Abstract
The paper presents a framework for the vulnerability analysis to assess seismic risk for the Republic of Georgia. Firstly, detailed inventory map of elements at risk was created. Here elements at risk are comprised of buildings and population. The grid of 0.025° size was created to summarize building and population data into the grid cells for further analysis. The custom programming script was created that summarizes the following information for each grid cell: the total number of buildings, total area of buildings, total population, total number of buildings per each taxonomy class and total area of buildings for each taxonomy class. Secondly, seismic hazard maps were calculated based on modern approach of selecting and ranking global and regional ground motion prediction equation for region. Thirdly, on the bases of empirical data that was collected for some earthquake intensity based vulnerability study were completed for Georgian buildings. Finally, probabilistic seismic risk assessment in terms of structural damage and casualties were calculated for the territory of Georgia for 2.8 km grid cells using obtained results. This methodology gave prediction of damage and casualty for a given probability of recurrence, based on a probabilistic seismic hazard model, population distribution, inventory, and vulnerability of buildings.
Access provided by Autonomous University of Puebla. Download conference paper PDF
Similar content being viewed by others
Keywords
- Seismic Hazard
- Peak Ground Acceleration
- Seismic Risk
- Seismic Hazard Assessment
- Probabilistic Seismic Hazard
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.
1 Introduction
Risks of natural hazards caused by natural disaster are closely related to the development process of society. Disasters pose hazard to sustainable development of the country. Out of the world populations, 75 % live in places prone of various disasters such as earthquakes, floods, hurricane, drought etc. A recent review of worldwide natural hazard losses during 2012 has identified 905 natural disasters, resulting in 96,000 deaths, $170 billion in economic losses, and $70 billion in insured losses [1].
Upward trend of disaster’s intensity and frequency are observed worldwide (e.g. [2]) and are also discussed on the national level (e.g. [3, 4]). It is the result of the urbanization and rapid increase of the density of the population, global climate change and economic globalization, environmental deterioration etc. The natural disasters risk occurs when the hazardous hydro-meteorological, geological and other phenomena interact with physical, social, economic and ecological factors of vulnerable social and environmental infrastructure.
The high level of natural disasters in many countries makes necessary to work out the national programs and strategy. The main goal of these programs is to reduce the natural disasters risk and caused losses. Risk mitigation is the cornerstone of the approach to reduce the nation’s vulnerability to disasters from natural hazards. Therefore, proper investigation and assessment of natural hazards and vulnerability of the element at risk to hazards is very important for an effective and proper assessment of risk. This paper issues a call for advance planning and action to reduce natural disaster risks, notably seismic risk through the investigation of vulnerability and seismic hazard for Georgia.
Georgia is prone to multiple natural hazards, the most dangerous and devastating of which are strong earthquakes. By the index of disaster risk, Georgia relates to the countries with medium and high level risk [5]. So, the natural hazard, notably seismic hazard in Georgia have to be considered as a standing negative factor in the development process of the country. Such approach implies the necessity of more active actions by all possible means to reduce the seismic risk at each level and maintain the sustainable economic development of the country. Moreover, the risk level has not been quantified so far in terms of different elements at risk and with respect to vulnerability of corresponding elements at risk.
The importance of arising problems stimulates an active investigation of vulnerability of elements at risk and seismic hazard for seismic risk reduction. The attempt has been approached within the framework of the project “EMME – Earthquake Model for Middle East Region: Hazard, Risk Assessment, Economic and Mitigation”.
2 Seismotectonic and Seismicity of Georgia
Georgia, the southernmost part of Eastern Europe, occupies the western part of the South Caucasus. The main morphological units of Georgia are the mountain ranges of the Greater and Lesser Caucasus separated by the Black Sea-Rioni (Colkhis) and Kura (Mtkvari)-South Caspian intermountain troughs.
Recent geodynamics of Georgia and adjacent territories of the Black Sea-Caspian Sea region, as a whole, are determined by its position between the still-converging Eurasian and Africa-Arabian plates. The geometry of tectonic deformations in the region is largely determined by the wedge-shaped rigid Arabian block intensively intended into the relatively mobile Middle East-Caucasian region. In the first place, it influenced the configuration of main compressional structures developed to the north of the Arabain wedge (indentor) – from the Periarabicophiolite suture and main structural lines in East Anatolia to the Lesser Caucasus, on the whole, and its constituting tectonic units including the Bayburt-Karabakh and Talysh fold-thrust belts. All these structural morphological lines have clearly expressed arcuate northward-convex configuration reflecting the contours of the Arabian Block.
