Abstract
Material balance pseudo-time has the characteristics of both pseudo-time and material balance time; it can not only realize the linearization of gas flow equation, but also establish equivalent relation of gas wells between variable rate and constant rate, it becomes one of the most important parameters in modern production analysis. In addition, due to the complicated mechanism of gas and water flow and the difficulty in describing the gas and water relationship, the production analysis method for the water production gas well is still in the exploratory stage, and there is no effective method which is widely adopted. Therefore, this paper starts from the material balance equation of gas-water reservoir, builds the expression of material balance pseudo-time, and acquires water content in gas reservoir by the use of production index curves method. In further, it is possible to calculate permeability (K), drainage radius (Re), gas well reserve (G), and so on. Consequently, a production analysis method which provides effective guidance for water production gas wells is built.
Access provided by Autonomous University of Puebla. Download conference paper PDF
Similar content being viewed by others
Keywords
1 Introduction
At present, the widely used pseudo-time in production analysis is based on pure gas wells; it does not apply to water production gas wells.
Because of producing water, pure gas flow in reservoir gradually becomes gas-water flow that greatly reduces gas relative permeability. Gas and water flow together may cause a water-blocking effect which will lead to gas seepage channels blocked and reduce effective porosity of the gas formation [1]. For these above, gas productivity will be decreased greatly. At this time, the inflow performance relationship is totally different with pure gas well, and the relationship between production and bottom hole pressure will no longer be the same with pure gas drive reservoir, but gas-water reservoir which considers not only gas production and pressure changes but also gas well water rate. Then on the basis of gas-water reservoir model, one will acquire the new method for computing pseudo-time for water production gas wells.
Nowadays, the main research results on material balance pseudo-time are presented as follows: Based on gas drive reservoir, Blasingame introduced pseudo-time into production analysis [2], from then on, pseudo-time was used in almost all of the production analysis methods. Afterward, N. M. Anisur Rahman revised this method and proposed a pseudo-time computation method for real gas [3]. Then D. M. Anderson and L. Matter developed a method to calculate pseudo-time for transient flow which considered characteristics of different flowing stages [4]. Further, Shahab Gerami et al. proposed a new way for nature fracture gas reservoir [5]. However, all these methods above are normal methods [6], and it has been demonstrated that they are just applied to pure gas wells but not apply to water production gas wells [7]. These methods could not solve problems in production analysis for water production gas wells.
In this paper, a new method for computing pseudo-time for water production gas wells is presented. This method is based on gas-water reservoir material balance equation that considers transient water influx, water production rate, and water PVT properties.
2 Gas-water Reservoir Material Balance Equation
According to gas reservoir classification by drive type [8], there are pure gas drive reservoir and water drive gas reservoir. The latter one can be further classified into edge-water reservoir and bottom-water reservoir by connection types of gas and water boundary, they are traditional water drive reservoir. While in this study, it is realized that there is the third type of water drive reservoir which is defined as gas-water reservoir.
This kind of reservoir is normally tight gas and has very gentle structure. During the process of hydrocarbon accumulation, its gas-water separation is not completely done and water preserves in formation as isolated lenticel water, gas and water layer overlap in profile. For these reasons, usually, there is no clearly gas and water boundary in gas-water reservoir. So it cannot be classified into either edge-water or bottom-water reservoir; thus, it is the third type of water drive reservoir. There is a typical gas-water reservoir in the northwest of china, the west part of Sulige gas field (Fig. 1).
Comparing with traditional water drive reservoir, gas-water reservoir has much smaller water volume and is hard to happen mass water invasion, its well produced water all comes from the lentical water itself without any surrounding supplement. Therefore, it is realized that the main characteristics of gas-water reservoir are the following three points:
-
There is no clearly gas and water boundary, gas and water layer overlap in profile.
-
Most formation water is isolated lenticel water or the water in the bottom of the structure.
-
The scale of the water is small and the connectivity of the water is poor each other.
Based on the three points, it is possible to deduce gas-water reservoir material balance equation. When reservoir pressure drop is Δp, the main volume changes of the reservoir are the following four parts:
-
Cumulative gas production and cumulative water production \( \left( {G_{\text{p}} B_{\text{g}} + W_{\text{p}} B_{\text{w}} } \right) \);
-
Expansion volume of gas in the reservoir: \( \left( {GB_{\text{g}} - GB_{\text{gi}} } \right) \);
-
The volume reduction of pore with gas that caused by expansion of immobile water and reduction of reservoir pore: \( \left( {GB_{\text{gi}} \left( {\frac{{C_{\text{w}} S_{\text{wi}} + c_{\text{p}} }}{{1 - S_{\text{wi}} }}} \right)\Delta p} \right) \)
-
Transient water influx (W(p)); Among them, the last one (W(p)) is associated with bottom hole pressure and working rules of gas well. The variation of transient water influx has three stages. In the early time of production, for the pressure drawdown has not come to gas-water transition zone, the well products without water, W(p) equals zero; after that, pressure drawdown comes to gas-water transition zone, formation water flows to wellbore through high-permeability zone from every direction, gas well begins to product a large number of water, W(p) increases rapidly; at last, when pressure drawdown gradually becomes steady, W(p) maintains a certain level and water production keeps steady or get down slowly.
