Abstract
Construction equipment management by contractors demonstrates investment efficiency and service performance, which can affect the construction project and corporate performance. Although many studies have considered the components of construction equipment management, project performance and corporate performance, the causal relationships among these components have not been explored to date. This study explores these relationships. The research method included the collection of contractors’ opinions regarding the importance of these factors. Structural Equation Modeling (SEM) was employed to determine the causal relationships among the data. The results indicate four factors of construction equipment management, with their weights of relative importance, affect project and corporate performance. Selection management exhibits the greatest effect (33%); this is followed by operations management (27%), maintenance and repair management (25%), and retirement and replacement management (15%). Regarding the factors for measuring project performance, the quality and time factors were ranked first and second in importance, respectively. The customer factor was the most important factor for describing corporate performance. The findings of this study enable a greater understanding of these causal relationships, providing a starting point for improving the project and corporate procedures of equipment management.
Article PDF
Similar content being viewed by others
Avoid common mistakes on your manuscript.
References
Al-Ghamdi, A. A. (2001). Evaluation of the construction equipment replacement policies of construction contractors in the Eastern Province of Saudi Arabia, Master Thesis, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.
Ali, H. A. E. M., Al-Sulaihi, I. A., and Al-Gahtani, K. S. (2013). “Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia.” Journal of King Saud University-Engineering Sciences, Vol. 25, No. 2, pp. 125–134, DOI: 10.1016/j.jksues.2012.03.002.
Almahmoud, E. S., Doloi, H. K., and Panuwatwanich, K. (2012). “Linking project health to project performance indicators: multiple case studies of construction project in Saudi Arabia.” International Journal of Project Management, Vol. 30, No. 3, pp. 296–307, DOI: 10.1016/j.ijproman.2011.07.001.
Anbhule, Y. R. and Kumthekar, M. B. (2013). “3D equipment management system for highway construction projects: conceptual design.” IOSR Journal of Mechanical and Civil Engineering, Vol. 1, No. 1, pp. 01–03, retrieved at: http://iosrjournals.org/iosr-jmce/papers/sicete(civil)-volume1/1.pdf.
Arbuckle, J. L. (2011). IBM SPSS amoss 20 user’s guide, IBM Corporation, U.S.A.
Babbie, E. (1989). The practice of social research. 5th Ed., Wadsworth Publishing, Belmont, CA.
Bassioni, H. A., Price, A. D. F., and Hassan, T. M. (2005). “Building a conceptual framework for measuring business performance in construction: an empirical evaluation.” Construction Management and Economics, Vol. 23, No. 5, pp. 495–507, DOI: 10.1080/0144619042000301401.
Blundon, G. H. (1980). Comparison of methods for evaluating construction equipment acquisition, Master Thesis, Concordia University, Quebec, Canada.
Cha, H. S. and Kim, C. K. (2011). “Quantitative approach for project performance measurement on building construction in South Korea.” KSCE Journal of Civil Engineering, Vol. 15, No. 8, pp. 1319–1328, DOI: 10.1007/s12205-011-1323-5.
Chan, A. P. C. and Chan, A. P. L. (2004). “Key performance indicators for measuring construction success.” Benchmarking: An International Journal, Vol. 11, No. 2, pp. 203–221, DOI: 10.1108/14635770410532624.
Chan, T. K. and Hiap, P. T. (2012). “A balanced scorecard approach to measuring industry performance.” Journal of Construction in Developing Countries, Vol. 17, No. 1, pp. 23–41, retrived at: http://web.usm.my/jcdc/vol17_s1_2012/Art%202_jcdc17-s1.pdf.
Chedthaisong, T. and Suparsar, S. (2014). The status of industrial machinery and import-export statistics in Thailand, Machinery Intelligence Unit, Iron and Steel Institute of Thailand, retrieved at: http://issuu.com/jssrauction/docs/bitec_20-6-2014.
Cheung, S. O., Suen, H. C. H., and Cheung, K. K. W. (2004). “PPMS: a web-based construction project performance monitoring system.” Automation in Construction, Vol. 13, pp. 361–376, DOI: 10.1016/j.autcon.2003.12.001.
Chovichein, V. (1981). The discounted cost model and application to acquisition and utilization policies of construction equipment, Doctor Thesis, University of Illinois at Urbana-Champaign, Urbana, Illinois, U.S.A.