Related tectonic activities caused moderate seismicity in the region. Three principal directions of active faults compatible with the dominant near N–S compressional stress produced by northward displacement of the Arabian plate can be distinguished in the region—one longitudinal (WNW–ESE or W–E) and two transversal (NE–SW and NW–SE).
All historical and instrumental earthquakes observed (4.5 < Ms < 7.0) were located along the fault systems of the Greater and Lesser Caucasus and the intermountain depressions. The maximum magnitude of observed earthquakes is Ms = 7.0. The moderate earthquakes reflect the regional tectonics that are largely determined by the position of the Caucasus range between the still-converging Eurasian and Africa-Arabian lithosphere plates. By this classification, the southern slopes of Greater Caucasus are characterized by thrust and thrust strike slips, while the Javakheti upland is mostly characterized by strike-slip faults [6]. Georgia is vulnerable to earthquake hazards. A seismic risk is very high here. A single large earthquake, however, can cause far more damage than the average estimate from other natural hazards. Direct losses for residential houses and infrastructure damages resulting just from the Racha earthquake (29 April 1991) in Georgia (with more than 200 deaths) was assessed in the order of 10 billion rubles (as of 1991, approximately 5.5 billion USD at commercial exchange rate and 16 billion USD at official course) [6]. So, to estimate potential losses is vital for the region. Annualized earthquake loss addresses two components of seismic risk: the probability of ground motion and the consequences of ground motion on different element at risk. Some study carried out to combine seismic hazard with the value of the building inventory in the country to provide estimations of economic losses and casualty from earthquakes in Georgia. Figure 20.1 presents seismicity with earthquake magnitude Ms more than 4.5 and active faults of Georgia.
3 Inventory
In risk assessment, one important parameter is the inventory of elements at risk. In urban area, elements at risk include buildings, lifeline systems, population, socio-economic activities. Extensive and comprehensive collection of element at risk inventories is vital for estimation of losses during the earthquake.
The following GIS layers have been collected from the different sources and united in the centralized geo database: administrative division of country (regions, municipalities, election districts and precincts, cadastral zones, sectors and quarters); base topographic map layers (hydrography road network, elevation); scanned topographical and geological maps; satellite and aerial imagery; settlements and population data, and data on buildings.
The grid of 0.025° (2.8 km) size was created to summarize building and population data into the grid cells for further analysis with the seismic hazard modeling software ELER v3 [7].
Collected buildings GIS layer contains attributive data on building age, material, functionality, and number of floors. This quality and reliability of the data was not sufficient for arranging building into the predefined taxonomy classes, so we conducted additional inventory of the buildings using detailed resolution aerial imagery, building photos (where available) and expert judgment about the known building types in different regions of Georgia. As a result, all buildings of Georgia were assigned to taxonomy classes according to Lagomarsino and Giovinazzi [8] and we obtained a GIS database of classified buildings. Population data for each grid cell was obtained from the basis of the 2007 general population census, GEOSTAT [9]. Population value from the census data was assigned to each settlement point on the GIS map. Summarizing the population into the 2.8 km grid cells using settlement points did not give correct information on population distribution, since in most cases one settlement is located in more than one grid cell, so we needed to distribute the population to the buildings or residential quarters for more exact calculation. For this purpose, the GIS layer of residential quarters (quarter polygons) was used, which models the population distribution fairly well for the whole country. Using GIS analytical tools, we automatically assigned each residential quarter to the nearest settlement point that contained population data (using settlement unique codes). Then the population of each settlement point was distributed among its quarter polygons with the proportion of polygon area (bigger quarters were assigned higher population value). The population for each grid cell was calculated by summarizing populations of each residential quarter falling into the grid cell; if the quarter was located in more than one cell, its population was distributed to the cells by area proportion. Finally, the custom programming script was created that summarizes the following information for each grid cell: the total number of buildings, total area of buildings, total population, total number of buildings per each taxonomy class and total area of buildings for each taxonomy class (Fig. 20.2). This data constituted the input for the ELER software, for further calculation of risk.
