Skip to main content

Shuang 6 Reservoir Development and Storage Design

  • Reference work entry
  • First Online:
Handbook of Underground Gas Storages and Technology in China
  • 579 Accesses

Abstract

This chapter introduces the exploration and development of the Shuang 6 reservoir, the design of the rebuilding of the gas storage facility after the depletion, and the operation of the gas storage facility. The Shuang 6 gas reservoir was put into development in 1980 and was nearly exhausted in 2008, with a total gas production of 51.63 × 108 m3 and a cumulative oil production of 171.25 × 104 t. The natural gas recovery degree was 70%, and the crude oil recovery degree was 24%. The total water invasion volume was 836 × 104 m3, and the water invasion volume accounted for 24% of the hydrocarbon volume. The material balance method was used to deduct the damage caused by the water invasion from the storage capacity. The designed storage capacity was 36 × 108 m3, and the working gas volume was 16 × 108 m3. Since gas injection began in April 2014, the Shuang 6 gas storage facility has injected a cumulative total of 67.2 × 108 m3 and has produced a cumulative total of 25.2 × 108 m3, playing an important role in regional natural gas peak regulation and supply protection.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 799.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Hardcover Book
USD 949.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Xinhua Ma .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2022 Petroleum Industry Press

About this entry

Check for updates. Verify currency and authenticity via CrossMark

Cite this entry

Ma, X. (2022). Shuang 6 Reservoir Development and Storage Design. In: Ma, X. (eds) Handbook of Underground Gas Storages and Technology in China. Springer, Singapore. https://doi.org/10.1007/978-981-33-4734-2_1

Download citation

Publish with us

Policies and ethics