Abstract
Among the common methodologies used for transmission pricing mechanism in the deregulated market, the point of connection (PoC) methodology charges the customer on the basis of “extent of use.” In this paper, a hybrid method has been introduced which comprises average and marginal participation method. Also this method is calculated for base case as well as peak case and it was observed that under peak case scenario the cost allocated is giving its optimality and the other nodes also respond positively either by no change or a decrease in their nodal pricing. This methodology is conducted on standard IEEE 14-bus system, whereas power flows are obtained by running Newton–Raphson load flow techniques.
Access provided by Autonomous University of Puebla. Download chapter PDF
Similar content being viewed by others
Keywords
1 Introduction
Transmission pricing has been a very wide and highly disputed issue of power deregulation era because of its diversified approaches and methodologies. Since its commencement from the very beginning, the electric power market models have coincided in a generic view, to centralized dispatch and decentralized dispatch concepts [1]. The transmission pricing mechanisms apparent in the whole range of composition can be divided into two broad frameworks: rolled-in and marginal [2]. Right from establishment, the price of transmission network usage has been estimated by impromptu approaches such as the postage stamp method or the contract path method [3, 4]. In postage stamp method, transmission charges are levied on per MW basis of transaction, either it be a generator or load. Also the distance of the power transmission is not taken into consideration. On the contemporary, the contract path methodology first assigns an arbitrary electrical path between both buyer and customer, and then assigns the wheeling charges for the transaction. Both the abovementioned approaches are simple in nature but they are not capable of estimating the “extent of use” of the lattice by any source/sink or a transaction. Although, after deregulation, the doctrine of cost allotment has reached to allotment in share of the “extent of use,” or in simpler words, the recipient pays [5, 6]. It means that a customer should be charged as per the cause. The central doctrine of POC tariff is its settlement at one point giving entrance to entire network arrangement and entire electricity merchandise. This tariff is determined by the connection level of any particular entity. The main feature of POC tariff is that it can be applied to bilateral transactions between two parties and also for Power exchange (PX) trades.
In this paper, we propose cost allocation to nodes based on POC principle for a standard IEEE 14-bus system. The real power tracing based on proportional sharing principle [7,8,9,10] provides disintegration of transmission line flows into generator and load commodities. We have considered the price estimation of transmission network among source and sink using marginal participation (MP) method [11,12,13,14,15,16,17]. This method is best suited for pool market where there is no connection between seller and buyer. It claims the flow share with the portion use in any line or any network. For determining the line consumption price, a price rate is assigned to every line. The most common approach is to take the rate of line price to the line consumption. Generally, it is considered for 1-year time period. Here the line consumption is the power flow in the respective line in MW calculated from power flow investigation. It gives the exact utilization of line by entire entities of the system. Once the price stake of any element present in the network system is calculated, we can easily determine its point of connection tariff (POC tariff). POC tariff is termed in ₹/MW (or $/MW) which an element has to pay for the network utilization either for its injection or withdrawal in a particular duration (e.g., a year).
The MP method along with its variants is used across the globe for cost allocation. One of its variant was implemented by the Central Electricity Regulatory Commission (CERC) in India [17]. Some of the other countries where this method is used are discussed in [18]. In this paper, we propose a hybrid method that calculates the charges based on peak conditions rather than base conditions.
2 Formulation
The proposed formulation involves following steps:
-
(1)
Solution of base case load flow on standard network;
-
(2)
Increment of 1 MW marginal load/generation at desired bus generated/absorbed by responding buses;
-
(3)
Calculation of line utilization factors;
-
(4)
Allocation of cost to nodes;
-
(5)
Calculation of PoC rates/nodal prices.
2.1 Solution of Base Case Load Flow on Standard Network
The standard 14-bus system is considered for the study. The load flow on the system is computed using Newton–Raphson method, which provides us with the nodal power and line power flows. Here the first bus is considered to be reference bus without the loss of generality, i.e., \(\delta_{1} = 0\). Power injection and withdrawal for this bus is not modeled. The nodal power and the line flows are given in Tables 1 and 2, respectively.
After running the load flow program, we got with us the nodal data along with line flows and each bus corresponding type. Here the power flow limits got violated for buses 6 and 8 which results as they being load bus from generator bus.
2.2 Increment of 1 MW Marginal Load/generation at Desired Bus Absorbed/generated by Responding Buses
As we know the marginal participation method allocates charges to every entity on the extent of its use, for that we need to increase the marginal data by 1 MW and note down the change it causes to the remaining system with the calculation of various parameters. Here we consecutively increase each node power injection/withdrawal by 1 MW and note down the modified nodal powers and line flows. By doing this we can trace the contribution of each node or line on any particular node. Further, we will calculate the indices required for the cost allocation.
2.3 Calculation of Line Utilization Factors
Marginal participation examines the variations in the system when inferior changes are developed in the generation or withdrawal of any agent. The output of this approach comes as the utilization factor of each line by various nodes. The cost of each line is assigned to each node on the basis of their utilization factor. The process develops as follows:
-
i.