Dawood, N. (2010). “Development of 4D-based performance indicators in construction industry.” Engineering, Construction and Architectural Management, Vol. 17, No. 2, pp. 210–230, DOI: 10.1108/09699981011024704.
Deng, F. and Smyth, H. (2014). “Nature of firm performance in construction.” Journal of Construction Engineering and Management, Vol. 140, No. 2, 04013040, DOI: 10.1061/(ASCE)CO.1943-7862.0000778.
Diamantopoulos, A. and Siguaw, J. A. (2000). Introduction LISREL: A guide for the uninitiated, Sage Publication London.
El-Mashaleh, M., Edward Minchin, R., Jr., and O’Brien, W. (2007). “Management of construction firm performance using benchmarking.” Journal of Management in Engineering, Vol. 23, No. 1, pp. 10–17, DOI: 10.1061/(ASCE)0742-597X(2007)23:1(10).
El-Mashaleh, M., O'Brien, W., and Minchin, R. (2005). “Construction firm performance and ITutilization.” Construction Research Congress 2005, pp. 1–10, DOI: 10.1061/40754(183)127.
Fan, H., AbouRizk, S., and Kim, H. (2007). “Building intelligent applications for construction equipment management.” Computing in Civil Engineering (2007), pp. 192–199, DOI: 10.1061/40937(261)24.
Fan, H., Kim, H., and Zaiane, O. R. (2006). “Data warehousing for construction equipment management.” Canadian Journal of Civil Engineering, Vol. 33, No. 12, pp. 1480–1489, DOI: 10.1139/l06-108.
Fernandez-Muniz, B., Montes-Peon, J. M., and Vazquez-Ordas, C. J. (2009). “Relation between occupational safety management and firm performance.” Safety Science, Vol. 47, No. 7, pp. 980–991, DOI: 10.1016/j.ssci.2008.10.022.
Gunawardena, N. D. (1992). “Construction equipment-management practices” Annual Transaction of IESL, pp. 58–72, retrieved at: http://iesl.ceylonhost.com/IESL_publications/Civil%20Engineering/Construction%20Engineering%20&%20Management/Construction%20Equipment%20_%20Management%20Practices%20by%20Dr.%20N.D.%20Gunawardena%201992.PDF.
Hair, J. F., Jr., Black, W. C., Babin, B. J., and Anderson, R. E. (2010). Multivariate data analysis, 7th Ed., Person Prentice Hall, NJ.
Hendi, A. (2007). Decision support system for equipment selection in construction projects, Master Thesis, University of Alberta, Edmontn, Alberta, Canada.
Hooper, D., Coughlan, J., and Mullen, M. R. (2008). “Structural equation modelling: guidelines for determining model fit.” Electronic Journal of Business Research Methods, Vol. 6, No. 1, pp. 53–60, retrived at: http://arrow.dit.ie/cgi/viewcontent.cgi?article=1001&context=buschmanart
Horta, I., Camanho, A., and Da Costa, J. (2010). “Performance assessment of construction companies integrating key performance indicators and data envelopment analysis.” Journal of Construction Engineering and Management, Vol. 136, No. 5, pp. 581–594, DOI: 10.1061/(ASCE)CO.1943-7862.0000145.
Ikediashi, D.I., Mendie, A., Achuenu, E., and Oladokun, M. G. (2012). “Key performance indicators of design and build projects in Nigeria.” Journal of human ecology, Vol. 37, No. 1, pp. 37–46, retrived at: http://www.krepublishers.com/02-Journals/JHE/JHE-37-0-000-12-Web/JHE-37-1-000-12-Abst-PDF/JHE-37-1-037-12-2222-Ikediashi-D-I/JHE-37-1-037-12-2222-Ikediashi-D-I-Tt.pdf
Irefin, I. A. (2013). “Effects of project management on the performance of a construction firm in Nigeria.” American international journals of contemporary research, Vol. 3, No. 6, pp. 54–58, retrieved at: http://www.aijcrnet.com/journals/Vol_3_No_6_June_2013/7.pdf.
Isik, Z., Arditi, D., Dikmen, I., and Birgonul, M. (2010). “Impact of resources and strategies on construction company performance.” Journal of Management in Engineering, Vol. 26, No. 1, pp. 9–18, DOI: 10.1061/(ASCE)0742-597X(2010)26:1(9).
