufficient capacity of the jacket structure to withstand the design loading, an analysis study for installation of additional piles along with grouting of overstressed joints and members is contemplated.

The existing piles on Row-2 of the platform are found to be highly overstressed, and hence, additional piles have been contemplated to be installed near them. For ensuring proper load transfer, adequate strength pile connection needs to be designed, fabricated, and installed. The load distribution pattern needs to consider the fact that the vertical loads due to self-weight of the structure and topside (deck) loading would have already mobilized the pile-soil resistances for the existing piles, and the additional piles will only be contributing toward sharing the incident environmental loading. To assess the structural adequacy of the additional piles for sharing the environmental loading on the jacket structure , two separate analysis studies (with 100% loading) have been carried out:

  1. 1.

    In-place design -level analysis with only existing piles considering only gravity loads (100%)

  2. 2.

    In-place design-level analysis with all piles (incl. additional piles) considering only environmental loads (100%)

The effects on the support system (pile-soil system) were then combined to achieve the pile head loads for ascertaining the pile material utilization and soil capacity utilization (refer Table 3). It is important to note that pile material utilization is of utmost concern as the jacket structure was having highly overstressed piles in its original condition. An iterative procedure was adopted for the selection of adequate pile size for providing sufficient support capacity, and therefore, pile sizes ranging from 60 in. up to 84 in. were checked for. Following this procedure, it was finally proposed to install four 84 in. (2.134 m) additional piles on Row-2 of the platform (two additional piles each at pile location A2 and B2); thereby all the piles been found to meet the requisite strength requirements.

Table 3 Factor of safety for extreme storm condition for both compression and pull out for well platform

Additionally, the exact new pile intra-spacing and distance from existing piles on Row-2 (refer Fig. 4) will have to be ascertained for assessing the load distribution and pile group effects. The proximity to which the installation barge could approach the platform and the obstruction posed due to the structure deck needs to be duly considered.

Fig. 4
figure 4

Structural model with additional piles

3.2 Proposed Additional Pile Details

Number: 4

Size: 2.134 m (84 in. outer diameter) × 0.065 m (Thickness)

Vertical Penetration below mud line: 45.5 m

It is to be noted that after carrying out the strengthening of the jacket structure with additional four piles on Row-2 of the structure, the load redistribution has effectively resulted in the reduction of stresses in some of the adjacent members and joints , e.g., the Row-A and Row-B primary X-brace joints (b/w EL (−) 52.76 m and EL (−) 77.455 m) were now found to be stressed within permissible limits.

3.3 Grouting Scheme

One of the primary structural members and two primary structural joints were found to be overstressed after carrying out the analysis with additional piles; so, strengthening of these components has been proposed. The analysis has been carried out after considering the strengthening of the member 0001-404L with adequate strength grout [6] (Fig. 5), the results of which reveal that the member is stressed within the permissible limits. The results of the re-analysis performed after considering the strengthening of the respective chords for joints 0253 and 0257 with adequate strength grout (Fig. 5) reveal that the structural joints 0253 and 0257 are stressed within the permissible limits.

Fig. 5
figure 5

Structural components proposed for grouting (as highlighted)

4 Conclusion and Recommendations

The results of the structural analysis show that in the original condition, even after incorporating the suggested mitigation measures, the jacket structure of the platform did not meet the structural adequacy requirements primarily due to overstressed Row-2 piles and X-brace joints.

In view of the same, it has been contemplated to install four additional piles near Row-2 of the platform. A design-level analysis has been carried out with additional piles proposed to be installed on the platform. The structural adequacy of the platform could be documented for all the considered environmental directions subject to the following mitigation/strengthening measures:

  1. 1.

    Removal of sump and pump casing,

  2. 2.

    Non-consideration of future riser protector on Row-2 of the structure,

  3. 3.

    Installation of additional four 84″ (2.134 m) piles on row-2 of the platform (two each at A2 and B2), and

  4. 4.

    Grouting of primary structural member 0001-404L and primary joints 0253 (Joint Chord member 0248-0249 to be grouted) and 0257 (Joint Chord member 0252-0253 to be grouted)

The additional pile-jacket connection details along with final additional pile penetration below mud line, and members grout properties will be required to be designed while carrying out the detailed engineering. From above, it can be concluded that old-age platforms can be re-qualified with the implementation of appropriate mitigation measures adopted after carrying out detailed nonlinear assessment of the structure. These structures can continue production of hydrocarbons without pressing the need of platform abandonment process or installation of new platforms.