Marginal participation sensitivity Aij gives the alteration in the power flow of any line j when the withdrawal/injection in any node i is risen by 1 MW. The rise of 1 MW is compensated by analogous rise in load or generation at some other bus or buses known as slack bus(es) that is achieved through average participation method. Also this factor is always considered to be positive since its negation neither gives any capital nor charges for the use of the system.
$$A_{ij} = \left| {F^{i}_{1} } \right| - \left| {F_{1} } \right|$$(1)Aij = marginal participation in line j due to increased injection/withdrawal on node i.
Fi1 = power flow in line 1 due to increased injection/withdrawal of 1 MW at a node.
F1 = power flow in line 1 under base case.
-
ii.
Seasonal index gives the total participation for each entity. For each entity, it is calculated as the product of its net injection with its marginal participation sensitivity.
$$U_{e,i,1} = \, \left( { \, \left| { \, F^{i}_{1} } \right| \, - \, \left| { \, F_{1} } \right| \, } \right) \, \cdot \, P_{i}$$(2)Ue,i,1 = seasonal index in line 1 due to injection/withdrawal at node i.
Pi = net base case power injection at bus I.
-
iii.
Marginal participation factor (MPF) provides the extent of use of any line for a particular node. The MPF of node i in line 1 can be defined as
$$MPF_{{i,1}} = {{U_{{e,i,1}} } \mathord{\left/ {\vphantom {{U_{{e,i,1}} } {\sum\nolimits_{i} {U_{{e,i,1}} } }}} \right. \kern-\nulldelimiterspace} {\sum\nolimits_{i} {U_{{e,i,1}} } }}$$(3)
2.4 Allocation of Cost to Nodes
For allocation of cost to nodes/buses, firstly the total allocation cost is derived via the line cost information. The line cost is considered as ₹ 1 Crore/Km for indicative purposes only (Table 3).
2.5 Calculation of PoC Rates/Nodal Prices
Calculation of Uniform Charges
The uniform charging method generalizes the entire entity on the basis of their net injection/withdrawal. The formula for the computation of uniform rate is given by
For the calculation of PoC charges, we have considered 50% contribution from uniform method and 50% from MP method. This will ensure steady transition to new transmission pricing mechanism. Here the uniform charge is calculated and it comes out to be 5.1168 ₹ Cr/MW (Table 4).
Calculation of MP charges
The marginal participation method cost is estimated by using the line utilization factors we have calculated in section C. The formula deployed is as follows:
CA = cost allocated to the entire network in a specified time (for ex. yearly transmission).
Calculation of PoC charges
In this paper, the PoC rates are calculated for uniform method, marginal participation method, and the hybrid.
(50% UC + 50% MP) method.
Here we have computed the PoC rates for the above methods and made a comparison among them (Table 5).
Issues
At present, there is not any globally adopted best common approach for allocation of transmission costs. All methods have their own pros and cons. In the entire world, a combination of different approaches is applied for the estimation of cost such as postage stamp, marginal/nodal pricing, marginal participation, average participation, MW-Mile, game theory, etc.
Since postage stamp method is the easiest one to understand, it neither considers transmission distance nor the real power flow through the line, or we can say it ignores the actual system operation. Coming to the marginal participation method, it lacks the fair selection of slack bus and network usage reliability. The average participation method simply traces the path of power from the origin to the sink(s) or vice versa, which doesn’t capture the network utilization in an efficient manner. On the other hand, the MW-Mile method doesn’t recover embedded cost of transmission expansion, i.e., it only charges for base case not for transmission reserve. In the transmission cost loss allocation using game theory, we have the monotonic shape value while it may or may not set inside the core. Also it follows additive property which represents linearity while the loss allocation is quadratic in its expression. Hence, we come to a point where we not only need an approach that includes extent of use by any entity but also is easy to implement or carry out. Here we come to conclude that the transmission charges should be estimated on the basis of peak scenario rather than base case.
3 PoC Charges Under Peak Conditions
For estimation of PoC charges under peak condition, we have increased the load at bus 4 by 50% (Table 6).
Now we will perform the entire process of PoC calculation on peak load. At first, we will calculate the line power flow under peak loaded case following which we will have the required data for the calculation of cost allocated to each node. Since the line lengths are not changed the line cost remains same. Only the cost distribution among all will change not the total cost of the system. We will calculate the uniform charges for peak load condition.
Now as we have with us the uniform charges, we go for calculation of MP charges and then the hybrid method charge on peak withdrawal condition (Figs. 1, 2 and Table 7).
4 Conclusion
Here we see that even when the load at bus 4 increased by 1.5 times, the total cost allocated to the node has increased only 1.26 times. Also we can see that the cost/MW/month will go down as the MW increases, i.e., the more the system will operate at peak condition the less the PoC tariff will be for that respective node/bus. When any node/bus in a system starts operating on peak load then the charges allocated to other nodes will change only when the power flows in that respective node/bus change. Otherwise, the charges will remain same or may reduce (as in the above case).