4 Seismic Hazard Assessment
Seismic hazard assessment for Georgia had been a subject for several investigations in various international and national projects that were published in international and local literature. Namely, Probabilistic Seismic Hazard Assessment (PSHA) for the Caucasus had been undertaken in the frame of the Global Seismic Hazard Assessment Program GSHAP [10]. The Seismic Hazard maps were re-calculated in 2002–2007 during operation of the International Science and Technology Centre (ISTC) project: “Caucasian Seismic Information System” ISTC A651 (CauSIN). The assessment of seismic hazard for the Caucasus, based on the Cornell approach, namely computer program SEISRISK III after Bender and Perkins [11], was used for compilation of the set of maps for macroseismic intensity and peak ground acceleration (for the 50 year exposure time and 2 %, 5 %, 10 % probability of exceeding). Similar issues were considered by several authors in individual studies [12–16]. Today in Georgia are used a normative seismic hazard map expressing the severity of impact by the peak ground acceleration and the intensity (MSK 64) for a 2 % probability of exceedence in 50 years. A generalization of this map to seismic hazard map that was calculated in the frame of the GSHAP project [10] showing considerable differences resulting from generalization. Taking into account that the GSHAP seismic hazard map for the Caucasus region is calculated for a 10 % probability of exceedence in 50 years, these differences became even larger. The Georgian normative seismic hazard map shows a lower susceptibility than the seismic hazard map recently calculated by Slejko et al. [13]. It became evident that there were gaps in seismic hazard assessment and normative seismic hazard maps needed a careful recalculation.
The methodology for the probabilistic assessment of seismic hazard includes the following steps: produce comprehensive catalogue of historical earthquakes (up to 1900) and the period of instrumental observations with uniform scale of magnitudes; produce models of seismic sources zone (SSZ) and their parameterization (estimate recurrence law, the maximum magnitude, the distribution of earthquakes depth and nature of the movement.); develop appropriate GMPE ground motion prediction equation models; develop seismic hazard curves for spectral amplitudes at each period and maps in digital format.
The new seismic catalog of Georgia: Using a complete catalog is the most important to determine seismic hazard analysis in the region. The content of work package WP1 of EMME project involved the compilation of a new earthquake catalog for the Middle East region, including Georgia. In this work, there were two main goals: (1) Drafting a new catalog of historical earthquakes of Georgia and (2) Compilation of new instrumental seismic catalog of Georgia. In the process of compiling the level of the magnitude completeness was limited to: Ms ≥ 2.9 or Mw ≥ 4.0.
The main principles for compiling a catalogue of historical earthquakes are considered in Varazanashvili et al. [17]. The study and detailed analysis of these original documents and researches have allowed us to create a new catalogue of historical earthquakes of Georgia from 1250 BC to 1900 AD. The method of the study is based on a multidisciplinary approach, i.e. on the joint use of methods of history and paleoseismology, archeoseismology, seismotectonics, geomorphology, etc. A new parametric catalogue of 44 historic earthquakes of Georgia has been obtained and a full “descriptor” of all the phenomena described in it.
After 1962, the seismic network in the Caucasus and in Georgia improved, but inaccurate velocity models do not give good results. To reveal the best velocity model the hypocenter parameters of the earthquake were calculated, using the HYPO-71 program [18]. More detail this work are described in Tsereteli et al. [16]. During the period 1963–2002, parameters of about 120 earthquakes were re-calculated for Georgia. The difference between obtained and existing locations of individual earthquakes was sometimes more than 20 km. Thus, after the determination or specification of the basic parameters of earthquakes, we present a new catalog of historical earthquakes (pre-1900) of Georgia and the refined instrumental earthquake catalog (1900–2009) of Georgia.