Jin, Z., Deng, F., Li, H., and Skitmore, M. (2013). “Practical framework for measuring performance of international construction firms.” Journal of Construction Engineering and Management, Vol. 139, No. 9, pp. 1154–1167, DOI: 10.1061/(ASCE)CO.1943-7862.0000718.
LaBarre, P. and El-adaway, I. (2014). “Project benchmarking: Tool for mitigating conflicts, claims, and disputes through improved performance.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, Vol. 6, No. 1, pp. 04513003, DOI: 10.1061/(ASCE)LA.1943-4170.0000140.
Lucko, G. (2003). A statistical analysis and model of the residual value of different types of heavy construction equipment, Doctor Thesis, Virginia Polytechnic Institute and State University, Blacksburk, Virginia, U.S.A.
Luu, V. T., Kim, S., and Huynh, T. (2008). “Improving project management performance of large contractors using benchmarking approach.” International Journal of Project Management, Vol. 26, No. 7, pp. 758–769, DOI: 10.1016/j.ijproman.2007.10.002.
Nudurupati, S., Arshad, T., and Turner, T. (2007). “Performance measurement in the construction industry: An action case investigating manufacturing methodologies.” Computers in Industry, Vol. 58, No. 7, pp. 667–676, DOI: 10.1016/j.compind.2007.05.005.
Nunnally, J. C. (1967). Psychometric theory, McGraw-Hill, New York, NY.
Pedersen, E. R. G. and Sudzina, F. (2012). “Which firms use measures?: Internal and external factors shaping the adoption of performance measurement systems in Danish firms.” International Journal of Operations & Production Management, Vol. 32, No. 1, pp. 4–27, DOI: 10.1108/01443571211195718.
Pongpeng, J. and Liston, J. (2003). “Tender evaluation procedures: An investigation of the Thai construction industry.” Proceedings of the fourth regional symposium on infrastructure development in civil engineering (RSID4), 3-5 April 2003, Bangkok, Thailand, pp. 891–900.
Pradhananga, N. and Teizer, J. (2013). “Automatic spatio-temporal analysis of construction site equipment operations using GPS data.” Automation in Construction, Vol. 29, pp. 107–122, DOI: 10.1016/j.autcon.2012.09.004.
Prasertrungruang, T. and Hadikusumo, B. H. W. (2009). “Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors.” Journal of Construction Engineering and Management, Vol. 135, No. 10, pp. 939–947, DOI: 10.1061/(ASCE)CO.1943-7862.0000076.
Prasertrungruang, T. and Hadikusumo, B. H. W. (2007). “Heavy equipment management practices and problems in Thai highway contractors.” Engineering, Construction and Architectural Management, Vol. 14, No. 3, pp. 228–241, DOI: 10.1108/09699980710744881.
Ramirez, R., Alarcon, L., and Knights, P. (2004). “Benchmarking system for evaluating management practices in the construction industry.” Journal of Management in Engineering, Vol. 20, No. 3, pp. 110–117, DOI: 10.1061/(ASCE)0742-597X(2004)20:3(110).
Robinson, H. S., Anumba, C. J., Carrillo, P. M., and Al-Ghassani, A. M. (2005). “Business performance measurement practices in construction engineering organizations.”, Measuring Business Excellence, Vol. 9 No. 1, pp. 13–22, DOI: 10.1108/13683040510588800.
Sarhan, S. and Fox, A. (2013). “Performance measurement in the UKconstruction industry and its role in supporting the application of lean construction concepts.” Australasian Journal of Construction Economics and Building, Vol. 13, No. 1, pp. 23–35, DOI: 10.5130/ajceb.v13i1.3069.
Schermelleh-Engell, K. and Moosbrugger, H. (2003). “Evaluating the fit of structural equation models:tests of significance anddescriptive goodness-of-fit measures.” Methods of Psychological Research-Online 2003, Vol. 8, No. 2, pp. 23–74, retrived at: http://www.dgps.de/fachgruppen/methoden/mpr-online/issue20/art2/mpr130_13.pdf
Schexnayder, C. J., Jr. (1980). Heavy construction equipment replacement economics, Doctor Thesis, Purdue University, West Lafayette, Indiana, U.S.A.
Schumacker, R. E. and Lomax, R. G. (2010). A beginner’s guide to structural equation modeling, 3rd Ed., Taylor and Francis Group, New York, NY.
