1 Introduction

The state of Uttarakhand in India is such a place in the northern part of Himalayas where every year, millions of pilgrims use roadways to reach their respective shrine and temples such as Rishikesh, Devprayag, Srinagar, Chamoli, Joshimath, Badrinath, and Kedarnath. The Rishikesh–Badrinath (Mana) National Highways (NH-7), is a prime medium for nearly all types of transportation in Uttarakhand, India. Along which the rocks of Garhwal Himalayas are well exposed (Valdiya and Bartarya 1989). However, frequent slope failures of the road cut sections pose major hindrance to the socio-economic developments of the region due to lack of alternative railway network and airports (Ansari et al. 2019; Solanki et al. 2019; Gupta et al. 2016; Mahanta et al. 2016).

The failure of slopes in Uttarakhand are common particularly along two zones lying in close proximity of two major tectonic discontinuities i.e. Main Boundary Thrust (MBT) and Main Central Thrust (MCT). Where the neo-tectonic activities along the zones of major thrusts cause a high frequency of slope failure (Valdiya and Bartarya 1989). The state has witnessed several larger landslide events over past two decades e.g. Okhimath landslide along Mandakini valley in 1998 (Sah and Bist 1998), Phata Byung landslide of Rudraprayag district in 2001 (Chaudhary et al. 2010), Budha Kedar landslide in Balganga valley (Sah et al. 2003), Varunawat landslide in 2003 (Gupta and Bist 2004), Agastyamuni landslide in 2005 (Rautela and Pande 2005), landslide in Asi Ganga in 2012 (Martha et al. 2013), Balia Nala landslide and Hill slope instability in Nainital (Kumar et al. 2016; Sah et al. 2018) and Kedarnath tragedy in June 2013 (Vishal et al. 2017) etc. The heavy monsoonal rainfall causes saturation of these slopes, seepage along discontinuity or tension crack and slope undercutting by fluvial erosion, which triggered many landslides in the whole valley (Sati et al. 2011; Singh et al. 2018; Sundriyal et al. 2015).

The cut slopes along the highways in the Himalayan terrain are in general, infested with weak and fractured rock mass with steep weathered slopes, composite discontinuity distribution and overburden of debris mass on weathered slopes (Valdiya and Bartarya 1989; Singh et al. 2013). Slope failures of this region varies from small-scale earth movements to large scale landslides (Varnes 1954, 1996; Cruden and Varnes 1996). The prevailing study of geo-morphological, geotechnical and geo-hydrological conditions shows a combination of processes involve in the earth flow, avalanches, rock fall, rock and debris slide, block topple etc. (Varnes 1954, 1978, 1984; Cruden 1991; Hungr et al. 2014). Where geo-environmental factors such as slope, lithology, terrain units, land cover, soil depth, weathering, aspect, drainage density and lineament density are key factors, which controls the stability of the exposed slope (Hoek and Bray 1991; Wyllie and Mah 2004).

Sati et al. (2011), and Bhandari (2006) claimed that ongoing road widening work, without assessment of geotechnical parameters, ignorance of exact geological structure, defective engineering technique and bad execution of constructions at the base of road leads to increment of slope failures. Due to that several incidents of major or minor landslides have been reported at different cut sections along NH-7 (Sati et al. 2011; Barnard et al. 2001). Fell et al. in 2005 advised that vulnerability analysis of these cut slopes is of great significance for landslide hazard assessment. Recently in the proclaimed area, various methods as analytical, conventional and numerical models were used to analyze these roads cut slopes by researchers as, Ansari et al. (2019); Kundu et al. (2017); Pain et al. (2014); Singh et al. (2014); Siddique et al. (2015) and Siddique (2018); Dudeja et al. (2017); Sarkar et al. (2016); Pandit et al. (2016).