Seismic Sources (SS): The identification of area SSZ was obtained on the bases of structural geology, parameters of seismicity and seismotectonics. In determining the SS, the slope of the appropriate active fault plane, the width of the dynamic influence of the fault, power of seismoactive layer are taken into account. The relationship of strong earthquakes with this fault is set based on data on the position and orientation of the earthquake sources, and the character of motion in them: the position of the hypocenter; data on direction of the first isoseismals; information about the orientation of the scattering area of forshocks and aftershocks; materials on the focal mechanism, the position of the seismogenic landslides and seismodislocations. Each SSZ was defined with the parameters: the geometry, the percentage of focal mechanism, predominant azimuth and dip angle values, activity rates, maximum magnitude, hypocenter depth distribution, lower and upper seismogenic depth values.
Ground motion prediction equation models: Data bases of strong motion are very poor for Georgian region, especially for strong earthquakes with MS ≥ 5 that is very important from engineering point of view. Quite many works have done in the Caucasus to estimate this equation [19–21], but because of poor data the desired result were not given. Some attempt was to complete the database with the data from the tectonically similar region (Caucasus, north-west Turkey, central Italy and others) to derive more accurate ground motion prediction equation GMPE [12, 13].
To capture epistemic uncertainty in GMPE in different regions and tectonic regimes, a selection of a set of appropriate GMPEs (candidate GMPE) is required. For that, the number of selected GMPEs is kept as small as possible, but enough to capture the uncertainty. The selected GMPEs should be robust enough to cover a wide range of magnitudes, distances and frequencies. The Next Generation Attenuation project [22] developed a series of GMPEs intended for application to geographically diverse regions (including Turkey and Caucasus). Together with NGAs GMPE models by us were further considered European and regional models. From these the candidate GMPEs for shallow active crustal regions are collected and they are subjected to a further elimination based on the criteria proposed in Cotton et al. [23] [24]. Accelerograms from Turkey, Iran, Georgia, Armenia, Pakistan and Jordan were collected in the EMME databases that were used for ranking and selecting candidate GMPEs using the data-driven testing procedure proposed by Scherbaum et al. [25, 26] and Kale and Akkar [27]. Proceeding from this analysis, GMPEs [28–31] were used with equal weights in the logic tree combination in the seismic hazard calculation [24].
On the basis of obtained area seismic sources, the probabilistic seismic hazard maps were calculated showing peak ground acceleration (PGA) and spectral accelerations (SA) at 0.2, 1 s periods for 10 % probability and 2 % probability in 50 years using selected GMPEs correspondingly for Rock (Vs = 760 m/s) and soil (Vs = 300 m/s). Seismic hazard (SH) calculation has been performed with two software OpenQuake [42] and EZFRISK [43]. They are used the standard methodology for probabilistic seismic hazard analysis. Both of them gave equal value of SH for Georgia. Results some of them are presented in Figs. 20.3 and 20.4.
5 Vulnerability
The Vulnerability Module quantifies the vulnerability of the assets subjected to the seismic hazard. Combination of the vulnerability with the value of the affected assets gives possibility to estimate total direct losses in physical terms from earthquake (DL). Collected inventory map of element at risk allow estimation vulnerability just for buildings for the territory of Georgia. So available data just can show a picture of the consequences in terms of direct damages caused mainly on infrastructure. For any developing country, the influence of DL on national economies is important. So, the vulnerability analysis of building trough the country can works as proxy for vulnerability at a large of a country
A review of existing literature in the assessment of risk shows the big gaps in understanding of vulnerability for Georgia. There was not such clear definition of vulnerability as presented by Lagomarsino and Giovinazzi [8]. In particular, there is neither a vulnerability definition with respect to the individual element at risk for the territory of Georgia. Very often in seismic risk assessment, structural engineers use the so-called grade of sensitivity of damage [15, 32, 44, 45] or the vulnerability index [33, 34], which is defined as a relationship between the hazard intensity and the degree of loss. There were attempts to calculate the economic loss expressed in deciles using the technique presented in Dilley et al. [35], Tsereteli [36, 37], Chelidze et al. [38], but the obtained maps were very approximative due to the very limited amount of data available. The first step was done in Varazanashvili et al. [6] for the assessment of the historical and present vulnerabilities for six types of natural hazards (drought, hurricane, hail, frost, flash floods and earthquakes).