Skibniewski, M. J. and Ghosh, S. (2009). “Determination of key performance indicators with enterprise resource planning systems in engineering construction firms.” Journal of Construction Engineering and Management, Vol. 135, No. 10, pp. 965–978, DOI: 10.1061/(ASCE)0733-9364(2009)135:10(965).
SPSS training (1998). SPSS training series by ITservices, Queensland University of Technology, Brisbane, Australia.
Tajeen, H. and Zhu, Z. (2014). “Image dataset development for measuring construction equipment recognition performance.” Automation in Construction, Vol. 48, pp. 1–10, DOI: 10.1016/j.autcon.2014.07.006.
Tatari, O. and Skibniewski, M. (2006). “Integrated agent-based construction equipment management: Conceptual design.” Journal of Civil Engineering and Management, Vol. 12, No. 3, pp. 231–236, DOI: 10.1080/13923730.2006.9636397.
Tavakoli, A., Masehi, J. J., and Collyard, C. S. (1990). “Fleet: equipment management system.” Journal of Management in Engineering, Vol. 6, No. 2, pp. 211–220, DOI: 10.1061/(ASCE)9742-597X(1990)6:2(211).
Toor, S. and Ogunlana, S. O. (2010). “Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects.” International Journal of Project Management, Vol. 28, No. 3, pp. 228–236, DOI: 10.1016/j.ijproman.2009.05.005.
Tsimberdonis, A. I. and Murphree, E. L., Jr. (1994). “Equipment management through operational failure costs.” Journal of Construction Engineering and Management, Vol.120, No. 3, pp. 522–535, DOI: 10.1061/(ASCE)0733-9364(1994)120:3(522).
Ugwu, O. O. and Haupt, T. C. (2007). “Key Performance Indicators and assessment methods for infrastructure sustainability: A South African construction industry perspective.” Building and Environment, Vol. 42, No. 2, pp. 665–680, DOI: 10.1016/j.buildenv.2005.10.018.
Ullman, J. B. (2001). “Structural equation modeling: Reviewing the basics and moving forward.” Journal of Personality Assessment, Vol. 87, No. 1, pp. 35–50, DOI: 10.1207/s15327752jpa8701_03.
Yang, H., Yeung, J. F. Y., Chan, A. P. C., Chiang, Y. H., and Chan, D. W. M. (2010). “A critical review of performance measurement in construction.” Journal of Facilities Management, Vol. 8, No. 4, pp. 269–284, DOI: 10.1108/14725961011078981.
Yang, L., Chen, J., and Wang, H. (2012). “Assessing impacts of information technology on project success through knowledge management practice.” Automation in Construction, Vol. 22, pp. 182–191, DOI: 10.1016/j.autcon.2011.06.016.
Yeung, J., Chan, A., Chan, D., Chiang, Y., and Yang, H. (2013). “Developing a benchmarking model for construction projects in Hong Kong.” Journal of Construction Engineering and Management, Vol. 139, No. 6, pp. 705–716, DOI: 10.1061/(ASCE)CO.1943-7862.0000622.
Yeung, J. F., Chan, A. P., and Chan, D. W. (2009). “Developing a performance index for relationship-based construction projects in Australia: Delphi study.” Journal of Management in Engineering, Vol. 25, No. 2, pp. 59–68, DOI: 10.1061/(ASCE)0742-597X(2009)25:2(59).
Yip, H., Fan, H., and Chiang, Y. (2014). “Predicting the maintenance cost of construction equipment: Comparison between general regression neural network and Box–Jenkins time series models.” Automation in Construction, Vol. 38, pp. 30–38, DOI: 10.1016/j.autcon.2013.10.024.
Yu, I., Kim, K., Jung, Y., and Chin, S. (2007). “Comparable performance measurement system for construction companies.” Journal of Management in Engineering, Vol. 23, No. 3, pp. 131–139, DOI: 10.1061/(ASCE)0742-597X(2007)23:3(131).
Zavadskas, E. K., Vilutiene, T., Turskis, Z., and Saparauskas, J. (2014). “Multi-criteria analysis of projects' performance in construction.” Archives of Civil and Mechanical Engineering, Vol. 14, No. 1, pp. 114–121, DOI: 10.1016/j.acme.2013.07.006.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Samee, K., Pongpeng, J. Structural equation model for construction equipment management affecting project and corporate performance. KSCE J Civ Eng 20, 1642–1656 (2016). https://doi.org/10.1007/s12205-015-0717-1
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-015-0717-1