In the present study, road cut sections between Shivpuri to Kaudiyala were chosen along NH-7 in Uttarakhand, for detail rock slope stability analysis. Where five road cut slopes were selected in the Phyllitic quartzite and quartzite rocks of most vulnerable nature. The primary objective includes rock mass characterization (GSI and RMR) and empirical slope stability analysis (SMR, CSMR Co-SMR & Qslope). Where Qslope methods also discuss, to stable the cut slopes by diminishing the slope angle during excavation in more easy and cheap way. Further the numerical simulation with conventional Limit equilibrium method and much advanced Finite element method to evaluate the failure mechanism and factor of safety.

2 Study Area and Field Investigation

The study area is located along the Rishikesh–Badrinath (Mana) National Highway (NH-7), between Shivpuri to Kaudiyala that runs parallel to the Ganga–Alaknanda valley in Garhwal Himalayan, Uttarakhand. It falls on Survey of India toposheet no. 53 J/8, that geographically lies between longitudes of 78° 22–78° 29 and latitudes of 30° 07–30° 04. The area lies in the northern Lesser Himalayas groups of rocks, where different litho-groups belong to the Infra-Krol formation, lower and upper Tal formation, and Blaini Formation (Valdiya et al. 1975). The rocks are highly affected by major and minor tectonic structures.

The main road cut section of the study area is sandwiched between Saknidhar Thrust (ST) and North Almora Thrust (NAT), and comprised with quartzite and phyllitic quartzite’s (Fig. 1). Along the Shivpuri and Kaudiyala Highway, the rocks are intensely fractured, where two to three set of joints can easily found. Most vulnerable nature of five different slopes were chosen for further stability analysis (Fig. 2). During the field investigation, the main aim was to collect the geological and geotechnical data’s. The representative rock samples were also collected for experimental study. The field photographs of different cut slopes are shown in Fig. 3 with their extant observations. The geological data of different slopes with their key information are given in Tables 1 and 2.

Fig. 1
figure 1

Location map of study area indicating slope locations (1–5)

Fig. 2
figure 2

Geological map of the study area modified after Valdiya (1980)

Fig. 3
figure 3

Location 1, Planer slope failure; Location 2, Indicate the jointed, blocky slope with the formation of the wedge and block failure; Location 3, Slope dipping upstream direction showing wedge failure; Location 4, Cut slope indicate major joint and overhanging block above highway; Location 5, Two major joint set and formation of potential wedge

Table 1 Attributes of discontinuities with their coordinates
Table 2 Collected geotechnical parameter at studied locations

3 Methodology

The present article discussed the Kinematics and Petrographic study to find out their failure types with their mineralogical variation. The rock mass characteristics were classified based on RMR and GSI techniques and various empirical slope stability methods (SMR, Chinese SMR, continuous SMR, Qslope stability) were adopted to identify their failure potential with remedial measures. Ansari et al. in 2019 has listed a number of empirical methods for stability analysis of slopes, tunnels, mining and underground excavations which are developed by geotechnical, mining and civil engineers. Stability analysis were also carried out using adaptive LEM and advance FEM numerical models to compare the different results with their stability state.

3.1 Kinematic Analysis

The kinematic analysis gives a good indication of stability condition, but it has certain limitations as it does not account for rock and joint properties and external forces like water pressure that has significant effect on stability (Yoon et al. 2002). Kinematic analysis helps us to identify the potential mode of failure based on the angular relationship between discontinuities and the slope surface. This relationship is plotted on an equal angle stereonet to determine mode and direction of failures in computer Program DIPS 6.0.