In the frame of EMME project was possible to develop intensity based vulnerability for Georgian buildings. The European building taxonomy classification proposed by Lagomarsino et al. [8] were used and taxonomy classification was done for buildings with available data on the bases of building information and aerial photos. On the bases of empirical data that was collected for Racha earthquake (Ms = 6.9) on 29 April of 1991 and Tbilisi earthquake (Ms = 4.6) on 25 April of 2002 some intensity based vulnerability study were completed. These records do not include information about the building height. For this, according to the actual observable inventory and expert opinion the following assumptions are made: simple stone are consider as mid-rise M3M; Pre code masonry reinforced concrete rc floors are considered as low rise M6LPC; MC masonry rc floors are consider as mid-rise M6LMC. Also industrial types of building like mid-rise large panel buildings RC2PM that do not have analog in European buildings were investigated. Comparison of obtained data with the data proposed by Lagomarsino and Giovinazzi [8] gave us the possibility to develop the regional vulnerability factors for these typologies. For high-rise large panel buildings RC2PH the influence of number of floors based on experts judgment have been taken into account. Obtained results are presented in Table 20.1.
The vulnerability for large block mid-rise RC2BM and high-rise RC2BH buildings were developed on the data bases of the same house in Irkutsk [33] on the bases of experts’ judgment. Results are presented in Table 20.2. For building typologies three classes of height have been considered (L = low-rise, M = mid-rise, H = high-rise) differently defined in terms of floor numbers for masonry (L = 1–2, M = 3–5, H ≥ 6) and reinforced concrete buildings (L = 1–3, M = 4–7, H ≥ 8).
Developed regional vulnerability applied to the vulnerability classification by Lagomarsino and Giovinazzi [8] for masonry and masonry rc floors typology (M3, M4, M6). Other is not changed.
For verifying our results, we calculated the seismic risk in terms of building damage and causalities using software ELER for Racha and Tbilisi earthquakes considering the source as reverse faults using selected GMPEs. There are quite good agreements with calculated and empirical value for damage distribution. D4 + D5. D4 + D5 damage for Racha earthquake was 4,459 from empirical data. Using obtained vulnerability model, calculated D4 + D5 damage is 4,074. Empirical value of D3 damage for Racha earthquake is 11,694 and calculated D3 is 16,013. The same comparison were done for Tbilisi earthquake. The empirical value of D4 + D5 damage is 200 and the calculated value is 402. Empirical value of D3 damage for Tbilisi earthquake is 4,996 and calculated D3 is 3,157. This allows us to conclude that our estimations of vulnerability are good enough.
For estimation of casualty for Racha and Tbilisi earthquakes, we used Coburn and Spence [39], Samardjieva and Badal [40], Bramerini et al. [41]. Calculation values obtained by Coburn and Spence [39] gave the estimations that were close to empirical data. In this methodology, casualty estimations are based on the structural damage levels D4 and D5.
6 Seismic Risk
Probabilistic seismic risk assessment in terms of structural damage and casualties were calculated for the territory of Georgia for 2.8 km grid cells using obtained results. This methodology gave prediction of damage and casualty for a given probability of recurrence, based on a probabilistic seismic hazard model, population distribution, inventory and vulnerability of buildings. ELER software [7] was used for this calculation. The approach used in damage estimation is to obtain a normally distributed cumulative damage probability for each building type. The damage probability distribution is a function of each building’s vulnerability and ductility parameters [8]. Figures 20.5 and 20.6 illustrate the structural damage distribution for probabilistic seismic map (in terms of PGA) for 10 % probability of exceedence in 50 years for soil and probabilistic seismic map for 2 % probability of exceedence in 50 years for soil correspondingly. Information from this calculation provides quantitative bases for the prioritization of the risk mitigation activities.
7 Conclusions
The compilation of inventory maps, seismic hazard and vulnerability are definitely the pre-requisite for solution of the final task-risk management and reduction vulnerability of the country. The review of international and local literature according to risk assessment for Georgia, however, clearly showed lack of knowledge in vulnerability and seismic hazard assessment. Due to this, some attempts were made to fill these gaps towards an enhanced risk management in Georgia:
-
Inventory map of element at risk (building and population) was created in GIS for the territory of Georgia except occupied regions (Abkhazia and South Ossetia).
-
New probabilistic seismic hazard map in terms of PG and SA (at period 0.2 and 1 s) were calculated using modern approaches developed in the frame of EMME project.