In conclusion, gas-water reservoir material balance equation can be presented as Eq. (1)
For a normal pressure reservoir, the equation can be simplified into:
3 Pseudo-time for Water Production Gas Wells
Pseudo-time is an equivalent time which is derived from material balance equation, and it makes analysis modeling more accurate through bringing in pseudo-pressure and considering PVT changes of fluid during production. In addition, pseudo time makes different production manners in constant pressure or production have the same analysis curves [9]. Therefore, gas well production manners will have no interference to rate transient analysis. For these advantages, most of the modern production analysis methods take use of pseudo-time, such as Blasingame, Agarwal-Garder [10], and normalized pressure integral [11]. Based on the gas-water reservoir material balance equation, it is possible to acquire pseudo-time formulation for water production gas wells. Firstly, take the derivative of Eq. (2) with respect to time, one will get Eq. (3), where \( p / Z \) is the function of time.
Then combining with Eq. (4) [12], Eq. (3) becomes
For gas reservoir, it is known that Cg ≈ Ct, then substituting Eqs. (5) into (6), it follows Eq. (7)
Combining the definition of pseudo-pressure Eq. (8) [13], finally, pseudo-time for water production gas wells is expressed as Eq. (9):
4 Computation of Transient Water Influx
In Eq. (9), the transient water influx changes with formation pressure drawdown and variations of gas product rate. In this paper, water influx will be calculated by the method of production index curves [14]. This method considers that both pure gas drive reservoir and water drive reservoir have the same linear characteristic in initial part of pressure drawdown curves (p⁄Z − Gp), that is because gas production has not been affected by water influx. Afterward, with increasing of water influx, pure gas drive reservoir and water drive reservoir become different. It is realized that the difference (Δ(p⁄z)) between the extension of the initial line in pressure drawdown curve is obviously caused by water influx (Fig. 2). Based on this theory, one will get the formulation for calculating volume of transient water influx in gas-water reservoir. There is another expression for gas-water reservoir material balance equation as
where
Or expresses as
The corresponding form of material balance equation for gas drive reservoir is Eq. (13)
Combining with Eqs. (12) and (13), one gets
So
Thus, integrating Eqs. (11) and (15), one gets Eq. (16) which is the formulation for calculating transient water influx in gas-water reservoir.
This new method makes calculating of transient water influx simplified greatly, it is allowed one to acquire transient water influx only by gas well production data, and there is no more need to evaluate water shape and size through a series of complicated computation. The accuracy of this method is closely associated with production data which is in accordance with production analysis; therefore, errors will have no propagation and growth in the process of calculating transient water influx and the following production analysis.
5 Results
Combining Eqs. 2, 9 and 16, it is possible to calculate material balance pseudo-time of water production gas wells and then plot Blasingame type curves for production analysis. More than 50 water production gas wells in Sulige gas field are selected to calculate pseudo-time by use of the normal method and the new method, respectively. Through a large number of calculations, it is found that the new method obviously reduces production data divergence and fluctuation and improves their fitting rate.
Su#3 is a water production gas well which has produced for 679 days, its average water–gas ratio is 2.52 m3/104 m3, and cumulative production is 2000 × 104 m3. Its production data is very scattered (Fig. 3). The reason is that water production makes relationship of gas production and bottom hole pressure changed and leads to normal method no longer apply to water production gas wells. Therefore, it is necessary to take use of the new method to adapt water production wells. SU#3 Blasingame curves by the new method and normal method are shown in Figs. 4 and 5 and the result is shown in Table 1.
6 Conclusions
This study presents the following conclusions:
-
Gas-water reservoir is the third type of water drive reservoir, this paper states its balance relationship between gas and water and presents material balance equation for it.
-
Based on gas-water reservoir material balance equation, this paper constructs a new method for computing material balance pseudo-time for water production gas wells.
-
The new method provides a potent theoretical support for production analysis of water production gas wells and makes water production analysis more accurate.