3.2 Rock Mass Characteristics

RMRbasic was initially given by Bieniawski (1979) for the classification of the rock mass. Which uses five parameters such as UCS uniaxial compressive strength (in MPa) of intact rock material, rock quality designation (RQD), the spacing of discontinuities, conditions of discontinuities, and groundwater condition. The RQD was calculated by volumetric joint count (Jv) as in Eq. 1 (Palmström 1982). Where volumetric joint (Jv) was estimated by calculating the joints in cubic meter volume of a rock mass during the field survey.

$${\text{RQD}} = { 115} - {3}.{\text{3Jv}}$$
(1)

Hoek & Brown in 1997 suggest that RMR is quite meaningless for weak jointed rock masses (RMR < 25) because of poor RQD value. To overcome such shortcoming of RMR classification, Hoek in 1994 & 1995 established a more efficient and detailed technique of Geological strength index (GSI). Where GSI estimate the reduction in rock mass strength in discrete geological circumstances. Sonmez and Ulusay, in 1999 provided quantitative numerical basis for evaluating GSI by plotting the graph based on two parameters i.e. rock structure and block surface conditions which are descripted by the following equations.

$${\text{SR}} = - {17}.{\text{5 ln Jv }} + {79}.{8}$$
(2)
$${\text{SCR}} = {\text{Rr }} + {\text{ Rw }} + {\text{Rf}}$$
(3)

where Jv = volumetric joint count, Rr = Roughness rating, Rw = Weathering rating, and Rf = Infilling rating.

3.3 Empirical Methods of Slope Stability

(a) Slope Mass Rating (SMR)

SMR was introduced by Romana (1985) to assess the slope condition, which uses adjustment factors to consider the interrelationship of joint and slope orientation. SMR is calculated from RMRbasic (Bieniawski 1989) by using the formula as shown in Eq. (4).

$${\text{SMR } = \text{ RMR}}_{{{\text{basic}}}} + \left({\text{F}}_{1} \times {\text{F}}_{2} \times {\text{F}}_{3}\right) + {\text{F}}_{4}$$
(4)

where, F1, F2, and F3 are adjustment factors related to joint orientation with respect to slope orientation, and F4 is the correction factor for a method of excavation.

(b) Chinese Slope Mass Rating (CSMR)

CSMR technique is presented by Chen in 1995, where slope height factor (ξ) and discontinuity factor (λ) two more factors were added in the original SMR (Romana 1985). The CSMR are descripted by the following Eqs. (5).

$${\text{CSMR}} = \, \xi {\text{ RMR}}_{{{\text{basic}}}} + \, \lambda \, ({\text{F}}_{{1}}\times {\text{F}}_{{2}}\times {\text{F}}_{{3}} ) \, + {\text{ F}}_{{4}}$$
(5)

where, ξ = 0.57 + 0.43 \(\times\)\(\frac{80}{H}\) (for slope height > 80 m) or; ξ = 1 (for slope height ≤ 80 m).

And λ = 1 for faults of long weak seams filled with clay; 0.8–0.9 for bedding planes of large scale joints with gouge and = 0.7 for joints of tightly interlocked bedding plane.

The rating based on final score of SMR and CSMR are mainly discrete functions and adjustment factors of SMR scheme. Which are somehow on judgment basis and are best defined by experienced geotechnical engineers. Therefore, to facilitate the determination of adjustment factors by less experienced personnel, a continuous functions proposed by Tomás et al. in 2007, for F1, F2, and F3. The slope designer and geotechnical engineer frequently uses this system to assess the stability of engineered structures in various geological conditions.

(c) Continuous Slope Mass Rating (CoSMR)

CoSMR is given by Tomas et al. 2007, which is reform of discrete SMR technique of Romana (1985). The CoSMR provides unique value of each adjustment factor unlike a range as in SMR and calculated by using the following Eq. (6).

$${\text{CoSMR}} = {\text{ RMR}}_{{{\text{basic}}}} + \, ({\text{F}}_{{1}}\times {\text{F}}_{{2}}\times {\text{F}}_{{3}} ) \, + {\text{ F4}}$$
(6)