-
Intensity based vulnerability for the buildings that can be considered as proxy for vulnerability at large were developed in Georgia.
-
Finally, an attempt was made to assess probabilistic seismic risks emerging in terms of structural damage and casualties for the territory of Georgia.
On the basis of these results it is possible to create a system indicating earthquake vulnerability and risk for Georgia and its particular regions/communities also. This will enable the managing agencies to carry out the effective policy of advance planning and action to reduce seismic risk through the development of resilient cities. The major obstacle in disaster management in Georgia is the absence of active and powerful national agencies that will work in systematic manner for assessing archiving, mapping, monitoring, predicting managing of all catastrophic events. GIS Mapping of seismic risk in Georgia can be considered as the early warning tool for long-term disaster preparedness of national and local authorities The presented work can contribute to a reduction of disaster losses in Georgia and will foster future efforts of harmonization of risk management strategies in the country.
References
Munich Re (2012) Topics Geo natural catastrophes 2011: analyses, assessments, positions. Munich Reinsurance Company, Munich. http://preventionweb.net/go/17345
Swiss Re (2012) Sigma 2/2012: natural catastrophes and man-made disasters in 2011. Swiss Re, Zurich. http://media.swissre.com/documents/sigma2_2012_en.pdf
Downton M, Miller J, Pielke R (2005) Reanalysis of US national weather service flood loss database. Nat Hazards Rev 6:13–22
Barredo J (2007) Major flood disasters in Europe: 1950–2005. Nat Hazards 42(1):125–148
EM-DAT (2006) The OFDA/CRED international disaster database. Universite Catholique de Louvain-Brussels- Belgium. http://www.emdat.be
Varazanashvili O, Tsereteli N, Amiranashvili A, Tsereteli E, Elizbarashvili E, Dolidze J, Qaldani L, Saluqvadze M, Adamia S, Arevadze N, Gventsadze A (2012) Vulnerability, hazards and multiple risk assessment for Georgia. Nat Hazards 64(3):2021–2056
Hancilar U, Tuzun C, Yenidogan C, Erdik M (2010) ELER software – a new tool for urban earthquake loss assessment. Nat Hazards Earth Syst Sci 10:2677–2696
Lagomarsino S, Giovinazzi S (2006) Macroseismic and mechanical models for the vulnerability and damage assessment of current buildings. Bull Earthq Eng 4:415–443
GEOSTAT (2007) Population. GDP and other indicators of national accounts. National Statistics Office of Georgia. http://geostat.ge/index.php?action=page&p_id=116&lang=eng
Balassanian S, Ashirov T, Chelidze T, Gassanov A, Kondorskaya N, Molchan G, Pustovitenko B, Trifonov V, Ulomov V, Giardini D, Erdik M, Ghafory-Ashtiany M, Grunthal G, Mayer-Rosa D, Schenk V, Stucchi M (1999) Seismic hazard assessment for the Caucasus test area. Annali di Geof 42(6):1139–1164
Bender B, Perkins DM (1987) Seisrisk III: a computer program for seismic hazard estimation. US Geol Surv Bull 1772:1–48
Smit P, Arzoumanian V, Javakhishvili Z, Arefiev S, Mayer-Rosa D, Balassanian S, Chelidze T (2000) The digital accelerograph network in the Caucasus. Bull, Open-File Reptvol 98, no 16, Earthquake hazard and seismic risk reduction. Kluwer Academic Publishers, Dordrecht, pp 109–118
Slejko D, Javakhishvil Z, Rebez A, Santulin M, Elashvili M, Bragato PL, Godoladze T, Garcia J (2008) Seismic hazard assessment for the Tbilisi test area (eastern Georgia). Boll Geof Teor Appl 49(1):37–58
Varazanashvili O, Tsereteli N (2010) Seismic situation’s probability prediction in Great Caucasus during the period 2005–2025. J Seismol Earthq Eng 12(1):1–11