Hence, we arrived at a method that is not only easy to implement but also reliable as it charges on the basis of “extent of use.” In the future, we can observe the impact of selection of slack bus for the entire process. Also, we can take into context how the reactive power varies with changes implemented above so that we can add one more feather to the crown of this hybrid technology.
References
Hunt S, Shuttleworth G (1981) Making competition work in the electricity market. Academic
Shirmohammadi D, Filho V, Gorenstin B, Pereira M (1996) Some fundamental technical concepts about cost based transmission pricing. IEEE Trans Power Syst 11:1002–1008
Pfeffer JL (1985) Policies governing transmission access and pricing: the wheeling debate revisited. Public Util Fortn (United States) 116:9
Ilic Marija D, Yoon YT, Zobian A, Paravalos ME (1997) Toward regional transmission provision and its pricing in new england. Util Policy 6(3):245–256
Green R (1997) Electricity transmission pricing: an international comparison. Util Policy 6(3):177–184
Perez-Arriaga Ignacio J, Yves S (2003) Guidelines on tariff setting. In: Transport pricing of electricity networks. Leveque Francois, editor chapter 7. Kluwer Academic Publishers, pp 175–203
Shirmohammadi D, Gribik PR, Law ETK, Malinowski JH, O’Donnell RE (1989) Evaluation of transmission network capacity use for wheeling transactions. IEEE Trans Power Syst 4:1405–1413
Tabors RD (1994) Transmission system management and pricing: New paradigms and international comparisons. IEEE Trans Power Syst 9:206–215
Shuttleworth G (1999) Electricity transmission pricing: the European perspective, Technical Report. National Economic Research Associates
Website: www.nasdaq.com
Shuttleworth G (1999) Electricity transmission pricing: the European perspective, Technical Report. National Economic Research Associates. Analysis of cost recovery. IEEE Trans Power Syst 10(1):546–553
Rudnick H, Palma R, Fernandez JE (1995) Marginal pricing and supplement cost allocation in transmission open access. IEEE Trans Power Syst 10(2):1125–1132
Rubio-Oderiz FJ, Perez-Arriaga IJ (2000) Marginal pricing of transmission services: a cooperative analysis of network cost allocation methods. IEEE Trans Power Syst 15(1):448–454
Vazquez C, Olmos L, Perez-Arriaga IJ (2002) On the selection of the slack bus in mechanisms for transmission network cost allocation that are based on network utilization. In: 15th power system computing conference. PSCC, Seville
Galiana FD, Conejo AJ, Gil HA (2003) Transmission network cost allocation based on equivalent bilateral exchanges. IEEE Trans Power Syst 18(4):1425–1431
da Silva AML, de Carvalho Costa JG, Lopes Lima LH (2013) A new methodology for cost allocation of transmission systems in interconnected energy markets. IEEE Trans Power Syst 28(2): 740–748
Orfanos GA, Georgilakis PS, Hatziargyriou ND (2013) A more fair power flow based transmission cost allocation scheme considering maximum line loading for n-1 security. IEEE Trans Power Syst 28(3): 3344–3352
CERC. India jun 2010 Central electricity regulatory commission (sharing of interstate transmission charges and losses) regulations, 2010. Technical report, Central Electricity Regulatory Commission
Perez-Arriaga IJ (2013) Regulation of the power sector. Power systems. Springer, London
Soonee SK, Barpanda SS, Joshi M, Mishra N, Bhardwaj V (2013) Point of connection transmission pricing in India. Int J Emerg Electri Power Syst
Mehta RP, Rao MSS, Soman SA (2020) A cost-causal marginal participation method using min-max fairness for transmission services cost allocation. Sādhanā
Benetti MA, Sperandio M (2020) Transmission pricing: right insights for suitable cost allocation methods. In: Nojavan S, Zare K (eds) Electricity markets. Springer, Cham
York R, Elizabeth Bell S (2019) Energy transitions or additions?: why a transition from fossil fuels requires more than the growth of renewable energy. Energy Res Soc Sci 51:40–43. ISSN 2214–6296
Chikumbanje M, Frame D, Galloway S (2020) Enhancing Electricity Network Efficiency in sub-Saharan Africa through Optimal Integration of Minigrids and the Main Grid. IEEE PES/IAS PowerAfrica 2020:1–5
MATLAB. version 8.4.0.150421 (R2014b). Natick: The MathWorks Inc., 2014
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
About this chapter
Cite this chapter
Gaurav, R., Upputuri, R., Sahay, S., Kumar, N. (2022). Electricity Transmission Pricing: Marginal Pricing of Transmission Services Using Point of Connection Tariff. In: Gupta, O.H., Sood, V.K., Malik, O.P. (eds) Recent Advances in Power Systems. Lecture Notes in Electrical Engineering, vol 812. Springer, Singapore. https://doi.org/10.1007/978-981-16-6970-5_22
Download citation
DOI: https://doi.org/10.1007/978-981-16-6970-5_22
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-16-6969-9
Online ISBN: 978-981-16-6970-5
eBook Packages: EnergyEnergy (R0)