Abbreviations
- \( B_{\text{w}} \) :
-
Formation volume factor of water [m3/m3]
- \( C_{\text{ti}} \) :
-
Total system compressibility at initial reservoir pressure [1/MPa]
- \( C_{\text{gi}} \) :
-
Gas compressibility at initial reservoir pressure [1/MPa]
- G :
-
Original gas in place [108m3]
- \( G_{\text{p}} \) :
-
Cumulative gas production [104m3]
- \( p_{\text{i}} \) :
-
Initial reservoir pressure [MPa]
- \( p \) :
-
Currently reservoir pressure [MPa]
- \( p_{\text{sc}} \) :
-
0.101[MPa]
- \( p_{\text{p}} \) :
-
Pseudo-pressure at currently reservoir pressure [MPa2/(mPa s)]
- \( q_{\text{g}} \) :
-
Production rate [104m3/d]
- T :
-
Reservoir temperature [K]
- \( T_{\text{sc}} \) :
-
293.15 [K]
- \( t_{\text{a}} \) :
-
Material balance pseudo-time[d]
- W :
-
Water volume in gas reservoir [108m3]
- \( W_{\text{p}} \) :
-
Cumulative water production [104m3]
- \( Z_{\text{i}} \) :
-
Gas compressibility factor at initial reservoir pressure
- Z :
-
Gas compressibility factor at currently reservoir pressure
- \( \overline{C}_{\text{t}} \) :
-
Total system compressibility at average reservoir pressure [1/MPa]
- \( \mu_{\text{gi}} \) :
-
Gas viscosity at initial reservoir pressure [mPa s]
- \( \overline{{\mu_{\text{g}} }} \) :
-
Gas viscosity at average reservoir pressure [mPa s]
References
Li X. Oil and gas flow in underground porous media. Bei Jing: Petroleum Industry Press; 2007.
Blasingame TA, Lee WJ. Variable rate reservoir limits testing. In: SPE 15028 presented at the Permian Basin Oil and Gas Recovery Conference, Midland, TX; 1986 Mar.
Anisur Rahman NM, Mattar L, Zaoral K. A new method for computing pseudo-time for real gas flow using the material balance equation. In: PETOC 2004–182 presented at the Petroleum Society’s 5th Canadian international petroleum conference (55th Annual Technical Meeting), Calgary, Alberta, Canada; 2004 June 8–10.
Anderson DM, Matter L. An improved pseudo-time for gas reservoirs with significant transient flow. In: PETOC 2005–114 presented at the petroleum society’s 6th Canadian international petroleum conference (56th Annual Technical Meeting), Calgary, Alberta, Canada; 2005 June 7–9.
Gerami S, Pooladi-Darvish M, Hong H. Decline curve analysis for naturally fractured gas reservoirs: a study on the applicability of “pseudo-time” and “material balance pseudo-time”. In: IPTC 11278 presented at the international petroleum technology conference held in Dubai, U.A.E.; 2007 Dec 4–6.
Yuan B, Wood DA. Production analysis and performance forecasting for natural gas reservoirs: theory and practice (2011–2015). J Nat Gas Sci Eng. 2015;26:1433–8.
IIk D, Jenkins CD, Blasingame TA. Production analysis in unconventional reservoirs—diagnostics, challenges, and methodologies. In: SPE 144376 presented at the SPE North American unconventional gas conference and exhibition held in the woodlands, Texas, USA; 2011 June 14–16.
GB/T 26979. The Classification of Natural Gas Pool; 2011.
Blasingame TA, Mc Cray TL, Lee WJ. Decline curve analysis for variable pressure drop/variable flowrate systems. In: SPE 21513; 1991.
Agarwal RG, Gardner DC, Kleinsteiber SW, Fussell DD. Analyzing well production data using combined-type-curve and decline-curve analysis concepts. In: SPE 49222; 1998.
Blasingame TA, Johnston JL, Lee WJ. Type-curve analysis using the pressure integral method. In: SPE 18799-MS; 1989.
Cox SA, Sutton RP, Blasingame TA. Errors introduced by multiphase flow correlations on production analysis. In: SPE 102488 presented at the 2006 SPE annual technical conference and exhibition held in San Antonio, Texas, U.S.A; 2006 Sep 24–27.
Al-Hussainy R, Ramyey HJ, Crawford PB. The flow of real gases through porous media. JPT. 1966; p. 625–36.
Li C. Determination of water influx in gas reservoirs. Xinjiang Petrol Geol. 2003;24(5):430–1.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Luo, J., Sun, Y., Zhang, B., Yue, J., Huo, M. (2020). Production Analysis Method Based on Material Balance Pseudo-time for Water Production Gas Wells. In: Lin, J. (eds) Proceedings of the International Field Exploration and Development Conference 2018. IFEDC 2018. Springer Series in Geomechanics and Geoengineering. Springer, Singapore. https://doi.org/10.1007/978-981-13-7127-1_16
Download citation
DOI: https://doi.org/10.1007/978-981-13-7127-1_16
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-13-7126-4
Online ISBN: 978-981-13-7127-1
eBook Packages: EngineeringEngineering (R0)