Tsereteli N, Varazanashvili O, Arabidze V, Mukhadze T, Arevadze N (2011) Seismic risk assessment for Tbilisi – new approaches. In: Avagyan A, Barry DL, Coldewey WG, Reimer DWG (eds) Stimulus for human and societal dynamics in the prevention of catastrophes, vol 80. IOS Press, Amsterdam, pp 109–130
Tsereteli N, Tanircan G, Safak E, Varazanashvil O, Chelidze T, Gvencadze A, Goguadze N (2012) Seismic hazard assessment for Southern Caucasus—Eastern Turkey energy corridors: the example of Georgia. In: Barry DL, Coldewey WG, Reimer DWG, Rudakov DV (eds) Correlation between human factors and the prevention of disasters, vol 94. IOS Press, Amsterdam, pp 96–111
Varazanashvili O, Tsereteli N, Tsereteli E (2011) Historical earthquakes in Georgia (up to 1900): source analysis and catalogue compilation. Pub Hause MVP, Tbilisi
Lee W, Larh S (1975) HYPO-71 (Revised), a computer program for determining hypocenter, magnitude and first motion patting of local earthquakes. US Geol Surv Open File, Report 75-31
Arefiev S, Mayer-Rosa D, Parini I, Pomanov A, Smit P (1991) The Rachi (Georgia, USSR) earthquake of 29 April 1991: strong-motion date of selected aftershocks 3 May 1991-30 June 1991. Publ Ser Swiss Seismol Serv 103:1–211
Arefiev S, Mayer-Rosa D, Parini I, Pomanov A, Smit P (1991) Spitak (Armenia, USSR) 1988 earthquake region: strong-motion data of selected earthquakes June 1990-April 1991. Publ Ser Swiss Seismol Serv 104:1–102
Jibladze E, Gurguliani I, Tsereteli N (2000) The prediction of earthquake peak ground acceleration in Caucasus. J Georgian Geophis Soc 5:68–76
NGA (2008) Special issue on the next generation attenuation project. Earthq Spectra 24(1):1–341
Cotton F, Scherbaum F, Bommer JJ, Bungum H (2006) Criteria for selecting and adjusting ground-motion models for specific target applications: applications to Central Europe and rock sites. J Seismol 10(2):137–156
EMME (2013) Earthquake model of Middle East: hazard, risk assessment, economics and mitigation. Brochure Prepared for GEM (Global Earthquake model), Istanbul
Scherbaum F, Cotton F, Smit P (2004) On the use of response spectral-reference data for the selection and ranking of ground-motion models for seismic-hazard analysis in regions of moderate seismicity: the case of rock motion. Bull Seismol Soc Am 94(6):2164–2185
Scherbaum F, Delavaud E, Riggelsen C (2009) Model selection in seismic hazard analysis: an information-theoretic perspective. Bull Seismol Soc Am 99(6):3234–3247
Kale O, Akkar S (2012) A new procedure for selecting and ranking ground-motion prediction equations (GMPEs): the Euclidean-Distance based Ranking (EDR) method. Bull Seismol Soc Am 103(2A):1069–1084
Akkar S, Sandıkkaya MA, Bommer JJ (2013) Empirical ground-motion models for point- and extended-source crustal earthquake scenarios in Europe and the Middle East. Bull Earthq Eng. doi:10.1007/s10518-013-9461-4
Chiou BSJ, Youngs RR (2008) An NGA model for the average horizontal component of peak ground motion and response spectra. Earthq Spectra 24(1):173–215
Akkar S, Cagnan Z (2010) A local ground-motion predictive model for Turkey and its comparison with other regional and global ground-motion models. Bull Seismol Soc Am 100(6):2978–2995
Zhao JX, Zhang J, Asano A, Ohno Y, Oouchi T, Takahashi T, Ogawa H, Irikura K, Thio HK, Somerville PG, Fukushima Y (2006) Attenuation relations of strong ground motion in Japan using site classification based on predominant period. Bull Seismol Soc Am 96(3):898–913
Mukhadze T, Arabidze V, Chanadiri J, Eremadze N, Korkia G (2008) Establishment of the damage grade and assessment of seismic risk of dwelling houses in Tbilisi. In: Proceedings of the first international conference on seismic safety of Caucasus region population, cities and settlements, September 8-11, 2008. Tbilisi, pp 153–156