The adjustment factors F1, F2 and F3 are calculated by using the following equations:

$$F_{1} = \frac{16}{{25}} - \frac{3}{500 } arctan\left( {\frac{1}{10} \left( {\left| A \right| - 17} \right)} \right)$$
(7)

where, \(\left|A\right|\)= \(\left| {\alpha j - \alpha s} \right|\) for planer failure, = \(\left| {\alpha i - \alpha s} \right|\) for wedge failure, = \(\left| {\alpha j - \alpha s - 180} \right|\) for toppling failure, and αj, αs, and αi are dip direction of joint, slope and plunge direction of line intersection of two joint planes.

$$F_{2} = \frac{9}{16} + \frac{1}{195}\arctan \left( {\frac{17}{{100}}\left( {B - 5} \right)} \right)$$
(8)

where B is equals to dip (βj) of joint for planer and toppling failure, to dip on plunge of line of intersection for wedge failure.

$$F_{3} = - 30 + \frac{1}{3} {\arctan}\left( C \right) ; F_{3}= -13 - \frac{1}{7} {\arctan}\left( C-120 \right)$$
(9)

C is an angular difference of dips of joint and slope (βj−βs) for planer failure. C is difference of dip of plunge of line and dip of slope (βi−βs) for wedge. For toppling, C is defined as sum of dip of joint and slope (βj + βs).

The adjustment factor for the method of excavation (F4) has been fixed empirically as follows:

Natural slopes: F4 =  + 15, Presplitting: F4 =  + 10; Smooth blasting: F4 =  + 8; Normal blasting: F4 = 0; Deficient blasting: F4 = –8, and Mechanical excavation: F4 = 0.

(d) Qslope Stability

The SMR techniques do not encounter the surficial discontinuity condition and weathering effect in their final score calculation. Therefore, Qslope stability, the modified version of the Q slope classification system (Barton et al. 1974; Barton and Grimstad 2014) has been given by Bar and Barton (2017) to reconsider the additional parameters. The Qslope stability includes numerous additional parameters such as roughness, rock mass structure and frictional characteristics of joint walls or filling materials, strength properties and different geologic and environment condition. It allows the geotechnical engineers to evaluate the stability of excavated rock slopes in the real ground condition. It can help to reduce the slope angle due to local failures and also provide possible adjustments in slope angles according to rock mass conditions during design of road cut slopes and benches. Qslope has the following expression.

$$Q_{slope } = \frac{RQD}{{J_{n} }}*\left\{\frac{{J_{r} }}{{J_{a} }}\right\}_o*\frac{{J_{wice} }}{{SRF_{slope} }}$$
(10)

Where, RQD (Rock quality designation), Jn (Joint sets number), Jr (Joint roughness number), Ja (Joint alteration number), Jr/Ja included discontinuity orientation and wedge adjustment factor (Jr/Ja)o, Jw (ice-wedging effects and tropical rainfall erosion-effects) and SRFslope is strength reduction factor for the slope. Further,  SRFslope factor is divided into three parts, namely, SRFa, physical condition number; SRFb, stress-strength number, and SRFc major discontinuity number.

3.4 Numerical Modelling

The conventional limit equilibrium method (LEM) is widely used for slope stability. Which is executed on the basis of finite number of slices and the surface showing minimum factor of safety is called as critical slip surface, it means only a single factor of safety is applied throughout the whole failure mass (Zhu et al. 2003). It is considered as drawback of LE method, however due to its simplicity (less CPU time) significant number of slope stability are examined over the years (Lin et al. 2014; Singh et al. 2017). The common techniques based on LE principle are the Ordinary/Fellenius method (1927), Bishop simplified method (1955), Janbu simplified (1968), Janbu corrected (1973), Spencer (1967), Corps of Engineer #1 and #2 (1970), Lowe and Karafiath (1960), and GLE/Morgenstern- Price (1965). On the basis of previous study carried out by Fredlund and Krahn (1977), Espinoza et al.(1994), Zhu et al. (2003) deduced that position of critical slip surface may deviate in different method and equations of factor of safety with respect to force and moment equilibrium are derived separately.

