Abstract
Deteriorated water mains fail frequently causing service disruption and other inconvenience to the customers. Therefore, the utilities must conduct repair, rehabilitation and/or replacement in a timely manner to satisfy the needs of the customers. To succeed in this process the utilities must also consider the economics of the water main maintenance. The proposed methodology presents not only a method for the optimal maintenance but also a practical way of conducting it by providing the economical time period of maintenance. A method is also presented for analyzing the accuracy of proportional hazards models (PHMs) in forecasting break times and estimating the timing for economical replacement of water mains. A survival probability criterion for the forecasting of the pipe breaks was determined in order to minimize the prediction errors of the PHMs. Subsequently, the criterion was used to estimate the upper and lower bounds of future break times of a water main using the survival functions derived from the PHMs. Two General Pipe Break Prediction Models (GPBMs) for a pipe were estimated for each of the two series of the recorded and predicted, upper and lower bound break times. The threshold break rate (TBR) was coupled with the two GPBMs for each pipe and solved for time to give the upper and lower bounds of the economical replacement time period.
Article PDF
Similar content being viewed by others
Avoid common mistakes on your manuscript.
References
Carrión A, Solano H, Gamiz ML, Debón A (2010) Evaluation of the reliability of a water supply network from right-censored and left-truncated break data. Water Resour Manage 24:2917–2935
Christodoulou S, Deligianni A (2010) A neurofuzzy decision framework for the management of water distribution networks. Water Resour Manage 24:139–156
Christodoulou S, Agathokleous A, Charalambous B, Adamou A (2010) Proactive risk-based integrity assessment of water distribution networks. Water Resour Manage 24:3715–3730
Clark RM, Stafford CL, Goodrich JA (1982) Water distribution systems: a spatial and cost evaluation. J Water Resour Plan Manage ASCE 108(3):243–256
Cox DR (1972) Regression models and life tables. J R Stat Soc 34(B):187–220
Dandy GC, Engelhardt M (2001) Optimal scheduling of water pipe replacement using genetic algorithms. J Water Resour Plan Manage ASCE 127(4):214–223
de Schaetzen W, Randall-Smith MJ, Savic D, Walters GA (1998) A Genetic algorithm approach for rehabilitation in water supply systems. In: Proc. Int. Conf. on Rehabilitation Technol. for Water Industry, pp 1–11
Deb AK, Hasit YJ, Grablutz FM, Herz RK (1998) Quantifying future rehabilitation and replacement needs of water mains. AWWA Research Foundation
Halhal D, Walters GA, Ouzar D, Savic DA (1997) Water network rehabilitation with a structured messy genetic algorithm. J Water Resour Plan Manage ASCE 123(3):137–146
Kim JH, Mays LW (1994) Optimal rehabilitation model for water-distribution systems. J Water Resour Plan Manage ASCE 120(5):674–692
Kleiner Y, Rajani B (2001) Comprehensive review of structural deterioration of water mains: statistical models. Urban Water 3:131–150
Kleiner Y, Adams BJ, Rogers JS (1998) Selection and scheduling of rehabilitation alternatives for water distribution systems. Water Resour Res 34(8):2053–2061
Lansey KE, Basnet C, Mays LW, Woodburn J (1992) Optimal maintenance scheduling for water distribution systems. Civ Eng Syst, E & FN Spon, Lond 9:211–256
Loganathan GV, Park S, Sherali HD (2002) A threshold break rate for pipeline replacement in water distribution systems. J Water Resour Plan Manage ASCE 128(4):271–279
Male JW, Walski TM, Slutsky AH (1990) Analyzing water main replacement policies. J Water Resour Plan Manage ASCE 116(3):362–374
Park S, Loganathan GV (2002) Optimal pipe replacement analysis with a new pipe break prediction model. J Korean Soc Water Wastewater, KSWW 16(6):710–716
Park S, Kim JW, Agbenowosi N, Jun H (2007) A methodology to estimate economically optimal replacement time interval of water distribution pipes. Water Sci Technol Water Supply 7(5):149–155
Park S, Jun H, Agbenowosi N, Kim BJ, Lim K (2011) The proportional hazards modeling of water main failure data incorporating the time-dependent effects of covariates. Water Resour Manage 25(1):1–9
Pinto J, Varum H, Bentes I (2010) A theory of vulnerability of water pipe network (TVWPN). Water Resour Manage 24:4237–4254
SAS Institute Inc. (2009). http://www.sas.com/index.html
Shamir U, Howard CDD (1979) An analytic approach to scheduling pipe replacement. J Am Water Works Assn 71(5):248–258
Walski TM, Pelliccia A (1982) Economic analysis of water main breaks. J Am Water Works Assn 74(3):140–147
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Park, S. Estimating the Timing of the Economical Replacement of Water Mains Based on the Predicted Pipe Break Times Using the Proportional Hazards Models. Water Resour Manage 25, 2509–2524 (2011). https://doi.org/10.1007/s11269-011-9823-0
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11269-011-9823-0