Sobolev G (ed) (1997) Otsenkaseicmicheskoiopacnostiiriska. BSTS, Moskva
Varazanashvili O, Tsereteli N, Muchadze T (2008) Seismotectonic conditions and seismic risk for cities in Georgia. In: Apostol I, Coldewey WG, Barry DL, Reimer D (eds) Risk assessment as a basis for the forecast and prevention of catastrophes. IOS Press, Washington, DC, pp 26–35, http://www.lrc.fema.gov/starweb/lrcweb/servlet.starweb?path=lrcweb/STARLibraries1.web&search=R%3d182463
Dilley M, Chen RS, Deichmann U, Lerner-Lam AL, Arnold M, Agwe J, Buys P, Kjekstad O, Lyon B, Yetman G (2005) Natural disaster hotspots: a global risk analysis. The World Bank, Washington, DC
Tsereteli E (2007a) Mapping of mass-movement potential on the territory of Georgia: criteria of destabilization. In: Chelidze T (ed) Atlas of GIS-based maps of natural disaster hazards for the Southern Caucasus. Tbilisi, pp 13–15. http://www.coe.int/t/dg4/majorhazards/activites/DocumentsFrancesc/Etudes/2009/GEO_Atlas_SouthCaucasus.pdf
Tsereteli N (2007b) Principles of multi-risk calculation for natural hazards: the case of Georgia. In: Chelidze T (ed) Atlas of GIS-based maps of natural disaster hazards for the Southern Caucasus. Tbilisi, pp 26–29. http://www.coe.int/t/dg4/majorhazards/activites/DocumentsFrancesc/Etudes/2009/GEO_Atlas_SouthCaucasus.pdf
Chelidze T, Tsereteli N, Tsereteli E, Kaldani L, Dolidze J, Varazanashvili O, Svanadze D, Gvencadze A (2009) Multiple risk assessment for various natural hazards for Georgia. In: Apostol I, Barry DL, Coldewey WG, Reimer DWG (eds) Optimization of disaster forecasting and prevention measures in the context of human and social dynamics. IOS Press, Amsterdam, pp 11–32
Coburn A, Spence R (2002) Earthquake protection, 2nd edn. Wiley, Chichester
Samardjieva E, Badal J (2002) Estimation of the expected number of casualties caused by strong earthquakes. Bull Seismol Soc Am 92(6):2310–2322
Bramerini F, Di Pasquale G, Orsini A, Pugliese A, Romeo R, Sabetta F (1995) Rischiosismico del territorioitaliano. Proposta per unametodologia e risultatipreliminari. RapportotecnicodelServizioSismicoNazionale SSN/RT/95/01, Roma
OpenQuake, a computer program for seismic hazard estimation http://www.globalquakemodel.org/openquake/about/
EZFRISK, Software for Earthquake Ground Motion Estimation http://www.ez-frisk.com/
Petrovski J (2005) Tbilisi earthquake of April 25 2002. Materials of Tbilisi earthquake of April 25 2002. Prepared for UNDP. Tbilisi, pp 133–188
Gabrichidze G, Lomidze G, Mukhadze T, Odisharia A, Timchenko I (2004) April 2002 Epicenter earthquake in Tbilisi, Georgia. In: 13 the world conference on earthquake engineering, Vancouver, BC, Canada, 1–6 August 2004, Paper No. 10635
Acknowledgments
The authors would like to acknowledge the valuable advice and consultation provided by the Steering Committee and Work Packages leaders, moreover, the authors kindly acknowledge the insightful comments of project managers and all team of EMME project.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer Science+Business Media Dordrecht
About this paper
Cite this paper
Tsereteli, N., Arabidze, V., Varazanashvili, O., Gugeshashvili, T., Mukhadze, T., Gventcadze, A. (2014). Vulnerability Analysis and GIS Based Seismic Risk Assessment Georgia Case. In: Teodorescu, HN., Kirschenbaum, A., Cojocaru, S., Bruderlein, C. (eds) Improving Disaster Resilience and Mitigation - IT Means and Tools. NATO Science for Peace and Security Series C: Environmental Security. Springer, Dordrecht. https://doi.org/10.1007/978-94-017-9136-6_20
Download citation
DOI: https://doi.org/10.1007/978-94-017-9136-6_20
Published:
Publisher Name: Springer, Dordrecht
Print ISBN: 978-94-017-9135-9
Online ISBN: 978-94-017-9136-6
eBook Packages: Computer ScienceComputer Science (R0)