The finite element method (FEM) has substantial advantage over LE method, where factor of safety is computed without preconceived failure mechanism (Griffiths and Lane 1999). The FEM has been chosen here due to its higher capability in considering geometry and rock mass complexities (Eberhardt 2003; Hammah et al. 2004; Rocscience 2001; Hammouri et al. 2008). The continuum code in FEM model discretize the entire model into numerous small zones, and material property is allocated to each zone and simulated in distinct stress/strain condition (Eberhardt 2003; Stead et al. 2006; Hammah et al. 2005). Mohr–Coulomb failure criterion was used for exact determination of failure envelope in the present modelling of LEM and FEM. Recently, many researchers have attempted numerical methods to determine the stability of cut slopes in the Indian Himalayan region (Mahanta et al. 2016; Siddque et al. 2018; Kanungo et al. 2013; Pain et al. 2014; Gupta et al. 2016; Jamir et al. 2017).

4 Results and Discussion

4.1 Petrography and Kinematics of Different Locations

Photomicrographs of phyllitic quartzite and quartzite were observed under the microscope to find the mineralogical variation, impact of weathering and deformation changes (Fig. 4). The phyllitic quartzite showed that quartz grains were fractured and interstices spaces were filled by opaque phases and ferruginous material (Fig. 4a, b). Where crushed and fused quartz grains with patches of opaque phase and the clay band were formed during initial phase of metamorphism. In the quartzite most of quartz grains have numerous inherent networks of fracture and triangular fused contact which are developed due to high pressure deformation of preexisting lithology. This may be responsible for overall low compressive strength for quartzite (Fig. 4c, d).

Fig. 4
figure 4

(Phyllitic Quartzite) a PPL & b XPL medium grain of well-developed fractured quartz and interstices space was filled by clay band, opaque phases/ ferruginous material; (Quartzite) c PPL & d XPL quartz grain possessing inherent networks of fracture with triangular fused grain boundary contact

For kinematic analysis, the measured structural data of slope & discontinuity planes for all five locations (Table 1) were plotted in the lower hemisphere (equal angle projection) stereograph using Dip 6.0 software. Kinematics of intensely fractured rocks showed prominently the wedge type of failures for all location with planar failure at location 1, and toppling at location 4 & 5 (Fig. 5). The failure probability of different types for different locations are given in the Table 6. In support of kinematics, the wedge formed due to intersection of joints can be clearly seen in the field photograph of different locations (Fig. 3).

Fig. 5
figure 5

Kinematic analysis of the jointed rock mass for all the locations (shaded area shows possible failure envelope)

4.2 Rock Mass Characteristics

RMRbasic was computed from different rock-mass parameters based on field and experimental work. Uniaxial compressive strength (UCS) of representative rock samples was estimated in the lab by using universal testing machine (UTM) as per ISRM suggested methods (2007). Mean values of UCS is shown in Table 3. Rating of different parameters for the RMRbasic with their result are shown in Table 4, where locations 1 and 5 are under ‘good’ category, while locations 2, 3 and 4 are under ‘fair’ category. RMRbasic determination of different vulnerable locations shows that the study area (from Shivpuri to Kaudiyala) have generally good and fair quality of rocks.

Table 3 Laboratory determined data of representative rocks
Table 4 Rating of parameters used for the estimation of RMR (Bieniawski 1979)

GSI value was estimated on the basis of two parameters, i.e. ‘structure rating’ (SR) and ‘surface condition rating’ (SCR) as shown in Table 5. The calculated SR and SCR values have been plotted in the quantified GSI chart and red color stars shows GSI value for different locations as shown in Fig. 6 (Sonmez and Ulusay 1999). Estimated GSI value shows that location 1, 2, 4 and 5 have blocky structure with fair surface condition, while location 3 has blocky structure with good surface condition. Quantified GSI value of location 3 was observed to be slightly higher than location 1 & 5 cut slopes due to the compact nature of quartzite. While location 2 and 4 has lower GSI value than other cut slopes due to their heavily jointed nature and surface condition as observed in the field.

Table 5 Different parameters used for the estimation of GSI
Fig. 6
figure 6

Calculated GSI values plotted on the GSI chart provided by Sonmez and Ulusay (1999)

4.3 Empirical slope stability analysis

Investigation of slope face by SMR method is likely to give a preliminary assessment of slope stability and providing information about instability mode and required support measures. The adjustment factors F1, F2, F3 have been carefully estimated based on rating of different mode of failures (Kinematic analysis) in each slope and average of adjustment factors has been consider. The value of F4 has been taken as ‘−8′ due to poor blasting for excavation to consider the worst case structure (Table 6). SMR is calculated from Eq. (4) using RMRbasic for all the locations (Table 6).

Table 6 Values of correction factors and SMR for different slopes

According to Romana (1985), location 1, 2, 3 and 5 are in partially stable condition, while location 4 is in stable condition. Different slope locations of normal category may be partially stable but likely to undergo failure depending upon different geological, geotechnical and geo-hydrological (pre and post-monsoon) conditions.

CSMR (Chen 1995) was calculated by using the different parameters accordingly as in Eq. (5)). The result shows that the different locations are in partially stable condition, except location 4, which has CSMR value 40.068 and may consider in unstable state (Table 7).

Similarly for CoSMR, Values of A, B and C can be estimated from the table provided by Romana (1985) and adjustment factor F1, F2, F3 have been carefully calculated from Eqs. 7, 8 and 9 and value of F4 is taken as the same as in SMR. The CoSMR values were calculated accordingly as Eq. 6. Results show that the all the locations are partially stable, except the location 4 has 40.96 SMR value, which may be critical between unstable and critical stability class of CoSMR (Table 8).

The parameters required to calculate Qslope stability analysis is given in the Table 9. RQD has been calculated using Eq. (1) and descriptions and ratings for the Q-slope parameters as descripted in Eq. (10) was assigned using standard rating system provided by Bar and Barton (2017). Estimated Qslope value is shown in Table 10, where maximum value of Qslope is 1.16 for the location 1 and minimum value of 0.049 for the location 4. Qslope stability data chart provided by Bar and Barton (2017) is shown in Fig. 7, where Qslope value and average slope angle in field has been plotted. Qslope stability data chart is categorized into three zone based on slope stability uncertainty, i.e. stable, unstable and partially stable in between stable and unstable zone. Bar and Barton (2017) has also given the formula for different probability of failures based on Qslope value.

Table 7 The values of correction factors and CSMR (Chen 1995)
Table 8 The values of correction factors and CoSMR (Tomás et al. 2007)
Table 9 Estimated Qslope parameters of the studied locations
Table 10 Estimated Qslope value and slope angle of the studied locations and their stability
Fig. 7
figure 7

Data plot of Qslope vs. average slope angle and β angles of the studied locations

Stability of each cut slope in data chart can be seen with red star marks, where slope at location 1 and 5 are critically stable and rest of location are unstable (Fig. 7). From Qslope description, it is possible to reduce the slope angle and design the road cut slope based on probability of failure, during road excavation accordingly. So the same has been incorporated to improve the probability and Qslope value and β angles having probability of failures 1% (PoF = 1%, Slope angle β0 = 20 log10 Qslope + 65°) has been plotted in Fig. 7 (Blue star marks). The β angle to stable each slopes accordingly the failure probability 1% is given in the Table 10.

4.3.1 Comparison of SMR, CoSMR, CSMR and Qslope

As from the SMR, CoSMR, CSMR description and Qslope value for average slope angle from Qslope stability data chart analysis, the stability problems are explored and correlated for all the locations (Tables 6, 7, 8 and 10). Different SMR techniques, i.e. discrete (SMR and CSMR) and continuous SMR, were compared (Fig. 8). The comparative analysis of SMR techniques and CSMR shows that, maximum variance in rating values was observed 3.7%, which is very slight difference and their stability shows the same result. The comparative analysis between SMR and CoSMR also shows very less variance with a maximum of 5.87%. However, most of the slopes fall under partially stable condition among SMR, CoSMR and CSMR techniques. Only the location 4 has critical case, because SMR (39.08), CSMR (40.068) and CoSMR (40.98) values lies on the boundary of (partially stable and unstable) different classification techniques. Sardana et al. 2019 has also compared the SMR, CSMR and CoSMR values of road cut slopes along NH-44A, Mizoram, India, which shows almost same type of instability issues in different techniques with slight differences. The Qslope stability analysis from data chart (Fig. 7) shows some difference than other empirical methods for location 2 and 3, while other locations have same type of stability. Ansari et al. (2019) has also calculated the Qslope and SMR technique, where he compared the results of eighteen different rock slopes and showed that most of the result show same type of failure probability in both the techniques.

Fig. 8
figure 8

Comparison of various SMR techniques (Original SMR, CoSMR and CSMR)

5 Numerical Modelling

Slope geometry was prepared for all five cut slope sections as observed in the field and then input parameters as in Table 3 were used for further numerical simulation. The quantitative result of numerical simulation in LEM method using Slide V6.0 software, were evaluated. The deterministic factor of safety, and critical slip circles for all cut slopes are shown in Fig. 9.

Fig. 9
figure 9

Limit equilibrium modelling of all studied road cut slopes along NH-7, Uttarakhand, India

The FoS values using Mohr- Coulomb criterion were calculated for various LE methods, viz. Ordinary/Fellenius method, Bishop simplified method, Janbu simplified, Janbu corrected, Spencer, Corps of Engineer #1 and #2, Lowe and Karafiath and GLE/Morgenstern-Price method (Fig. 10). Where the FoS obtained for Bishop simplified method shows that location 1 (1.36) & 3 (1.31) are fairly stable, location 2 (1.14) & 5 (1.14) are critically stable and location 4 (0.96) is unstable (Fig. 9).

Fig. 10
figure 10

FoS and Total displacement observed in different Locations (1–5) from FEM analysis

In FEM to determine the Strength Reduction Factor (SRF), Shear Strength Reduction (SSR) technique has been applied to the Mohr- Coulomb criterion using Phase 2 software. FoS results obtained by different methods of LEM were compared with critical SRF of FEM and are presented in Fig. 10. It is clearly observed that, critical SRF i.e. FoS obtained by FEM method has close agreement with Bishop Simplified method and comparatively lower than other LEM methods (Fig. 10). This can be interpreted by the fact that, FEM consider elastic parameters such as Young’s modulus and Poisson’s ratio in their material properties than LEM. Thus critical SRF calculated by FEM is more authentic and give true results. From FEM analysis the different slopes are critically stable to unstable condition, except location1, which is stable condition (Fig. 11).

Fig. 11
figure 11

Comparison of FoS obtained by LEM and FEM methods

Total displacement contour pattern (displayed with deformation vector) has been extracted from FE results to check the extent of possible damage zone (i.e. the zone of failure), their distribution and behaviour across the slope which also depicts deformation intensity and failure mechanism in various parts of the slope. At location 1, the critical SRF is found to be 1.26 which indicates fairly stable condition. The magnitude of displacement contour (Fig. 11) demonstrate that maximum displacement occurs at the top portion of the free face and gradually diminishes inward to the slope. The overall geometry of slope and discontinuity intersected in such a way that sliding plane daylights on the slope face. From the curvo planer displacement contour, it can be predicted that the slope will undergo wedge and shallow planar failure (which is also predicted from kinematic analysis) and shows the maximum displacement of 1.40e−004 m.

At location 2, the critical SRF is found to be 0.99 which indicates unstable condition. Slope is identified as vulnerable to failure especially in rainy season, where many hanging chunks at slope crest usually stuck between larger block and tree roots. Distribution of displacement contour shows the extent of maximum failure zone is mainly confined from crest to toe of the slope (Fig. 11). Based on the nature of distribution and extent of displacement contour, a curvo-planar type of failure can be predicted due to extensive jointing and smaller block size, whereas few active blocks sliding was also seen during field study. Infilling material with water pressure (in rainy season) in joints and fractures reduces stability by increasing the forces that induce sliding (Hoek and Bray, 1991). The impact of gravitational loading at location 2 (H = 55 m) is higher than location 2 (H = 40 m). It is speculated that deeper zone of failure will occur where maximum displacement analyzed in section of 1.40e−003 m.

At location 3, the critical SRF is found to be 1.15 which indicates fairly stable condition. In the field, slope is very disturbed due to blasting/mechanical excavation and there is rock fall from this cut section and the rock blocks are already getting detached from the slope (Fig. 5). Displacement contours has comparatively lower value than location 2 and location 1 and distributed in slightly curved-planer fashion from peak to toe and show maximum deformation at middle portion of the slope face (Fig. 11). Therefore it is assumed that shallower damage zone across cut section with maximum displacement of 1.50e−002 m. Persistence of bedding joint is high at this location and (Eberhardt et al. 2004) recommended that excavation processes continuously disturbed rock masses due to which persistent joints are likely to get exposed and enabling kinematic feasibility in cut slope. At location 4, the critical SRF is found to be 0.86 which indicates highly unstable condition. Displacement contour pattern at this location shows that the most vulnerable part is distributed from apex to middle portion of the free face, which imply possibility of shallow zone of failure. Here, the slope is excavated in such a way that wedges are freely hanging on the roadside (Fig. 3), which is more susceptible to failure especially in monsoon season. Even a small chunk of the block is very threatening to the moving vehicle and human lives. The steepness of slope and extent and nature of distribution of displacement contour show potential for step path failure (Fig. 11). At location 5, the critical SRF is found to be 1.02 which indicates critical instability condition. Damage zone is slightly deeper and distributed from apex to toe of slope (Fig. 11). Steepness and geometry of cut slope, the orientation of discontinuity and apportioning of displacement contour favours wedge failure or toppling.

6 Conclusions

To assess the stability analysis of road cut slopes along NH-7, between Shivpuri to Kaudiyala in Uttarakhand. Five most vulnerable slopes (selected) are studied empirically as well as numerically to find out the failure probability with their attributes. The petro-graphical studies of representative rock samples of phyllitic quartzite and quartzite’s mainly consist quartz, mica, feldspar and clay with some ferruginous minerals. The grains are generally crushed and fused with patches and compositional bands are formed during initial phase of metamorphism. The kinematic analysis showed mostly wedge failure with one or more toppling and planar failure, which has also seen during field visit. The RMR and GSI technique resulted almost same characteristics and revealed that rocks are mostly blocky with fair and good surface condition. The quantitative slope stability analysis using SMR, CSMR and CoSMR techniques for different slopes indicates comparably same result with good agreement, where slopes are partially stable in all the techniques, except location 4 is unstable in SMR and CSMR techniques. Further to improve the empirical results and to find stable slope angle during exaction, Qslope has been applied. The Qslope analysis shows location 1,2 and 4 has similar type of failure probability as in other empirical methods, while location 2 and 3 are unstable. To stable these slopes β angles have been derived for present Qslope values. As the slopes are partially stable and unstable from empirical slope analysis, further the cost effective numerical models (LEM & FEM) were also applied to enhance the study of slope stability and appropriate remedial measure.

The comparative result of FoS, in LEM and FEM evaluate that different locations are critically stable to unstable, except location 1, which is stable. In LEM method location 2 is also stable. The FoS, result also shows that Bishop Simplified method (LEM) has close agreement to FEM method than other LEM methods. Overall the FEM results and different empirical results evidenced that road cut slopes of Shivpuri to Kaudiyala in Uttarakhand are critically stable to unstable.